Bad Runs Alberto Oliva, July 2012.

Slides:



Advertisements
Similar presentations
AMS operations on March 5-10 Mike Capell. TRD Strap-on Gas Bottle removal and TRD pressure monitoring Spada JMDC new program and files (power steps) Cai,
Advertisements

Far Detector Data Quality Andy Blake Cambridge University.
A.Kounine 13 Jan 2007Flight Software Status1 JSC 13 January 2007 Andrei Kounine / MIT.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
Muon commissioning status and plans G.P. C. De Plano.
AMB HW LOW LEVEL SIMULATION VS HW OUTPUT G. Volpi, INFN Pisa.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
TRD straws status report from 14/03/ AMS-02 acceptance for lepton flux N. Nikonov.
CBM ECAL simulation status Prokudin Mikhail ITEP.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
POCC activities AMS02 meeting at KSC October 11 th 2010.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
L1Calo EM Efficiency Maps Hardeep Bansil University of Birmingham L1Calo Weekly Meeting 07/03/2011.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
Christoph Blume Offline Week, July, 2008
CLAS12 DAQ & Trigger Status
Jean-Sebastien Graulich, Geneva
Gas system Commissioning procedures and status
Experience between AMORE/Offline and sub-systems
Online Software “To Do” List
AMS Summary 16:00 on Mon 26 Mar 2018 (GMT 085) To
16:00 on Tue 3 Apr 2018 (GMT 093) To 16:00 on Wed 4 Apr 2018 (GMT 094)
16:00 on Mon 2 Apr 2018 (GMT 092) To 16:00 on Thu 3 Apr 2018 (GMT 093)
AMS Summary 16:00 on Mon 29 Oct 2018 (GMT 302) To
AMS Summary 16:00 on Mon 22 Oct 2018 (GMT 295) To
AMS Summary 16:00 on Fri 16 Nov 2018 (GMT 320) To
Preparation of the CLAS12 First Experiment Status and Time-Line
AMS Summary 16:00 on Tue 20 Nov 2018 (GMT 324) To
AMS Summary 16:00 on Fri 05 Oct 2018 (GMT 278) To

16:00 on Fri 2 Nov 2018 (GMT 306) To 16:00 on Mon 5 Nov 2018 (GMT 309)
16:00 on Tue 6 Nov 2018 (GMT 310) To 16:00 on Wed 7 Nov 2018 (GMT 311)
AMS Summary 16:00 on Thu 22 Nov 2018 (GMT 326) To
16:00 on Wed 5 Dec 2018 (GMT 339) To 16:00 on Thu 6 Dec 2018 (GMT 340)
AMS Summary 16:00 on Mon 12 Nov 2018 (GMT 316) To
AMS Summary 16:00 on Mon 18 Feb 2019 (GMT 049) To
AMS Summary 16:00 on Fri 15 Feb 2019 (GMT 046) To
AMS Summary 16:00 on Tue 19 Feb 2019 (GMT 050) To
AMS Summary 16:00 on Thu 14 Feb 2019 (GMT 045) To
Search for coincidences and study of cosmic rays spectrum
AMS Summary 16:00 on Tue 26 Feb 2019 (GMT 057) To
AMS Summary 16:00 on Mon 25 Feb 2019 (GMT 056) To
AMS Summary 16:00 on Fri 22 Feb 2019 (GMT 053) To

AMS Summary 16:00 on Fri 12 Apr 2019 (GMT 102) To
AMS Summary 16:00 on Mon 15 Apr 2019 (GMT 105) To
AMS Summary 16:00 on Thu 11 Apr 2019 (GMT 101) To
AMS Summary 16:00 on Thu 18 Apr 2019 (GMT 108) To
Pierluigi Paolucci & Giovanni Polese
AMS Summary 16:00 on Tue 30 Apr 2019 (GMT 120) To
16:00 on Fri 3 May 2019 (GMT 123) To 16:00 on Mon 6 May 2019 (GMT 126)
AMS Summary 16:00 on Fri 10 May 2019 (GMT 130) To
AMS Summary 16:00 on Mon 13 May 2019 (GMT 133) To
AMS Summary 16:00 on Tue 14 May 2019 (GMT 134) To
AMS Summary 16:00 on Wed 22 May 2019 (GMT 142) To
16:00 on Tue 2 Jul 2019 (GMT 183) To 16:00 on Mon 8 Jul 2019 (GMT 189)
AMS Summary 16:00 on Wed 10 Jul 2019 (GMT 191) To
AMS Summary 16:00 on Tue 9 Jul 2019 (GMT 190) To
AMS Summary 16:00 on Thu 11 Jul 2019 (GMT 192) To
16:00 on Mon 8 Jul 2019 (GMT 189) To 16:00 on Tue 9 Jul 2019 (GMT 190)
Status of DT Local Trigger Commissioning
Presentation transcript:

Bad Runs Alberto Oliva, July 2012

Sample Sample: B584/pass3 Runs: 22804 (26220 files) Time span: 20/05/2011 (1305853512) – 17/05/2012 (1337244535) ~ 1 year Processed runs: 22802 Errors in processing: 2 (1327065737, 1335142636) B584 has new tools for the study of bad runs provided with the new production: A. Kounine (xDR error handling) M. Duranti (DSP errors) V. Choutko (DaqEvent storing) This analysis has been performed on the SEU cluster. Full analysis of all the runs in less than 1 day.

Day-by-day Acquisition Time 24h Power reconfig (14/Nov/2011) JMDC Hang (25/Nov/2011) RDR LV Alarm (24/Dec/2011) TPD Problem (2/Dec/2011) Nothing in e-log, maybe missing runs (?) (Aug/2011) ECAL Desync (15-22/Dec/2011) Commissioning ~ 2 weeks (TOF HV scans, TTCS test, Trigger tests, …) Ended with trigger finalization, 5/Jun/2011 (1307301440) https://amsvobox04.cern.ch/elog/LEAD/5143 346 working days (after comm.) for 334 acquisition days “Operations Efficiency” ~ 96.3%

Bad Runs Lists DAQ: a list of known bad runs from the general point of view provided by M. Paniccia > Pulser Left ON: 17 runs, ~ 5 hours ECAL: a detailed list came from M. Paniccia > ECAL crate E0 event mismatch (Dec 2011): 491 runs, ~ 7 days > EDR-1-0-A wrong configuration file (Jul 2011): 14 runs, ~ 4 hours > EIB RP3 (EDR-1-3 connector 0) power cycle (Sep 2011): 1 run, ~ 3 min > EIB RP3 (EDR-1-3 connector 0) wrong trigger settings (Sep 2011): 23 runs, ~ 8 h > Ecal Trigger Test (Nov 2011): 1 run, ~ 1 hours Tracker: Jose provide a list of bad runs > Bad Calibration (done in SAA or polar regions): 135 runs, ~ 1.8 days TRD: a list will be provided soon TOF: from a list of TOF problems compiled by V. Bindi no runs decide to be tagged as bad. RICH: an estimator of the run quality will be provided. For the moment no bad runs from RICH.

Run Tag Cutting on RunTag will cut away all the refill periods ECAL Tags TRD Refills Cutting on RunTag will cut away all the refill periods that rougthly account for 1179 runs, ~ 17 days. No cut right now: we will use TRD list. TOF scans JMDC Reboot (defult RunTag)

Event Synchronization Synchronization error occurs whenever part of the event comes from different triggers. Most (not all) of the synchronization problem are detected during event building. > A. Kounine provided code to check for this problem in the offline. No ECAL Desync and No Commissioning ECAL Desync (15-22/Dec/2011) only few desync during run (?) Runs with at least one desync error: 635 runs (~ 11 days) Big fraction comes from 15-22 Dec 2011 ECAL problem (cuts superposition). Another big fraction comes from runs with a very low number of desync errors.

Program Memory Error Corruption of the program memory of DSP. From time to time (rarely) causes a crazy behavior of the board. > M. Duranti developed tools needed to check the problem carefully. Node is OK Node is KO Node is OK DSP test on node  Status is OK DSP test on node  Status is KO Node Boot Runs with at least one DSP error: 4030 runs, ~ 60 days  Not used. Left as possibility for the accurate data analysis of efficiency.

Fraction of Missing Events Comparison between the last event number and events on disk. > Error on frame transmission (missing, incomplete, corrupted). > Error on JMDC event transmission (corrupted format, event CRC error). > Offline production problem. 16587 runs have 0 difference! Runs with a large number of missing events 0.1% 1% 10% 100% Why this shape? Fraction of missing events > 0.1%: 421 runs (~ 6 days) We have some runs with number of events on disk > events  reprocess duplication (86 runs).

Fraction of Events with Error The event collected and stored on disk could be affected by “hardware” problem (ROOM error, desync error, …). Using A. Kounine code we can check errors on all the DAQ nodes (not only upper part). Typical error rate is of the order of 0.1% Runs with a large number of events with errors 0.1% 1% 10% 100% Fraction of events with Errors > 1%: 661 runs (~ 10 days)

Fraction of Events with no Particles Events with no error may not have an associated reconstructed particle. > Trigger on an interaction event (accounted in acceptance evaluation) > Bad Trigger configuration (not accounted). All coming from 7/Aug/2011 (Pulser On) 1% 10% 100% Fraction of events with No Particle < 1%: 22 runs (8 hours)

AMS Zenith Angle ISS moves like an “acrobat”, then AMS is not always pointing to the “Zenith”. The code for the AMS Z axis angle with respect to Zenith comes from C. Consolandi. movements during run high angle AMS “not vertical”: 74 runs (~ 1 day)

Conclusion Cut Standalone In Sequence Bad DAQ 17 (~ 0.2 d) Bad ECAL Bad Tracker 135 (~ 2 d) 128 (~ 2 d) Desync 635 (~ 11 d) 394 (~ 7 d) Missing Events 421 (~ 6 d) 377 (~ 5 d) Events with DAQ Error 661 (~ 10 d) 96 (~ 1 d) Events with no Particle 22 (~ 0.2 d) 1 (~ 0.002 d) « AMS Vertical » 74 (~ 1 d) 65 (~ 1 d) Total 1608 (~ 25 d) over 21868 (~ 334 d) ~ 7.5% Lists with Vitaly’s format created. TRD bad run list is missing. Probably some runs should be reprocessed. This acquisition time should be decreased by the SAA exposition (around 15%).