Technical Stop #4 29th August - 2nd September 2011

Slides:



Advertisements
Similar presentations
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Advertisements

CRYOGENICS AND POWERING
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
05:31 Beam dump due to QPS trigger in sector 78.  Quench heaters discharged in MB10.L8. 07:28 Quench heaters charged ok again in cell B10L8.  Was a EN/EL.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
Running scenario 2009/10 Run through components – and then synthesis.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
DRY RUNS 2015 Status and program of the Dry Runs in 2015
1st LHC MD Period Started
Wednesday 3rd October - morning
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
The LHC - Status Is COLD Is almost fully commissioned
LHC-TS3 Coordination meeting #3
Julie Coupard Schedule and Coordination
Summary Friday h38: Ramp down and pre-cycle.
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Powering from short circuit tests up to nominal
Summary of week 7 Hardware Commissioning:
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Summary of ion week 48 Last beam OP summary of 2010 Week 48
Summary week 31 Week 31 G. Arduini & O. Brüning
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Thursday morning – optics correction
Technical Stop #4 29th August - 2nd September 2011
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Machine Protection Xu Hongliang.
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Summary of Week 13 G. Arduini, B. Holzer
Summary of Week 16 G. Arduini, J. Wenninger
M. Zerlauth, I. Romera 0v1.
LHC Morning Meeting - G. Arduini
Week 35 – Technical Stop and Restart
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Saturday 28/4 06:30 staring injection and transfer line steering.
Planning at 5 o’clock meeting Friday
Thursday :00: Physics fill from the night shift
LHC Morning Meeting - G. Arduini
Yesterday’s morning’s controls issues
Technical Stop #4 29th August - 2nd September 2011
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday Ramp single nominal bunches for loss maps
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
1v1.
LHC installation status
Friday 25 bunch fill dumped just before (BLM in 5)
LHC - Week 38 Technical stop: Katy Foraz
Summary Tuesday h23: Machine closed. Precycle started.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Coordination: Eva Barbara Holzer, Mike Lamont
Friday 15th February - morning
Thursday 20th July - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday Access…. QPS intervention at 09:00 in point 8 (quench heater exchange) QPS installation oscillo for the ISRM measurement EPC intervention in point.
Monday 27th August & night
Review of hardware commissioning
Thursday 10:00 Fill 1986 in stable beams.
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

Technical Stop #4 29th August - 2nd September 2011 Day 3 Julie Coupard Schedule and Coordination LHC-TS4 - 01/09/2011 J.Coupard

Summary after Day 3 Cryogenics Cabling Beam Instrumentation Kickers Done Intervention on oil pipes @Pt6 on surface Cabling Ongoing BLM @Pt3 Ongoing NG18 replacement @Pt3 Ongoing Thermo-switch @Pt1&2 Ongoing Monitoring cryo @Pt4 Beam Instrumentation Ongoing BLM: Direct beam dump connection to dump system BPM: New firmware and SW to increase IIR filter order Kickers Done Change of generator pos K @Pt6 – revalidation tests ongoing Done Change of generator HV switch @Pt2 – revalidation tests ongoing Machine Protection Done Adjustment of 600 A Energy Extraction Switches DQEMC.UA63.RQTD.A56B1 – test to perform DQEMC.UA43.RCS.A34B1 – test to perform LHC-TS4 - 01/09/2011 J.Coupard

Powering Tests LHC-TS4 - 01/09/2011 J.Coupard Circuit Test Current Length Constraints UPS DFB concerned Patrol CRYO OK Lock When RCBCV9.R3B2 R meas (MP3)   These tests will be done during the day with very low current and presence of people P3 P4 NO A34 Mon RCBCH7.R3B1 RD3.R4 ISRM meas (MP3) ~3000 A 2h ElQA after PXI inst P4 DFBMK P 4 5 6 MR4 Wed RD4.R4, RQ5.R4 DFBML RQ6.R4 P6 DFBMG P 6 7 8 Thu RQD/F.A56 Quench propagation test I_nom tbd Powering phase II P5 P6 DFBAJ DFBAK P4 P5 P6 A56 Wed (& Thu ???) RQD/F.A45 Multiple FPA see below 6h P4 P5 DFBAH DFBAI A45 RU.L4 Test on zero-offset reset 400 A DFBME ML4 LHC-TS4 - 01/09/2011 J.Coupard

Status of patrol Pt8 Thursday 17h Pt1 Friday 17h Pt2 Friday 7h30 LHC-TS4 - 01/09/2011 J.Coupard

Program for Friday Deconsignation of injection lines (Ti2, Ti8) on Friday afternoon Steve Hutchins will take the SPS keys for LHC extraction so the LHC will remain safe during the Patrols on Friday evening Last patrols at 17h Point 1 End of the Technical Stop around 18h30 (if no more patrols) People in CCC to give the green light for beam : S.Hutchins EIC : L.Ponce LHC-TS4 - 01/09/2011 J.Coupard