Title Here Departure Future of Boeing Timeline/ Financials Landing Supply Chain Existing Solution Proposed Solution Supplier Boeing supervision office.

Slides:



Advertisements
Similar presentations
SROI Report Card: Year Six October 2007 – September
Advertisements

Analysis of Financial Statements
Unleashing the Power In Your Clients Numbers A Financial Toolbox To Business Success April 13 & 15, 2010 Rick Hermonot Farm Business Consultant Farm Credit.
Agenda Item 8.4: Trade and the crisis Infrastructure: Recent developments and outlook for traffic flows and capacities.
Hans Timmer and Richard Newfarmer World Bank December, 2006 Global Economic Prospects, 2007 Managing the Next of Globalization.
16 th April 2008 Energy Outlook View of an International Oil Company Thierry PFLIMLIN President & CEO Total Oil Asia-Pacific Pte Ltd 2 nd ARF Seminar on.
Joint SA-SEAP Ozone Officers Network Meeting Pattaya, Thailand October 2012 CHALLENGES FOR HCFC PHASE-OUT IN AIR CONDITIONING.
Cross-Border Infrastructure: A Toolkit Financial Analysis Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad The views expressed.
Air Deccan - Cutting Costs, Not Corners The Story of Indias First Low Cost Airline Fin 456-Team 9: Ruchika Chinda, Ruibin Chen, Rishi Gupta, Anuj Sharma.
Agenda: A little more vocabulary C-V-P analysis Thursday’s class
Current State of the Industry General Aviation Manufacturers Association.
The Minimum Price Contract. Purpose of a Minimum Price Contract Minimum price contracts are one of the marketing tools available to producers to help.
An Introduction to International Economics
NellFinancial Consultant StephenRisk Consultant AmyMarketing Consultant FevziGeneral Consultant TubaMarketing Consultant Hye YoungChief Consultant HakanMarketing.
© 2002 Prentice Hall Business PublishingPrinciples of Economics, 6/eKarl Case, Ray Fair The Capital Market.
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Capacity Planning For Products and Services
Reporting and Interpreting Cost of Goods Sold and Inventory
Managing Economic Exposure And Translation Exposure 12 Chapter South-Western/Thomson Learning © 2003.
THE COST OF CAPITAL © 2000 South-Western College Publishing
Cost-Revenue Analysis for Decision Making
Internal Analysis.
Accenture Plc (ACN) Analysts: Chris Landqvist, Justin Pippitt, Kelli Coldiron & Wei Pi.
Tourism Economics TRM 490 Dr. Zongqing Zhou Chapter 5: Airline Economics.
Hub and Spoke vs. Point to Point Evan Demick February 28, 2013.
January 2015 GLOBAL COMPETITIVENESS FORUM At the Crossroads How Saudi Arabia can Leverage its Unique Position and Become a Leader in Global Transport Dr.
Pricing Strategy Considerations for a New Business A Macro Overview of Setting & Influencing Prices Class 26 Marketing Pricing Strategies Tuesday November.
Airbus A380 Peter Wenham Lessor EVP - Technical Ahead of its time? Novus Aviation Capital - Dubai.
Welcome to class of Airline Simulation Game by Dr. Satyendra Singh University of Winnipeg Canada.
The Global Large Aircraft Market. Outline Objective Industry History Boeing Corporation Airbus Industrie Industry Competition Large Aircraft Competitive.
Route Planning and Evaluation
Project Planning and Capital Budgeting
Aircraft The Market Michelin participates in all segments of the aviation industry.
EATS 2007 Maintenance Conference Aviation Maintenance Market Outlook Berlin October 17, © All rights reserved. VZM Management Services.
1 Financial results of JSC “Aeroflot” as of 2003 In accordance with IAS Deputy General Director for finance and planning Mikhail I.Poluboyarinov.
Input Demand: The Capital Market and the Investment Decision.
Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.
Fourth Quarter & Full Year 2007 Results Presentation January 30, 2008.
INTERIM RESULTS » 2 AGENDA Overview & Operating Environment Performance – Long Haul Airline – Short Haul Airline Domestic Tasman & Pacific Islands.
Air Transport Association May 21,2002 NET INCOME U.S. Scheduled Airlines
Pro Forma Income Statement Projected or “future” financial statements. The idea is to write down a sequence of financial statements that represent expectations.
April 27, Atlas Copco Group Q1 Results April 27, 2005.
October 24, Atlas Copco Group Q3 Results October 24, 2006.
Simulation Debrief December 7 th Executive Team President: Clay Bridges VP Sales: Miu Goto VP Marketing: Casie Huffman VP Production: Robb Harper.
TEAM 1 – Airbus AXX Future of Air Transportation and Possible Air Response.
Containing Aviation Emissions in the Short-term
OPIM 5894 ADVANCED PROJECT MANAGEMENT AIRBUS 3XX: DEVELOPING THE WORLD’S LARGEST JET Team 3 Richard Buskey Vijay Gadigeppa Jonathan Koenig Daniel Mahzonni.
10.1 Input Demand: The Capital Market and the Investment Decision Capital are those goods produced by the economic system that are used as inputs to produce.
October 21, 2005www.atlascopco.com1 Atlas Copco Group Q3 Results October 21, 2005.
2014 Airbus Creating better ways to fly Airbus corporate presentation.
Lecture 9: The Economic & Political Role of Airports By: Zuliana Ismail.
Atlas Copco Group Q1 Results April 29, Page 2 April 29, 2002www.atlascopco-group.com Contents  Q1 Highlights and Strategic Moves  Market Development.
Atlas Copco Group Q2 Results July 17, Contents  Q2 Business Highlights  Market Development  Business Areas  Financials  Outlook.
Atlas Copco Group Q1 Results Stockholm, April 26, 2001.
Giulio Mazzalupi Atlas Copco Group - Q4 Results Stockholm, February 12, 2001.
Atlas Copco Group Q1 Results April 28, Contents  Q1 Business Highlights  Market Development  Business Areas  Financials  Outlook.
Tom Crabtree Boeing Commercial Airplanes 17 November 2006 Tom Crabtree Boeing Commercial Airplanes 17 November 2006 Historic & Future Air Cargo Markets.
© ATAG INTRODUCING… AIR TRANSPORT.
Moog Inc. CFA Investment Research Challenge Canisius College Team Kevin Kuhlmann Daniel Schmitt Steve Jerz Thomas DiNunzio Anthony Magnano.
Building and Valuing the Business Model
UAL Jonathan Bocanegra.
Colloquium on Environmental Aspects of Aviation
AAE 251 Vehicle of the Week: Boeing 787 Dreamliner
NET INCOME U.S. Scheduled Airlines $ Billions
DOA Facilities Management Airline Industry Growth Trends
The Battle of Value Fedex Corp. vs United Parcel Service Inc.
Challenges Facing training the Aviation Industry Professionals
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Worldwide Aircraft Doors Market to exceed $9.5 Bn by 2025.
Competitive Analysis: American Airlines
Presentation transcript:

Title Here Departure Future of Boeing Timeline/ Financials Landing Supply Chain Existing Solution Proposed Solution Supplier Boeing supervision office Supplier Separate liaison of Boeing Design & technician support Patching and Redesigning: Our View to the Horizon Fengshui Taskforce Patrick Hoey Pamela Rosales Varun Sarawagi Amy Wei

Current Situation Departure Future of Boeing Timeline/ Financials Landing Supply Chain 57 days $1.3 billion revenue loss 4-year contract signed Workers on strike 3 times, 1.5 years in delay Penalty $2 billion Supplier delay Supply chain problem of Boeing 787: the Dreamliner

Industry outlook Departure Future of Boeing Timeline/ Financials Landing Supply Chain Fuel efficiency 14,000 aircraft to be replaced by eco-efficient types bio fuels could provide up to 30% of all commercial jet fuel by 2030 Point to Point long range flight 34% more long-haul route in 20 years (from 1158 to 1546) Demand from Asian Passenger traffic in China would surge over 8.0% annually

Agenda Departure Future of Boeing Timeline/ Financials Landing Supply Chain Minimize delay in delivery Maximize passenger/fuel rate Create airplanes for the future Goal Supply chain No strike danger Separate liaison Discount airlines Patch Supply Chain labor reinforcement Competition regime 3 Fs (Fuel, Farther, Faster) Explore Asian market Redesign

Competitive advantage Departure Future of Boeing Timeline/ Financials Landing Supply Chain Boeing: Innovation Strong management Diverse product range Relatively efficient delivery Airbus: Capacity Government subsidy

Labor Relations Timeline Departure Future of Boeing Timeline/ Financials Landing Supply Chain 1993: 1-day strike 2000: 40- day strike 2008:57-day strike, lost $1.3 billion in cash - 4-year contract - 10 years without strike - 4-year contract - 10 years without strike

Aging Workforce Departure Future of Boeing Timeline/ Financials Landing Supply Chain AGING BABY BOOM GENERATION Average age of Boeing employees is 46 Eligible to retire in 10 years We expect up to 8,000 employees to retire each year

Patching the Workforce Departure Future of Boeing Timeline/ Financials Landing Supply Chain Retaining critical skills: Option Contract Mentoring the new employees Skilled Employees Offer Competitive Pay and Benefits: Bonus atached to amount of production Retraining workers : assign new tasks Unskilled Employees

Supply Chain Departure Future of Boeing Timeline/ Financials Landing Supply Chain Build to printBuild to performance

Departure Future of Boeing Timeline/ Financials Landing Supply Chain Existing Solution Proposed Solution Supplier Boeing supervision office Supplier Separate liaison of Boeing Design & technician support Patching the Supply Chain

Departure Future of Boeing Timeline/ Financials Landing Supply Chain Multiple bids from suppliers: Delivery efficiency Quality Price Engine and critical parts Miscellaneous Parts Redesigning the Supply Chain

Whats on the Horizon Departure Future of Boeing Timeline/ Financials Landing Supply Chain Low Cost Airlines Growing Market share Emphasis on Economy Opportunities Why How to deploy Time Frame Short-term (Patch)

Departure Future of Boeing Timeline/ Financials Landing Supply Chain Benefits Target Market Emphasis New Technology Composite Materials Economy Fuel efficiency Lower maintenance cost Low Cost & Premium Airlines Plane lifespan Environment Reduced carbon footprint Comfort Premium Airlines Marketing the Dream(liner)

Whats on the Horizon Departure Future of Boeing Timeline/ Financials Landing Supply Chain Low Cost Airlines Growing Market share Emphasis on Economy Improved planes Out-develop competitors Fuel Efficient, Farther, Faster Opportunities Why How to deploy Time Frame Short-term (Patch) Long-term (Redesign)

The New Dream Departure Future of Boeing Timeline/ Financials Landing Supply Chain Airbus A380 (2007) Lack of Demand (Flawed projections) Lack of Innovation Congested Airports Last game changer Concorde (1967) Fuel consumption Viability Boeing 777 (1995) Range of 9,380 nmi Meet with warm demand Boeing 787 Dreamliner (2010) First of its kind 14,000+ Eco-efficient aircraft in 20 years More Passengers Faster Further Fuel efficiency Combine the 3 Fs Fuel efficiency Further

Whats on the Horizon Departure Future of Boeing Timeline/ Financials Landing Supply Chain Low Cost Airlines Growing Market share Emphasis on Economy Improve planes Out-develop competitors Fuel Efficient, Farther, Faster Developing Nations Fastest grow markets Manufacturing in these nations Opportunities Why How to deploy Time Frame Short-term (Patch) Long-term (Redesign) Long-term

Asian Market Enterance Departure Future of Boeing Timeline/ Financials Landing Supply Chain Asia will account for 31% of orders of next 20 years ProtectionismGovernment controls the purchase of most airlines Developing suppliers will help break into Asian Market

Mitigating Risks Departure Future of Boeing Timeline/ Financials Landing Supply Chain Risks Chinese and Japanese Government Aircraft Airbus already has JV in China (2008) Protect Technology Cannot compete with our innovation and size Currency Risk Economic Risk (dollar up= cost of plane up)

Timeline Departure Future of Boeing Timeline/ Financials Landing Supply Chain Developing Our line Patch Redesign Market to Low cost Airlines Tap into Asian Market Fuel efficiency, Further, Faster Have more suppliers compete (China & India) Retrain and Standardize Separate Liaison offices

Financial Analysis Departure Future of Boeing Timeline/ Financials Landing Supply Chain % increase in Revenue (LCC/ 3 F's) 0.02 % increase in Revenue (Asian sales) 0.00 Total Revenue68,281,00069,646,62071,039,55272,460,34373,909,550 CF of Increased sales 1,365,6201,392,9321,420,7911,449,207 Cost of Goods Sold (1,092,496)(1,114,346)(1,136,633)(1,159,365) Gross Margin 273,124278,586284,158289,841 SG&A (72,651)(74,104)(75,586)(77,098) Savings on Supplies 696,466710,396724,603739,096 R&D (3 F's) (1,200,000) Liaison Offices (Sales, MGMT & Consulting) (100,000) Marketing 3 F enhanced planes (200,000) Depreciation 0000 EBIT (603,061)(585,122)(566,824)(548,161) Taxes 199,010193,090187,052180,893 Net Income (404,051)(392,032)(379,772)(367,268) Add Back Dep 0000 Change in NWC00000 Capital Expenditures 0000 Cash Flows0(404,051)(392,032)(379,772)(367,268) Terminal Value WACC8.74% NPV9,490,805 ….2020

Financial Analysis Departure Future of Boeing Timeline/ Financials Landing Supply Chain % increase in Revenue (LCC/ 3 F's) 0.02 % increase in Revenue (Asian sales) 0.00 Total Revenue68,281,00069,646,62071,039,55272,460,34373,909,550 CF of Increased sales 1,365,6201,392,9321,420,7911,449,207 Cost of Goods Sold (1,092,496)(1,114,346)(1,136,633)(1,159,365) Gross Margin 273,124278,586284,158289,841 SG&A (72,651)(74,104)(75,586)(77,098) Savings on Supplies 696,466710,396724,603739,096 R&D (3 F's) (1,200,000) Liaison Offices (Sales, MGMT & Consulting) (100,000) Marketing 3 F enhanced planes (200,000) Depreciation 0000 EBIT (603,061)(585,122)(566,824)(548,161) Taxes 199,010193,090187,052180,893 Net Income (404,051)(392,032)(379,772)(367,268) Add Back Dep 0000 Change in NWC00000 Capital Expenditures 0000 Cash Flows0(404,051)(392,032)(379,772)(367,268) Terminal Value WACC8.74% NPV9,490,805 ….2020

Financial Analysis Departure Future of Boeing Timeline/ Financials Landing Supply Chain % increase in Revenue (LCC/ 3 F's) 0.02 % increase in Revenue (Asian sales) 0.00 Total Revenue68,281,00069,646,62071,039,55272,460,34373,909,550 CF of Increased sales 1,365,6201,392,9321,420,7911,449,207 Cost of Goods Sold (1,092,496)(1,114,346)(1,136,633)(1,159,365) Gross Margin 273,124278,586284,158289,841 SG&A (72,651)(74,104)(75,586)(77,098) Savings on Supplies 696,466710,396724,603739,096 R&D (3 F's) (1,200,000) Liaison Offices (Sales, MGMT & Consulting) (100,000) Marketing 3 F enhanced planes (200,000) Depreciation 0000 EBIT (603,061)(585,122)(566,824)(548,161) Taxes 199,010193,090187,052180,893 Net Income (404,051)(392,032)(379,772)(367,268) Add Back Dep 0000 Change in NWC00000 Capital Expenditures 0000 Cash Flows0(404,051)(392,032)(379,772)(367,268) Terminal Value WACC8.74% NPV9,490,805 ….2020

Financial Analysis Departure Future of Boeing Timeline/ Financials Landing Supply Chain % increase in Revenue (LCC/ 3 F's) 0.02 % increase in Revenue (Asian sales) 0.00 Total Revenue68,281,00069,646,62071,039,55272,460,34373,909,550 CF of Increased sales 1,365,6201,392,9321,420,7911,449,207 Cost of Goods Sold (1,092,496)(1,114,346)(1,136,633)(1,159,365) Gross Margin 273,124278,586284,158289,841 SG&A (72,651)(74,104)(75,586)(77,098) Savings on Supplies 696,466710,396724,603739,096 R&D (3 F's) (1,200,000) Liaison Offices (Sales, MGMT & Consulting) (100,000) Marketing 3 F enhanced planes (200,000) Depreciation 0000 EBIT (603,061)(585,122)(566,824)(548,161) Taxes 199,010193,090187,052180,893 Net Income (404,051)(392,032)(379,772)(367,268) Add Back Dep 0000 Change in NWC00000 Capital Expenditures 0000 Cash Flows0(404,051)(392,032)(379,772)(367,268) Terminal Value WACC8.74% NPV9,490,805 ….2020

Financial Analysis Departure Future of Boeing Timeline/ Financials Landing Supply Chain % increase in Revenue (LCC/ 3 F's) 0.02 % increase in Revenue (Asian sales) 0.00 Total Revenue68,281,00069,646,62071,039,55272,460,34373,909,550 CF of Increased sales 1,365,6201,392,9321,420,7911,449,207 Cost of Goods Sold (1,092,496)(1,114,346)(1,136,633)(1,159,365) Gross Margin 273,124278,586284,158289,841 SG&A (72,651)(74,104)(75,586)(77,098) Savings on Supplies 696,466710,396724,603739,096 R&D (3 F's) (1,200,000) Liaison Offices (Sales, MGMT & Consulting) (100,000) Marketing 3 F enhanced planes (200,000) Depreciation 0000 EBIT (603,061)(585,122)(566,824)(548,161) Taxes 199,010193,090187,052180,893 Net Income (404,051)(392,032)(379,772)(367,268) Add Back Dep 0000 Change in NWC00000 Capital Expenditures 0000 Cash Flows0(404,051)(392,032)(379,772)(367,268) Terminal Value WACC8.74% NPV9,490,805 ….2020

Financial Analysis Departure Future of Boeing Timeline/ Financials Landing Supply Chain % increase in Revenue (LCC/ 3 F's) 0.02 % increase in Revenue (Asian sales) 0.00 Total Revenue68,281,00069,646,62071,039,55272,460,34373,909,550 CF of Increased sales 1,365,6201,392,9321,420,7911,449,207 Cost of Goods Sold (1,092,496)(1,114,346)(1,136,633)(1,159,365) Gross Margin 273,124278,586284,158289,841 SG&A (72,651)(74,104)(75,586)(77,098) Savings on Supplies 696,466710,396724,603739,096 R&D (3 F's) (1,200,000) Liaison Offices (Sales, MGMT & Consulting) (100,000) Marketing 3 F enhanced planes (200,000) Depreciation 0000 EBIT (603,061)(585,122)(566,824)(548,161) Taxes 199,010193,090187,052180,893 Net Income (404,051)(392,032)(379,772)(367,268) Add Back Dep 0000 Change in NWC00000 Capital Expenditures 0000 Cash Flows0(404,051)(392,032)(379,772)(367,268) Terminal Value WACC8.74% NPV9,490,805 ….2020 NPV= $9.5 billion

Sensitivity Analysis Departure Future of Boeing Timeline/ Financials Landing Supply Chain DropRise WACC (+/- 5%)55%124% % increase in Revenue (LCC/ 3 F's)46%59% % increase in Revenue (Asian sales)40%49% COGS53% SG&A82%53% R&D (3 F's)8%

Mitigating Risks Departure Future of Boeing Timeline/ Financials Landing Supply Chain Risks Threat of Chinese and Japanese Government Aircraft Airbus already has JV in China (2008) Protect Technology Cannot compete with our innovation and size Currency Risk Hedging

Conclusion Departure Future of Boeing Timeline/ Financials Landing Supply Chain Patches Redesigns Future

Apendix Appendix: Comparison between Boeing 787 Appendix: Comparison between Boeing 787 Appendix: Direct non stop scheduled flights to mainland ChinaAppendix: Direct non stop scheduled flights to mainland China Appendix: Capacity vs. Traffic balance Appendix: Growth vs. Capacity Appendix: Asian-Pacific market Appendix: Latin America, Middle East & Africa market Appendix: Latin America, Middle East & Africa market Appendix: Fred traffic: High potential in China Appendix: Commercial Air Tranport Scorecard

Appendix: Comparison between Boeign 787 Boeing 787Airbus 350 Fuselage and wing material Composites Fuel efficiency20% reduction in fuel consumption 8% lower operating cost than Boeing 787 (20 per cent lower cash operating costs per seat and fuel efficiency improvements of up to 25 per cent per seat) SpeedMach.85Mach.92 Cargo capacity x ld3 EnginesGE / RRRR Passenger capacity Range m m Launch dateLaunched2013 Orders Boeing 787Airbus 350 Fuselage and wing materialComposites Fuel efficiency20% reduction in fuel consumption 8% lower operating cost than Boeing 787 (20 per cent lower cash operating costs per seat and fuel efficiency improvements of up to 25 per cent per seat) SpeedMach.85Mach.92 Cargo capacity x ld3 EnginesGE / RRRR Passenger capacity Range m m Launch dateLaunched2013 Orders850500

Appendix: Direct non stop scheduled flights to mainland China Boeing 787Airbus 350 Fuselage and wing material Composites Fuel efficiency20% reduction in fuel consumption 8% lower operating cost than Boeing 787 (20 per cent lower cash operating costs per seat and fuel efficiency improvements of up to 25 per cent per seat) SpeedMach.85Mach.92 Cargo capacity x ld3 EnginesGE / RRRR Passenger capacity Range m m Launch dateLaunched2013 Orders850500

Appendix: Direct non stop scheduled flights to mainland China

Appendix: Capacity vs. Traffic balance

Appendix: Growth vs. Capacity

Appendix: Asian-Pacific market

Appendix: Latin America, Middle East &Africa market

Appendix: Fred traffic: High potential in China

Appendix: Freighter fleet: high potential Asia-Pacific

Appendix: Commercial Air Tranport Scorecard