The Philex disaster The foreseen long-term damage is irreversible,

Slides:



Advertisements
Similar presentations
World Cotton Market: Trends in Supply and Use
Advertisements

TEAM TWO ALTERNATIVE ADD WATER PROJECT May 20, 2009.
Armenias Millennium Challenge Account: Assessing Impacts Ken Fortson, MPR Ester Hakobyan, MCA Anahit Petrosyan, MCA Anu Rangarajan, MPR Rebecca Tunstall,
Regional Policy Common Indicators: Infrastructure Definitions and Discussion Brussels, 22 nd November
Superdam by Mel Boring.

Green Datacenters solution March 17, 2009 By: Sanjay Sharma.
Education & Full Employment Garry Jacobs World Academy of Art & Science Dream of a Global Knowledge Society Inter-University Centre, Dubrovnik, Sept 8,
1 Socio-Economic Benefits Assessment on Weather Service in China Dr. LV Minghui Meeting of The WMO Forum: Social and Economic Applications and Benefits.
IMPORTANT FINDINGS ACROSS CATEGORIES: Potential Studies for the Next Phase Center for Environmental Geomatics Climate Studies Division Manila Observatory.
DIASPORA HOMES (K) Ltd Providing housing space to eradicate slums By ERNEST KAMAU Tel /5 Nairobi, Kenya.
3.2.3 Coping with the Effects of Disaster: The Bulaon Resettlement Project in Pampanga, Philippines 1 UPA Package 3, Module 2 COPING WITH THE EFFECTS OF.
YIN Jie China National Cleaner Production Center CP Promotion Law in China
Planning best practice tailings disposal, management and rehabilitation strategies Presented by Mike Gowan.
China Might not be in Short of Water Prof. Wu Jisong Chairman of Beijing Association of Recycle Economy development Senior Advisor of Beijing Olympic Game.
1 Alberto Montanari University of Bologna Basic Principles of Water Resources Management.
INTERNATIONAL UNION FOR CONSERVATION OF NATURE Water and Green Growth for Sustainable Development Ganesh Pangare Head, Water and Wetlands Programme Head,
Assessment of Rural Sustainable Development by Microfinance Banks in Nigeria Assessment of Rural Sustainable Development by Microfinance Banks in Nigeria.
Pricing Decisions and Cost Management
Payment for Environmental Services Extracted from work by Ffemke Griffoen FAO-APO TZ.
Freight, Goods and Services Plan & Economic Impact on Central Florida.
Measuring the Economy’s Performance
Case Study Southeastern Turkey Water, Food and Energy Nexus High-Level Panel of the 6 th World Water Forum Working Group Meeting December 9, 2011 Submitted.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
BAU 2011 Europe’s building industry after the crisis – What now? Erich Gluch ifo Institute for Economic Research, Munich BAU Information Talks on 28 October.
Benefits of an As-Needed Construction Management Services Contract CMAA NATIONAL CONFERENCE October 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights.
Presenter: Frederick Yaw Logah (RS) CSIR-Water Research Institute, Accra-Ghana 15th July, 2014.
Healthy Ecosystem A healthy ecosystem is composed of:
Pricing Decisions and Cost Management
The Caserones Project October 2014 Mr. Héctor Sepúlveda O.
Roundtable for ASEAN Chief Justices on Environment
Will it be business as usual for dam building? The case of the San Roque Dam Will it be business as usual for dam building? The case of the San Roque Dam.
The Sustainable Energy International Youth Competition.
Coal Jason Zhong Ron Huang. Introduction Coal is a nonrenewable energy source. It’s a combustible black or brownish-black rock composed mostly of carbon.
By: Nicole Neilson Fresh Water Contamination. Water In British Columbia  Without a steady supply of fresh and clean water, all life would not exist 
MINI PROJECT Mission 2017 September 30, 2013 The Grand Ethiopian Renaissance Dam ( formally known as Millenium Dam and Hidase Dam)
Ghana’s Initial National Communication William K. Agyemang-Bonsu EPA.
RATIONALE AND MINING IN THE PHILIPPINES. RATIONALE The mining industry has a significant role in the Philippine economy. Economic expansion, is due to.
Population control. BiodiversitySustainable Carrying capacity.
Do Now: We know that groundwater and river basins alone do not contain enough water to meet our present needs. Are there any ways that we can harvest the.
From the 16th century, the power of falling water was utilized in Europe. In the early 18th century, the importance of water power replaced by the use.
Aquatic Biodiversity.
NO TIME TO WASTE STATES IN THE MISSISSIPPI RIVER’S PATH TO ITS DELTA REGION HAVE ABOUT 2 WEEKS TO AVERT FLOOD AND HEALTH CARE DISASTERS Walter Hays, Global.
Three Gorges Dam The World’s Largest Hydro-Power Project Dam From Space.
Three Gorges Dam The Worlds Largest Hydro-Electric Plant.
Human Impact on Ecosystems
Hydroelectric power Group 3. Leader - Jerald Kiew 12 Members Chu Yuan 3 Leom Sheng Teng 13 Gregory Loh 15 Wong Choon Pin 24 The Team.
Chapter 7.3 (cont.) surface water Glen Canyon Dam was completed in 1963 designed to generate hydropower and create a reservoir to supply water to Arizona,
Connect With Concrete Cement Outlook: Ed Sullivan, Chief Economist PCA Electric Power Conference.
Grace Masterjohn Sean Klapperich Autumn Kelley Amanda Lance.
Ecological footprint: the impact of a person, city, or country on the ecology of a local area or the whole planet. It is a measure of how much land and.
Alqueva Dam The Alqueva Dam is in Alentejo on Guadiana river which is shared with Spain. The direct influence of this Enterprise includes 19 councils,
Surface Water Supplies Joe Zulovich Extension Agricultural Engineer Commercial Agriculture Program.
Key Themes in Physical Geography July 6 th, 2009.
K = K = K = 100.
Earth Science Chapter 5 Earthquakes.
Lesson 1 Identifying Environmental and Economic Impacts from Soil Erosion.
Yangtze River North and South By: Madison Bullock, Christina Mahoney, Irena Vasilioglo, and Taylor Williams.
Journal #5 What is a flood? Why are floods harmful? What can humans do to prevent floods?
The Aral Sea was once the world's fourth-largest salt water lake. It has been steadily shrinking since the 1960s, after the rivers that fed it were diverted.
San Francisco Earthquake & Hurricane Katrina
Extended Diploma Mechanical and Electrical Services Construction Dams and Reservoirs.
The Big Melt: Antarctica's Retreating Ice May Re-Shape Earth
Unit 5 Lesson 3 Human Impact on Water
Water Resources Chapter 9
Objective - To compare numbers.
DO NOW Pick up notes and Review #31 Turn in Review #30.
Three Gorges Dam.
Lecturer: Dr. Frederick Owusu-Nimo
The good, the bad, and the ugly.
Presentation transcript:

The Philex disaster The foreseen long-term damage is irreversible,

The Philex disaster is the biggest in Philippine mining history, dumping a staggering 21 million metric tons of toxic tailings on the watershed system along the Balog-Agno Rivers all the way to San Roque Dam, which supplies critical power and irrigation to Central Luzon. The foreseen long-term damage is irreversible, affecting millions of lives, and vast areas of the Central Luzon ecosystem for many generations to come.

Philex claims its mining operations give livelihood to thousands of Filipinos and contribute to Philippine economic growth. In 48 years of operations, Philex earned $2.7 billion or Php 120 million. But the damage it has caused and will cause is estimated to be ten fold of its earnings. It has set an example that mining is not sustainable and yields benefit to a few rich and harm to many Filipinos.

Philex Tailings Dam No. 3 Life span 20 years ( ) capacity – 142 mmt

Philex Tailings Dam No. 3 Life span 20 years ( ) 2007 – 9.07 mmt capacity – 142 mmt

Philex Tailings Dam No. 3 Life span 20 years ( ) 2007 – 9.07 mmt capacity – 142 mmt 2009 – mmt

Philex Tailings Dam No. 3 Life span 20 years ( ) 2007 – 9.07 mmt capacity – 142 mmt 2009 – mmt 2009 – mmt unused

Philex Tailings Dam No. 3 Life span 20 years ( ) 2007 – 9.07 mmt capacity – 142 mmt 2009 – mmt average mmt / year 2009 – mmt unused

Philex Tailings Dam No. 3 Life span 20 years ( ) 2007 – 9.07 mmt capacity – 142 mmt 2009 – mmt average mmt / year 2009 – mmt unused walls raised 5 m (continuously?)

According to Philex records, the dam embankment of tailing pond 3 is continuously being built-up by Philex Mines to maintain a freeboard of 5 meters at the mine dike. Dr. Arturo Boquiren Dossier on Philex Mines May 2009

By how much was the wall raised finally? Did they just keep raising the walls slowly as the contents go up? Even a non-engineer knows the implication of raising the walls of a dam as contents accumulate. It means it will carry greater volume of tailings beyond the originally designed capacity.

Philex Tailings Dam No. 3 Life span 20 years ( ) 2007 – 9.07 mmt capacity – 142 mmt 2009 – mmt average mmt / year 2009 – mmt unused walls raised 5 m (continuously?)

Philex Tailings Dam No. 3 Life span 20 years ( ) 2007 – 9.07 mmt capacity – 142 mmt 2009 – mmt average mmt / year walls raised 5 m (continuously?) predicted volume on august 2012 collapse – mmt

Philex Tailings Dam No. 3 Life span 20 years ( ) 2007 – 9.07 mmt capacity – 142 mmt 2009 – mmt average mmt / year walls raised 5 m (continuously?) predicted volume on august 2012 collapse – mmt Over-capacity 103 mmt

Philex Tailings Dam No. 3 Life span 20 years ( ) 2007 – 9.07 mmt capacity – 142 mmt 2009 – mmt average mmt / year walls raised 5 m (continuously?) predicted volume on august 2012 collapse – mmt underground outflow above ground outflow collapse of outflow pipe penstock Over-capacity 103 mmt

Philex Tailings Dam No. 3 Life span 20 years ( ) underground outflow above ground outflow void after collapse

Philex Tailings Dam No. 3 Life span 20 years ( ) underground outflow above ground outflow void after collapse two 40-meter cement plugs

Philex Tailings Dam No. 3 Life span 20 years ( ) underground outflow above ground outflow void after collapse secondary dike primary dike

Philex Tailings Dam No. 3 Life span 20 years ( ) underground outflow above ground outflow void after collapse now full of water secondary dike primary dike area scoured by water – 15% Source - MGB

If EMB approved the raising of the wall, is it not just as culpable? Philex points an accusing finger on government for approving the raising of the wall. Was there collusion among engineers of Philex and EMB with or without the knowledge of their managements?