Nataliya Zubko, Jyri Näränen, Markku Poutanen

Slides:



Advertisements
Similar presentations
RED ATLÁNTICA DE ESTACIONES GEODINÁMICAS Y ESPACIALES Jesús Gómez-González Francisco Colomer Instituto Geográfico Nacional Spain.
Advertisements

7th US VLBI Technical Meeting at Haystack Observatory, November 3-4, 2009 Arecibo VLBI Report Arecibo VLBI Team: V. Arun, R. Ganesan, T. Ghosh, C. Salter.
Chubaka Producciones Presenta :.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
E-VLBI Development at Haystack Observatory 5 th Annual e-VLBI Workshop Haystack Observatory 20 September 2006 Alan R. Whitney Kevin Dudevoir Chester Ruszczyk.
VLBI in Africa Michael Bietenholz Hartebeesthoek Radio Observatory.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
1 1 January 27, 2009 VLBI2010 Proof-of-Concept Signal Chain Arthur Niell MIT Haystack Observatory.
The Miyun 50m radio telescope and possible upgrading project Jin Chengjin & Zhang Juyong Miyun Radio Astronomy Group, NAOC 2003, 11, 03.
ASTRO-G project VSOP-2 – VLBI Space Observatory Programme times higher sensitivity. 10 times higher frequency observation 10 times higher resolution.
1 Sardinia Radio Telescope, the VLBA and the HSA Luigina Feretti INAF Istituto di Radioastronomia Bologna, Italy.
EVLBI at Wettzell R. Dassing G. Kronschnabl. Wettzell is a Fundamentalstation for Geodesy (i.e. all relevant geodetic measurement systems are collocated.
The ALMA Phasing Project (APP) APP is an ongoing ALMA Development Project (approved in 2012) to provide the hardware and software necessary to coherently.
The Future of the VLBA 27 & 28 January 2011 Arecibo, the VLBA and the HSA Chris Salter Arecibo Observatory (National Astronomy & Ionosphere Center) ‏
Giga-bit Geodesy e-VLBI at 22GHz Hiroshi Takaba Gifu University, Japan.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
VLBI Oct Development Status of Broadband VLBI System (Gala-V) -(II) M.Sekido (1), K.Takefuji (1), H.Ujihara (1), M.Tsutsumi.
Suijian Xue ( 薛随建 ) National Astronomical Observatories, Chinese Academy of Sciences JEJU, Korea Regional Report Astronomical Activities Update.
Canada’s Natural Resources – Now and for the Future Broadband Delay Tutorial Bill Petrachenko, NRCan, FRFF workshop, Wettzell, Germany, March 18, 2009.
20 th Meeting of the European VLBI Group for Geodesy and Astrometry (EVGA), Bonn, Germany Wednesday, 28 th March 2011 EVGA – Looking back at the early.
03/000 VLBI network design Australian Government Geoscience Australia NGRS Workshop, 1-2 February, Canberra.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
Achieving a Quantum Leap in Observation Density Bill Petrachenko, NRCan.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
RFI Protection Activities in IAA RAS
Institute for Space-Earth Environmental Research (ISEE),
RFI Protection Activities in IAA RAS
Olathe South ACT Timeline
ALMA Cycle 5 Hiroshi Nagai (NAOJ).
SPACE GEODESY ACTIVITIES AT INSTITUTO GEOGRÁFICO NACIONAL (IGN), SPAIN
The Institute of Applied Astronomy of the Russian Academy of Sciences Operating experience of Data Transmission and Buffer System. Research of.
Multifunctional Digital Backend (MDBE) for "Quasar" VLBI-network
Geodetic VLBI activities in China
The Development of Broadband VLBI Technologies in SHAO
Haystack Geodesy Program and Technical Development
COSMO Priority Project ”Quantitative Precipitation Forecasts”
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
I.E.S. Universidad Laboral
2018/2019 School Calendar July August September October November
The 40m YEBES RT and the HSA
The Progress of Seshan VGOS Station Construction
Irregularities in DoRIS
McDonald’s Kalender 2009.
SA1: third year overview
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Problem Gambling Clicks to Opgr.org
VLBI Estimates of Vertical Crustal Motion in Europe
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
McDonald’s calendar 2007.
Strategic Planning Timeline Overview
Teacher name August phone: Enter text here.
Correlator Growth Path
Irregularities in DoRIS
Circle Chart Template Process Name.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
DBBC Stutus Report November 2007
McDonald’s calendar 2007.
Sep Oct Nov Dec Jan Feb Mar Apr May
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Nataliya Zubko, Jyri Näränen, Markku Poutanen Progress update of the VGOS radio telescope at the Metsähovi Geodetic Research Station Guifré Molera Calvés Nataliya Zubko, Jyri Näränen, Markku Poutanen

VLBI site in Finland Metsähovi Geodetic Research Station: VLBI SLR GNSS DORIS Gravimeters

VLBI Global Observing System VGOS technical and observational concept was developed by VLBI2010 Committee 1‐mm  position  accuracy (on 24‐hour observation) VGOS goals Continuous  measures  of  station position  and  EOP VGOS goals: 1‐mm  position  accuracy (based  on  a  24‐hour  observation) Turnaround  time  to  initial  products <  24‐hours

VGOS design aspects 19.5.2019 Current VGOS Antenna size 5-100 m dish Slew speed ~20-200 deg/min >=720 deg/min Sensitivity 200-15000 SEFD <=2500 SEFD Frequency range S/X band 2-14 GHz Recording rate 128, 256 Mbps 8-16 Gbps Data transfer Usually ships disks, some e-transfer e-transfer 19.5.2019 4

VGOS network 5 Wettzell Yebes Onsala Ishioka Kokee Ny-Alesund Zelenchukskaya Wettzell Yebes Onsala Ishioka Kokee Ny-Alesund 5

Project overview 2009-2015- Search of funding November 2015 – Proof of funding for the VGOS project by Finnish Ministry of Forestry and Agriculture January 2016 - Start of the project March-November 2016 –tendering of radio telescope April 2017-February 2018- manufacturing of the radio telescope

Project overview May 2017- December 2017 - Site preparation

Telescope shipment Telescope shipped from China on 25th of April Arrives to Metsähovi on 25th of June 2018

Telescope assembly

September 2018 March 2016

Signal chain Broadband receiver (2-14 GHz) two polarisations and QRFH feed being built by IGN (Spain, Yebes) 2 polarisations High and Low RF bands to Optics to link RT to CR. Backend – DBBC3 full VGOS capable of eight 4 GHz Recording system – Flexbuff of 480 TB GPS receiver and prisms for local ties Receiver 04.10 Control Room

Distribution of Time & Frequency No Hydrogen maser! km distances 1 pps 5 MHz Finnish Metrology Institute VTT/MIKES White Rabbit Switch CERN + www.sevensols.com

Distribution of Time & Frequency Extensive tests have been carried out since 2017. Comparing WRS signal vs Aalto’s Metsähovi H-maser. WRS can provide a good enough 1 pps and 5 MHz signals to fulfill VGOS requirements.

Future timeline Sep - Oct 2018 – Telescope commissioning Dec – Site acceptance test Feb - Apr 2019 – Installation of the signal chain components 2019 – Testing of the complete telescope system 2020 – Start regular observations