Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Beam expected in the afternoon PM: – Establish first-turn – Establish closed orbit – Rough correction of machine parameters Evening: – RF capture Night:
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
LHC progress Report LHCC Wednesday 23 rd March 2011.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
LHC Status Fri Morning 3-June
Ion Commissioning: Thursday & Friday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
LHC Commissioning with Beam
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Day :00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Summary of week 7 Hardware Commissioning:
Status of LHC Operations
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
Friday March 4th 08h32: Access for beam dump system.
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday February 28th 8h00: Injection
Friday morning 10:30 Optics measurements and corrections.
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday :20 beta beat corrections during squeeze for flat machine finished Afterwards fixing issues at injection: BPM rephrasing for B2 solved.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday 23/2 Thanks CRYO!!!.
Wednesday h18: 228b fill lost just before start of ramp.
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Daniel, Gianluca and Belen (for the Collimator team)
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Summary for LPC (March 7th, Ralph Assmann) Last week: Rocky… Plenty of access up to start of weekend. Up to 11h access per day. Many problems (see daily slides). Major impact: Feedback software and control. OK presently. Major impact: Beam dump problems. Many accesses. Rollback of software. More or less OK (still 1 problem per day). Brennan at LMC. Very smooth and efficient weekend (we need more weekends and less weekdays). 07-03-2011 LHC morning report

Where are we for 450 GeV? Injection optics and orbit OK. Aperture OK and measured. Measure DS aperture and response. RF system OK. Transverse damper OK. Feedbacks OK. Emittance small but not controlled. Injection ring collimation OK.. Machine protection OK. Some final adjustments to be done. Injection transfer line collimation OK. Checks to be completed for TI8. Then move to multi-bunch injection. 07-03-2011 LHC morning report

Full collimator + protection settings B1 07-03-2011 LHC morning report

Full collimator + protection settings B2 07-03-2011 LHC morning report

Loss map example 07-03-2011 LHC morning report

Where are we for the ramp? Pilot and nominal bunch. OK. Chromaticity, tune, orbit OK. RF blowup. OK. Some minor optimizations still ongoing. Philippe. Feedbacks OK. Transmission and lifetimes OK. Collimator ramp: To be done once endpoint is known (3.5 TeV setup) 07-03-2011 LHC morning report

Fine ramp with nominal bunch… 07-03-2011 LHC morning report

Lifetimes… 07-03-2011 LHC morning report

RF blowup and bunch length Philippe et al 07-03-2011 LHC morning report

Tune feedback and chroma 07-03-2011 LHC morning report

Where are we for 3.5 TeV? Chromaticity and tunes OK. Beta beat and coupling through squeeze OK. Beta* correction to be done with k-modulation. Squeeze with dynamic orbit reference OK. Sequence with feedbacks OK. Pilot collisions and vernier scans OK. Final 3.5 TeV reference orbit defined (nominal bunch). 30 – 40% of collimators calibrated for flat top. To be completed. Dump protection setup and check. To be done. Loss maps for qualification. Asynchronous dump tests. 07-03-2011 LHC morning report

Rogelio, Glenn, Ryoichi, Masamitsu, Rama B1 beta beat Rogelio, Glenn, Ryoichi, Masamitsu, Rama 07-03-2011 LHC morning report

Rogelio, Glenn, Ryoichi, Masamitsu, Rama B2 beta beat Rogelio, Glenn, Ryoichi, Masamitsu, Rama 07-03-2011 LHC morning report

Rogelio, Glenn, Ryoichi, Masamitsu, Rama B2 coupling Rogelio, Glenn, Ryoichi, Masamitsu, Rama 07-03-2011 LHC morning report

3.5 TeV Orbit High Intensity B1 07-03-2011 LHC morning report

3.5 TeV Orbit High Intensity B2 07-03-2011 LHC morning report

Shaving of Beam During Collimator Setup Coll team 07-03-2011 LHC morning report

Tune Shift from Single Collimator? B. Salvant and N. Mounet 07-03-2011 LHC morning report

IP beta values (Glenn Vanbavinckhove et al) Beam1 (after local and global correction): IP               b*x (ex)                 b*y(ey) IP1         1.68 (0.08)              1.62 (0.20) IP5         1.53 (0.18)              1.45 (0.72) Beam2 (after local correction, no global correction): IP1          1.43 (0.06)             1.62 (0.06) IP5          1.64 (0.16)              1.48 (0.03) 11.7% imbalance 9.5% imbalance To be refined and corrected with k-mod technique! 07-03-2011 LHC morning report

Beam-beam scan 07-03-2011 LHC morning report

Tiny but First Luminosity… 07-03-2011 LHC morning report

3e15 protons in? Not yet… 07-03-2011 LHC morning report

Ahead... Continue collimation & protection setup at flat top (before squeeze)… About two more shifts… Then qualification during night. TCDQ setup and tests. Asynch dump tests. Then: Ready for squeeze with nominal bunch… Squeeze to 1.5 m but do not collide Establish orbit Set up 16 tertiary collimators Qualification loss maps. Asynch dump tests. Then: Ready for collision… Collapse separation bump Vernier scans and establish good “colliding” orbit ~ Wed ~ Thu ~ Fri 07-03-2011 LHC morning report

Ahead... Ramp with collimators Preparation of multi-bunch injection Requires completion of 3.5 TeV collimation setup About 1-2 days for function generation Preparation of multi-bunch injection First multi-bunch injections today or tomorrow Correction of b* with k-modulation technique Measurement of aperture and BLM response in DS ~ Thu ongoing 07-03-2011 LHC morning report