Modification Proposal 136

Slides:



Advertisements
Similar presentations
MOD 326 – Allocation of Unidentified Gas Following the Appointment of the AUGE August 2010.
Advertisements

Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Individual Meter Point Reconciliation. What? Calculation of actual energy used at meter point level for all supply points Allow sites to be accurately.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal January 2010 Elaine Carr ScottishPower.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Customer Charge On behalf of all DNs 25 October 2010.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Project Nexus Workgroup Extension of Modification 0434 to permit retrospective updates pre-dating Project Nexus Go Live Date 9 th September 2014.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
Replacement of Any Read – Initial views. 2 Assumptions  Can’t re-open NDM Allocation or Energy Balancing after D+5  Can’t go back to a read before prevailing.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal February 2010 Karen Kennedy ScottishPower.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 Modification 0152V Implementation Matters 25 October 2007.
Customer Charge On behalf of all DNs 19 November 2010.
SoS Report PAC – 13th December 2016.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
Consideration of issues raised by UNC Modification Proposal 0244
Review Group 291- Ofgem Update
Code Governance Review UNC Modification Proposals
Options for Mod 640 Replacement
Review Group 178 SSP as Domestic only.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Modification th July 2008.
Project Nexus Workgroup
CSEPs Reconciliation Proposals
Modification 0117 – Additional Considerations
Impacts of Project Nexus Implementation Date to AQ17
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Gas Long Term Vacant (LTV) Proposal April 2010
Review Group 291- Ofgem Update
Mod Proposal 0268 : AQ Backstop Date
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
Transmission Workstream 2nd December 2010
Entry Overrun Calculation
Options for the Development of a Demand Side Response Mechanism
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Deferral of Retrospective Updates Functionality
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
MOD 640 INVOICING VALIDATION RULES
Modification 421 – Updates and Benefits Case
AQ Review System Calculation Overview
CONFIDENTIAL - Inter Shipper Discussion Process Initial Discussions © 24 November 2009 EDF Energy plc. All rights Reserved.
Actions Updates Action 0282/006 – Exclude from AQ process
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
REVIEW GROUP 178 – AN ALTERNATE SOLUTION
PN UNC Workgroup (AQ topic)
Further Considerations
Presentation transcript:

Modification Proposal 136 ‘Reconciliation following AQ Amendment where an SSP becomes an LSP prior to calculation of Provisional Annual Quantity’

Background Modification Proposals 094, 095 & 096 were raised in July 2006 Each sought to remove one of three exclusions to the Mod 640 arrangements. Code ref. E7.4.3 (a) (b) & (c) Mods 094 & 095 were approved in October 2006, however Mod 096 was rejected This proposal seeks to address the concerns raised in the Authority’s decision letter dated 30th October 2006

Modification Proposal 096 Within their decision letter, the Authority made reference that: ‘… the exclusion contained within E7.4.3 (c) and the ability to avoid the revision charge provides an incentive on shippers to proactively monitor and pursue threshold crosser appeal’. The decision letter further stated: ‘…in addition to correctly allocating costs to the individual LSP rather than the RbD sector at an earlier stage, we also consider that this should provide administrative efficiencies, encouraging appeals to be made throughout the year, rather than concentrated in the post-provisional AQ window’.

Modification Proposal 136 The remaining exclusion however also provides a perverse incentive upon Shippers to ensure that appeals are concluded prior to, and as close as possible to, the post-provisional AQ window. All Supply Points which have had successful appeals, prior to the post-provisional AQ window, will be excluded from the subsequent End of Year Reconciliation calculations and will not be subject to the resulting Annual Quantity Revision Difference Transportation Charges. This perverse incentive is further magnified as approximately 80% of annual consumption takes place during the winter months, within a window which begins at the commencement of the new Supply Point AQ (1st October) and the date when Provisional Annual Quantity calculations are undertaken by the xoserve (end of March).

Modification Proposal 136 Therefore all successful threshold crosser appeals undertaken within this window, will have a significant and detrimental impact to the RbD sector, due to the profile of annual gas consumption. This impact is compounded where appeals are undertaken at the last possible moment, where reads are taken at the end of the winter consumption period. This proposal seeks to maintain the incentives on Shippers to proactively monitor and pursue threshold crosser appeals, but also remove the existing perverse incentives. It is proposed that that where a successful threshold crosser appeal takes place, regardless of when the appeal is undertaken, that the Supply Point will not be excluded from the End of Year Reconciliation calculations.

Modification Proposal 136 This will ensure energy is allocated appropriately across market sectors and that the RbD sector is not exposed to undue volumes of unreconciled energy. As an incentive upon Shippers to undertake threshold crosser appeals, the modification further proposes that the Supply Point will not be exposed to the full resulting Annual Quantity Revision Difference Transportation Charge, but instead will only be charged a proportion of this charge, the proportion being 90%.

Modification Proposal 640 Adjustments For the 2004/5 Gas Year the unreconciled volume associated with this particular exclusion was 205,916 MWh. Based upon Mod 640 reconciliation invoices for the 2004/5 Gas Year, non-reconciliation of the above volume represents c£3m of misallocated charges between the SSP and LSP markets.

Next Steps Submission of proposal back to the April Modification Panel with recommendation to issue for consultation.