Pricing and Margins Manager National Grid Distribution

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 186 January Assumptions No provision for TMA, Tax or Exit re-openers at this time (zero value in 2009/10 expected). AQ Review impact in October.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
7 th October 2010 energynetworks.org 1 PRESENTED BY Andrew Pace, WSC CHAIR Workstream C Long Term Products Common Methodology Group Work.
Mod 186 July Assumptions No provision for TMA or Tax re-openers at this time (zero value in 2009/10 expected). AQ Review impact in October 2009.
UK GAS DISTRIBUTION DN Charging Methodology Forum NGGD Oct-14 Mod0186 Dave Chalmers / Mike Lapper.
A layman’s guide to the structure of LDZ gas charges 27 July 2009 Please note – in the interests of clarity and accessibility, simplifications have been.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
LDZ System Charges – Structure Methodology 26 April 2010.
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
DNPD04 LDZ Exit Capacity Charges- Discussion Report Denis Aitchison 27 th July 2009.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
RbD Subgroup Dean Johnson 8 th April 2008 RbD Subgroup Dean Johnson 8 th April 2008.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Leakage Model Development Proposals – Shrinkage Forum Discussion Wednesday 14 December 2011.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Mod 0428 Charge Impact October Affected Supply Point Population.
Region At Least One Account Yorkshire & Humber15 / 15 West Midlands14 / 14 East Midlands8 / 9 North East7 / 12 North West20 / 23 East of England11 /
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
IGT and Shipper Workgroup meeting 28 th February 2011.
Customer Charge On behalf of all DNs 19 November 2010.
Unlocking a low carbon gas future
Background Current balance of LDZ System and Customer charges
Gas Distribution Charging
DNPC03 DNPC03, published in July 2007, changed the LDZ System Charges Capacity/Commodity split from 50:50 to 95:5 The 95:5 split was implemented on 1 October.
Modification 0282 Action 002 Update
User Pays Funding – Potential Licence Mechanism
Code Governance Review UNC Modification Proposals
Mod 186 Report Assumptions for 2013 DCMF 26 January 2009
Transmission Planning Code
Transmission Workstream 4th July 2007
Historical T&D charge volatility
Mod 0621 Amendments to Gas Transmission Charging Regime
UNC 0407 Analysis Scope - Update
LDZ System Charges – Structure Methodology 26 July 2010
Code Governance Review UNC Modification Proposals
NTS Entry Charging Review Update
Danishtah Parker 0621 Workgroup 26 April 2018
The Proposals Change the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible supply.
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
Exit Capacity Substitution and Revision
Questions for Consultation
0476 Alignment of DN Charging Methodology with RIIO-GD1 Arrangements
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Key movements from September 17
Presentation on behalf of all DNs Lorraine Goodall - SGN
Mod 0621 Amendments to Gas Transmission Charging Regime
Draft Mod: Update of default System Marginal Prices
Richard Fairholme E.ON UK
Assured Pressures Proposal
Mark Freeman 29th January 2007
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Denis Aitchison/Rob Hetherington
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Transmission Workstream DN Interruption Update - Introduction
Topic Register October 2009
Transmission Workstream, 1 Mar 07
Presentation transcript:

Pricing and Margins Manager National Grid Distribution Steve Armstrong Pricing and Margins Manager National Grid Distribution

Indicative Transportation Charges for Oct 2008

Indicative Transportation Charges for Oct 2008

Mod 186 – East of England

Mod 186 – East of England commentary

Mod 186 - London

Mod 186 – North West

Mod 186 – West Midlands

East of England – Mains and Services Replacement

London DN – Mains and Services Replacement

Potential Changes to Distribution Charges Balance of LDZ System and Customer charges Current approximate 70:30 split based on historical national analysis of costs Appropriate to update to reflect network costs Possible move to network-specific balance Analysis being undertaken by each network Not a methodology change – however Pricing Discussion paper highlighting impacts will be published Paper likely Summer 2008 Implementation targeted for April 2009

Potential Changes to Distribution Charges Update of Data Underlying LDZ System Charges Current national data includes: Probability of connection to pressure tier by load band Relative costs of different tiers Move to DN-specific data Utilising new samples of where loads are typically connected Dependent upon results may be simple update of current functions, with new parameters, or more fundamental change of function Update direct load and CSEP functions Expect to consult later this year Implementation targeted for April 2009

Potential Changes to Distribution Charges Update of Optional LDZ Charge Typically suitable for large loads close to NTS Based on alternative cost of laying stand-alone pipeline to NTS Not been updated since 2000 Appropriate to reflect latest cost estimates – these may vary by network Expect to consult later this year Implementation targeted for April 2009