Houston Region Import Capacity Project Planning for Reliable Power.

Slides:



Advertisements
Similar presentations
Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007.
Advertisements

FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Presentation to State Water Resources Control Board November 14, 2012 By Dave Modisette Executive Director California Municipal Utilities Association.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
Regional Planning Group Project
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
Texas Lignite Industry. Texas Lignite  Because >95% of lignite mining operations in Texas are in support of electric generation…..whatever impacts the.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Houston Area Dynamic Reactive Project March 11,
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
ATC Major Projects Update Flora Flygt, Director of System Planning Franc Fennessy, Manager of Local Relations Wisconsin Industrial Energy Group August.
The Need for Electric Transmission Improvements in Dane County.
NRG Comments/Concerns with HIP Assumptions January 21, 2014 RPG Meeting NRG Comments/Concerns with HIP Assumptions - January 21, 2014.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
ERCOT SCENARIO DEVELOPMENT STAKEHOLDER WORKSHOP CNP Discussion Points for Long-Term Scenarios ( ) January 23, 2014.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
1 Entergy Transmission Planning Summit New Orleans, LA July 10, 2003 Generation and Transmission Development in the Southeastern United States.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Houston Import Study Update
Director, Transmission Services
Warren Lasher Manager, Long-Term Planning and Policy
I-5 Corridor Reinforcement Project
Environmental Assessment PUC Application Process
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Presentation transcript:

Houston Region Import Capacity Project Planning for Reliable Power

The Houston region is experiencing significant economic growth in the residential and industrial sectors. Economic and population growth could greatly strain the Houston regions existing electric infrastructure, including the power grid. To meet a growing demand for electricity in the coming years, new transmission lines must be built now to access power located in other parts of the ERCOT region. Failure to do so may limit the Houston regions ability to grow and prosper. Additional benefits for the electric transmission grid in the ERCOT region will also be achieved. 2 Houston Region Import Capacity Project Overview We must act now to secure reliable power for the Houston Region.

The Electric Reliability Council of Texas (ERCOT) has acknowledged a need for an additional import path using a high-voltage transmission line into the Houston area. o Three of the highest congested areas relate to importing power into the Houston area from the north ERCOT Constraints and Needs report o Houston region will need at least one additional import path in the next ten years – 2012 ERCOT Long- Term Study o Retirement of legacy gas-fired power plants would increase need for expanded import capacity within the Dallas/Fort Worth and Houston regions – 2012 ERCOT Long-Term Study CenterPoint Energy has performed a study to consider the import needs for the Houston region based on planning criteria for ERCOT and the Company. The study indicates that there is a need for additional import capacity starting in 2018 to ensure reliable power. CenterPoint Energy considered 25 alternatives to address the import needs, and it ultimately proposed three alternative projects for consideration. Public comments are due on August 16, 2013, to the ERCOT Regional Planning Group, who will consider the study. ERCOT will either select one of CenterPoint Energys three proposed projects, select one of the other 22 options studied, or ERCOT will develop and recommend an alternative option that it develops. 3 Houston Region Import Capacity Project Summary

A thriving economy. The Houston regions business-friendly environment has sustained and will continue to sustain load growth. Houston and surrounding areas have been growing at a steady pace equaling or exceeding the national average electrical usage growth rate. o Additional load adds stress to the import constraint o The only industrial load increases modeled are the new load for which firm commitments had been made at the time the studies were prepared. Sufficient generation has not been added to keep up with growth. As a result, we have to depend on importing significant amounts of power from other ERCOT regions to maintain reliable power. o Consistent with ERCOT Planning Guides, only new generating units that have made firm commitments were modeled in the study. o Over the past several years, announcements to build new generating units in the Houston region have been made, but very few have followed through with firm commitments and actual construction. o The study assumes all mothball units are in service and there are no retirements of existing generating units over next 5 years. The capacity to import power into the Houston region is reaching maximum threshold. 4 Key Drivers of the Houston Region Import Constraint

5 Grant Substation * Twin Oak Substation is owned by Oncor Electric Delivery Company. ** Ragan Creek Substation is a proposed CenterPoint Energy 345 kV substation to be constructed as part of the project. Option Import Increase (MW) New 345kV Structure Miles Cost ($MM)MW/$MM Option 1: Twin Oak-Zenith* Option 2: Ragan Creek-Zenith** Option 3: Limestone-Ragan Creek-Zenith** Houston Region Import Capacity Project Proposed Interconnection Alternatives Study Option Import Increase (MW 1 ) New 345 kV Structure Miles Cost ($MM 2 )MW/$MM 3 Option 15: Twin Oak-Zenith* Option 24: Ragan Creek-Zenith** Option 25: Limestone-Ragan Creek-Zenith** Megawatts 2 Millions 3 Megawatts per Million Dollars

6 Houston Region Import Capacity ProjectDurationStartFinish Submit Study to ERCOT July 2013 ERCOT Review of Project 6 MonthsJuly 2013January 2014 Routing Study, Environmental Assessment, and Public Meetings 9 MonthsJanuary 2014September 2014 File CCN/PUCT Review 6 monthsOctober 2014March 2015 PUCT Approval March 2015 ROW Activities 12 monthsApril 2015April 2016 Transmission Construction 15 monthsMay 2016July 2017 Houston Region Import Capacity Project Proposed Timeline ERCOT Electric Reliability Council of Texas CCN Certificate of Convenience and Necessity PUCT Public Utility Commission of Texas ROW Right-of-Way Acronyms

7 Grant Substation CenterPoint Energy submitted the study to ERCOT for review and approval in July of 2013, recommending three alternatives for increasing Houston import capacity to achieve reliable power for future growth. ERCOT will perform an independent analysis to determine one final recommended project. To meet ERCOT Planning Criteria and the future growth needs of the Houston region, the project needs to be completed before the start of the 2018 summer season. Houston Region Import Capacity Project Conclusion