Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA

Slides:



Advertisements
Similar presentations
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 70 th GRPE th January 2015 Geneva Chair: Petter.
Advertisements

50th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal document GRSP (50th GRSP, December 2011, agenda item.
VIAQ IWG Vehicle Interior Air Quality Informal Working Group 1p Status report of the VIAQ (Vehicle Interior Air Quality) Informal Working Group Submitted.
Fourth progress report of the informal group on Phase 2 of gtr No. 9 (IG GTR9 - PH2) Transmitted by the experts of Japan and Germany Informal document.
Progress report of TFG 7 “Fire resistance test” Mar 19, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
Introduction to Revision of GTR 7
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 66 th GRPE 6-7 th June 2013 Geneva Chair Petter ÅSMAN.
VIAQ IWG Vehicle Interior Air Quality Informal Working Group 1p Progress Report of the VIAQ (Vehicle Interior Air Quality) Informal Working Group Report.
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 72 nd GRPE th January 2016 Geneva Chair: Adolfo.
VIAQ IWG Vehicle Interior Air Quality Informal Working Group 1p Progress Report of the VIAQ (Vehicle Interior Air Quality) Informal Working Group Report.
Progress report of TFG 7 “Fire resistance test” Mar. 3rd, 2016 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute.
Co-Sponsors: China, Japan, EU and US 59th Session GRSP May 9-13, 2016
Submitted by expert from the Republic of
Electric Vehicles and the Environment (EVE IWG)
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Tyre GTR # 16 Progress report
VIAQ (Vehicle Interior Air Quality) Informal Working Group
Progress Report by PSG IWG
Status report on the activities of TF-CS/OTA
Electric Vehicles and the Environment (EVE IWG)
Report Task Force UNR46 5th Meeting OICA Paris, 26-27th September 2016
Japan proposal on schedule
Status Report to GRB #68 Task Force on Reverse Warning issues
OICA Proposal: Decision on Deployed Testing of DPPS
Task Force Outline Submitted by an expert from the Republic of Korea
Final Report of TF-CS/OTA September The Amba Hotel, London
Report and explanation document of SBR-TF
Outcome of TFCS-12 - summary slides - (detailed meeting minutes will be provided separately) April The Shilla Seoul, ROK.
Transmitted by the IWVTA Informal Group
Status report / Activity Plan of OBD Task Force
Submitted by the expert from Republic of Korea
Proposals from the Informal Working Group on AEBS
Note by the secretariat
VIAQ (Vehicle Interior Air Quality) Informal Working Group
Informal document GRE-79-04
VIAQ (Vehicle Interior Air Quality) Informal Working Group
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Introduction to Revision of GTR 7
Electric Vehicles and the Environment (EVE IWG)
Informal document GRPE-78-23
Status Report to GRB #69 Task Force on Reverse Warning issues
Chair: Jin Seop Park, Republic of Korea Secretary: Irina Dausse, OICA
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
Informal document GRVA st GRVA, September 2018
IEEE IMT-Advanced Review Process
Status report of TF-CS/OTA
Test Procedure of Deployable Systems for Pedestrian Protection
Chair: Petter ÅSMAN Secretary: Thomas VERCAMMEN
Progress Report GRE TF AVSR
IEEE IMT-Advanced Review Process
Review of the 1958 Agreement
Why a „test phase“? Overview
Drafting Group: Final Meeting Drafting Group: 1st Meeting
Task-force on reverse warning signal CURRENT STATUS in United nations C-WGN 16th – Wuhan – December 11, 2018.
Overview of the recommendations on software updates
(Task 43 of the IWG Task List)
Highlights of the 177th WP.29 session and
Progress Report by PSG IWG
Inputs Regard to “Test Phase” to TFCS
Progress Report GRE TF AVSR
Introduction to Revision of GTR 7
Status report of OBD Task Force
Dr. Hans Holdik Dongseok CHOI / Ph.D.
Report to 178th WP.29 session from the 35th IWG on DETA meeting
Note by the secretariat
UNECE IWG on EPPR for L-category vehicles
Informal document GRE-79-xx
GRB informal group R51.03 Annex 10
EDR/DSSAD IWG Status Report
Presentation transcript:

Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA Submitted by IWG-DPPS Chair and Secretary Informal document GRSP-63-19 63rd GRSP, 14-18 MAY 2018 Agenda item 3-(c) Status Report of the Informal Working Group of Deployable Pedestrian Protection Systems (IWG-DPPS) 63rd GRSP Session 14 – 18 MAY 2018 Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA

Background Background - Republic of Korea suggested the clarification of the test procedure for deployable pedestrian protection systems (56th session of GRSP, Dec. 2014) - WP.29 and AC.3 endorsed the request for authorization to develop an amendment to GTR No.9 in Task Force (170th session of WP.29 and 48th session of AC3, Nov. 2016) - TF-DPPS met during 7 - 8 Feb. 2017 in Paris, 28 - 29 Mar. 2017 in Paris, 7 Sep. 2017 in a web meeting, 21 - 23 Nov. 2017 in Berlin - WP.29 and AC.3 endorsed the revision of the authorization to develop an amendment to GTR No.9, transforming the TF into an IWG (174th session of WP.29 and 52nd session of AC3, Mar. 2018)

Objective Objective - To develop an amendment to GTR No.9 for a test procedure for deployable pedestrian protection systems, i.e. deployable bonnets or external airbags - To develop new and more detailed requirements, so that the new procedure guarantees that deployable systems are correctly activated as designed to protect pedestrians and other vulnerable road users, and at least the same level of protection as non-deployable systems - To consider the development of a corresponding proposal to amend the UN R 127 on Pedestrian Safety

Informal Working Group 1st IWG-DPPS meeting - Date: 18 – 20 Apr. 2018 - Location: KIA Motors Office, Frankfurt, Germany Review and Draft Terms of Reference - Discussion: the objective and time schedule, etc. - Operation: Chair (Republic of Korea), Secretary (OICA) Contents - Drafting a milestone plan including specific tasks - Forming a sub-group to discuss controversial issues

Timeline • Plan and Schedule 2017 2018 2019 2020 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 WP.29 GRSP IWG 173 174 175 176 177 178 179 180 62 63 64 65 66 67 Report Formal Doc. 1 2 3 4 5 Informal Doc. IWG approval IWG mandate (requested) Request for the extension of IWG-DPPS mandate to Jun. 2020

Milestone Agreement on technical requirements: 2nd IWG-DPPS - DPPS tasks (Pre-requisites, Verification, Headform Tests) - Generating performance requirements - Deciding on marking procedure Agreement on test execution procedural details: 3rd IWG-DPPS Decision on open IWG items in GRSP: May 2019 GRSP Documentation: 4th IWG-DPPS - Outline of the document - Draft wording - Finalized IWG wording proposal to GRSP - Recommendation of transitional period

Status of Amendment Discussion IWG is making progress based on 25 discussion items for the amendment Prerequisite & Criteria Information to be submitted, HBM requirement, Simulation requirement, Protection requirement below lower deployment threshold, Protection requirement at higher speed, Bonnet deflection requirements due to body loading, etc. Verification Total response time test, Deployment test, Test for protection requirement below lower threshold, Test for protection requirement at higher speed Headform Test Static test at the undeployed position, Static test at the deployed position, Dynamic test, Partial dynamic test Sub-group is preparing the discussion on the controversial items (blue above) in IWG Contracting Parties will discuss the items to reach the agreement

Next IWG Meeting 2nd Meeting - In Brussels, Belgium, 4 – 6 Sep. 2018 - Agreement on technical requirements - Generating performance requirements - Deciding on marking procedure 3rd Meeting - Geneva, Switzerland, the day prior to the 64th GRSP(tbd) - Agreement on test execution procedural details

Thank you for your attention!