FIELD INSPECTION AND REPAIR OF TRANSMISSION PIPELINE COATINGS

Slides:



Advertisements
Similar presentations
Soldering & Circuit Fabrication
Advertisements

1.Why is the moist adiabatic lapse rate lower than the dry- adiabatic lapse rate? Heat is released during condensation. 2.When temperatures are below freezing,
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Unit B: Safety in Agricultural Mechanics
AUTOMOTIVE COOLING SYSTEMS
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
5/18/2014Righter Group, Inc.1 Tnemec Stranlock Revêtements Renforcies Présente.
Wilko Paint, Inc. Wilko Paint is the premier supplier of industrial finishes and coatings.   Our staff of industrial coatings specialists will provide.
1 New build-up technique with copper bump AGP Process.
Single Coat 100% Solids Tank Linings SPECIALTY POLYMER COATINGS, INC. Single Coat 100% Solids Tank Linings.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
HYDROCLICK SYSTEM.
Selecting the Proper Coating/Lining System
Adhesive and Their Properties
1 Challenge the future Subtitless On Lightweight Design of Submarine Pressure Hulls.
Adhesives for LSE substrates. Joining Methods Non structural (
PALESTINE UNIVERSITY BUILDING MATERIAL chapter No.#5 Steel.
Presented By – The Grapple Hook Group Distributors of Iron Ox Products
Regulations (Standards - 29 CFR) Flammable and Combustible liquids
Gilbert Noussitou NUTRITION L3 COOK & CHILL and COOK & FREEZE SYSTEMS.
1. 2 Earthquake effects on health care facilities 2.
PP Test Review Sections 6-1 to 6-6
December 27, 2012 The I.A. University of Ahvaz Mahdi Bavi Hossein Kharazmipour.
PILC Replacement Page 1 April 2003 ICC PILC Replacement: Getting the Lead Out Spring ICC Cincinnati, OH April 30, 2003 ?
All Weather Masonry Construction. 2 International Building Code 2006 Chapter 21: Masonry Section 2104 – Construction.
Presented to: By: Date: Federal Aviation Administration Fuel Cell Flammability Fuel Cartridge Assessment Intl Aircraft Systems Fire Wkg Grp Harry Webster.
“A World Leader In Plastics Technology”
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
1 Floating roof tank repair Liquid escapes from two leaky places of a floating roof tank. The tank is filled with high flammable kerosine, therefore the.
MarineMend Repair Kit Procedure
Subtraction: Adding UP
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Developing an In-flight Fire Condition.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
SHOTCRETING K.V.SUBBA RAO.
Above Ground Storage Tanks &
HVAC523 Soldering.
“One Single ,Uniform coating for the entire pipeline using
Silver Brazed Stainless Steel Cable Presented by: Erik Clark Tim Flynn Tony Foster Peter Jones Brian Martel Ried Snyder.
Example of a successful lining Description: Tuff Stuff is sprayed as a protective lining onto a boat hull. The lining with TS provides a high level of.
Casing Spacers & End Seals
Coatings – Directional Boring Tim Jenkins. Coatings – Directional Boring Design Considerations (data collection) Design Considerations (data collection)
Polyurethane, Polyurea and Hybrid Lining Technology
Asset Management Preservation
Presented by: Peter Emmons,
Selecting Coatings Under Insulation Presented by: Brent W. Griffin, SME On behalf of SSPC.
TRENTON Casing Filler Presentation
Application of Thermal Spray
Standards, Training, and Certification in the Wastewater Industry Presented by: Bob Murphy, Sherwin Williams.
Advances in Polyurethane and Polyurea Technology Presented by: Jayson L. Helsel, P.E. KTA-Tator, Inc.
Put an end to corrosion & water ingress by self-healing fully amorphous visco- elastic technological systems Solution for Risers.
WALTER SCARBOROUGH CSI CCS CCCA SCIP AIA D+D Specifiers Series Sponsored by Exterior Steel and High-Performance Coatings.
Thermal Spray Coating Application
THE SCIENCE OF SOLVENT WELDING
Corrosion Basics Chapter 6 – NACE Book Protective Coatings
Coating Defects and Failures
Materials Selection and Coatings
CHAPTER 2 Pipeline Coatings.
Inspection of Thermal Spray Coatings
TRENTON Casing Filler Presentation
2019 AUCSC Fundamentals Session Jeff Didas – Matcor - Tucson, AZ
Heat-Shrinkable Sleeve Technology
Presentation transcript:

FIELD INSPECTION AND REPAIR OF TRANSMISSION PIPELINE COATINGS PAINT SQUARE WEBINAR FIELD INSPECTION AND REPAIR OF TRANSMISSION PIPELINE COATINGS E. BUD SENKOWSKI, P.E. SENIOR CONSULTANT KTA-TATOR, INC.

WEBINAR CONTENT Purpose of pipeline coatings Performance expectations of pipeline coatings Federal/state requirements for corrosion protection Purpose of field inspection Field inspection techniques Field installation and repair of pipeline coatings Protection of girth welds Repair of coating damage prior to burial Field rehabilitation of pipeline coating systems and joints

WHY DO WE NEED PIPELINE COATINGS? Corrosion is the greatest danger to buried steel pipelines. Uncontrolled corrosion of the pipe wall leads to leaks, service interruptions, and even explosions. Pipeline owners/operators place their highest priorities on coating systems to prevent corrosion. Pipeline coatings are applied to both pipe runs and girth welds. A STACK OF COATED PIPE

PERFORMANCE EXPECTATIONS OF PIPELINE COATINGS Long-term protection of the pipeline steel surfaces from corrosion. Compatibility with cathodic protection. INSTALLING A COATED PIPELINE IN THE TRENCH

FEDERAL REQUIREMENTS FOR THE CORROSION PROTECTION OF BURIED PIPELINES All interstate pipelines shall be installed with an exterior coating system. Additionally, all interstate coated pipelines shall be protected by a cathodic protection system providing: A minimum pipe-to-soil potential of - 850 mV Or, a minimum polarization shift of 100 mV. Many states have similar requirements for intrastate pipelines.

FIELD COATING INSPECTION PURPOSES OF FIELD COATING INSPECTION Verify that the coating application meets the specification requirements for: Surface cleanliness Surface profile Allowable ambient conditions Dry film thickness (DFT) Absence of coating holidays (pinholes) Adhesion to steel substrate Degree of cure

MATERIALS USED IN PIPELINE COATING SYSTEMS

JOINT COATING AND REPAIR MATERIALS AVAILABLE FOR FIELD USE

WHY DO PIPELINES HAVE JOINTS? Pipelines have joints because they are fabricated from 40’ and 80’ coated pipe sections. High pressure pipelines require a girth weld at each field joint. SETTING A PIPE SECTION IN THE TRENCH BEFORE WELDING

WHY MUST JOINTS BE COATED? Each girth weld must be coated because the welds are made on areas that are bare steel. The bare area at the end of each pipe section is called the “cut back” area. It can be up to 12” wide. All girth welds must be coated before the line is buried. WELDING A PIPE JOINT. NOTE THE CUT-BACK AREA BETWEEN THE WELD AND THE YELLOW COATING.

COATING COMPATIBITY ISSUES WITH JOINT AND REPAIR MATERIALS Coatings selected for a girth applications must be compatible with the coating applied to the main pipeline. In addition to chemical compatibility, the girth weld coating must form a tight seal to prevent water infiltration. If a generically similar coating is not available, there are other joint and repair materials that will perform. LINE-TRAVELLING UNIT FOR APPLYING LIQUID EPOXY TO GIRTH WELDS ON AN FBE COATED PIPELINE

NEW CONSTRUCTION OR MAINTENANCE WORK? New construction utilizes automatic line travelling equipment to blast and coat and cure girth welds. Replacement and recoating of single sections and their girth welds requires materials that cure under field conditions. Cold and wet conditions require special material formulations. A LIQUID EPOXY APPLICATION TO THE MAINTENANCE REPLACEMENT OF A PIPE SECTION

WHAT IS MICROCRYSTALLINE WAX? Microcrystalline wax is a solid by-product of petroleum that melts at 160-175°F. When coating girth welds, the wax is heated in a pot to 270-350°F and applied by the “granny rag” method to reach 40-60 mils. It can also be applied by brush to small areas. The wax develops excellent adhesion to cleaned steel and exhibits good flexibility. APPLYING MICROCRYSTALLINE WAX TO A GIRTH WELD USING A GRANNY RAG

WHAT ARE COLD-APPLIED TAPES? Cold–applied tapes are prefabricated materials made from a polymer backing attached to an adhesive film. Some may also use a liquid primer. Petroleum wax Polyethylene (PE) PE/PP blends

WHAT IS PETROLEUM WAX TAPE? Petroleum wax is a by-product of crude oil that is mixed with mineral fillers, plasticizers, and corrosion inhibitors. The wax is applied to a polyester mesh and used as a tape product over pipeline and girth weld surfaces. An additional wax-based filler with glass micro beads is used to smooth out irregular shapes prior to coating. The tape can be applied over tight rust. It contains no toxic materials and can be placed in service immediately after application. PETROLEUM WAX TAPE

WHAT IS POLYETHYLENE (PE) TAPE? Polyethylene (PE) tape is a cold- applied joint covering that has an elastomeric or butyl rubber- based adhesive. Tapes use a high-density version (HDPE)for better resistance to mechanical damage. HDPE tapes are compatible with most pipeline coatings in current use. HDPE TAPE WRAPPED OVER A TEE IN AN FBE COATED PIPELINE

WHAT IS A MULTI-POLYMER ALLOY (MPA) TAPE? Multi-polymer alloys (MPA) are proprietary blends of polymers like polyethylene (PE) and polypropylene (PP) They are applied cold with a pressure-sensitive adhesive. MPA tapes have temperature resistance to 250°F. HIGH TEMPERATURE TAPE APPLICATION

WHAT ARE HEAT-SHRINK PRODUCTS? Heat-shrink products are made from specially-processed PE or PP that will shrink when heated. The reverse side of the sleeve is coated with an adhesive. The adhesive layer becomes molten when heated and upon cooling completes the seal to the pipe surface. APPLYING A HEAT-SHRINK SLEEVE

WHAT KINDS OF HEAT-SHRINK PRODUCTS ARE AVAILABLE? Heat –shrink products include tube sleeves, wrap-around sleeves and tape. Shrink ratios are in the 2:1 and 3:1 with minimal change in the linear direction along the pipe. Some wrap-around sleeves have metal closure strips that hold them together during application. COMPLETED HEAT-SHRINK SLEEVE OVER A GIRTH WELD

WHERE CAN HEAT SHRINK PRODUCTS BE USED? Heat shrink products are available for pipe diameters in the range of 2” to 60”. They can be used with virtually all of the pipeline coatings in current use. Depending upon the sleeve material and adhesive they can be used on pipelines operating to 230°F. CONTINUOUS HEAT-SHRINK SLEEVES APPLIED OVER A SECTION OF DAMAGED ASPHALT PIPELINE COATING

WHAT IS LIQUID EPOXY? Epoxy is a two-part liquid coating made by mixing a resin with a hardener. After mixing and curing, a hard, tough, chemically- resistant coating is formed. Epoxy has excellent resistance to water penetration and cathodic disbondment damage. APPLYING LIQUID EPOXY TO A GIRTH WELD

HOW IS LIQUID EPOXY USED FOR JOINTS? Epoxy is made to work in many field conditions. It is applied at 10-20 mils DFT using brush, roller, or spray. Surface preparation requires a surface cleaned to an SSPC- SP10, Near-White condition. Air and surface temperature should be at least Is 50°F. Lower temperature versions are available. CURED LIQUID EPOXY COATING ON A GIRTH WELD

COATING IN COLD WEATHER Conventional epoxy formulations will not cure in cold weather. Supplemental heat must be used to heat the pipe and cure the resin. However, low temperature epoxies are available that can be applied and cured over a 4°F to 32°F temperature range. APPLYING LIQUID EPOXY IN COLD WEATHER

HOW IS FUSION-BONDED EPOXY (FBE) USED AS A JOINT COATING? FBE is used the same way that the material is applied at the mill, except that the process is done in the field. The weld area is cleaned to SSPC-SP10, Near-White Metal condition, heated by induction, and the FBE applied by electrostatic spray. Heat completes the cure. A LINE-TRAVELLING FBE SPRAY UNIT FOR GIRTH WELD COATING

HOW ARE FBE JOINTS APPLIED UNDER FIELD CONDITIONS? Girth weld completion must go on regardless of weather conditions. When FBE is applied to welds it may be necessary to erect environmentally controlled structures along the right-of-way. Welding and coating takes place within the structures. HEATED SHELTERS FOR GIRTH WELD WORK IN COLD WEATHER

WHY DO WE REPAIR SMALL COATING DEFECTS? Small coating defects can occur at any time on mill coated pipe from the point of manufacture to final burial in the trench. Electrical testing (jeeping) can also reveal holidays that require repair. Any unrepaired defect can become a point of corrosion on the coated pipe. MAGNIFIED VIEW OF IMPACT DAMAGE ON AN FBE COATING

REPAIRING PIPELINE COATINGS WITH POLYMER-BASED TAPES Defects or damage in many pipeline coatings can be repaired with cold-applied polymer-based tapes. The tapes may utilize PVC, HDPE, HDPP, or MPA polymers. The areas to be repaired can be prepared by wire brush. A primer may be necessary to optimize the adhesive bond of the tape. HAND-WRAPPING PE TAPE

REPAIRING PIPELINE COATINGS WITH HEAT-SHRINK SLEEVES A variety of coated pipelines, including FBE and composite, 3-layer HDPE And HDPP, can be repaired using heat-shrink sleeves or tape. Areas to be repaired can be cleaned by power-driven wire brush. The interior sleeve or tape surfaces will have a modified butyl rubber adhesive that will complete the adhesive bond. APPLYING HEAT-SHRINK TAPE AT A GIRTH WELD REPAIR

PRECAUTIONS WHEN USING HEAT-SHRINK PRODUCTS The applications of heat shrink sleeves and tapes must be closely monitored to ensure that both the preheating of the steel surface and heat applied to achieve the shrinking of the material is adequate to maximize the adhesive bond. If the temperatures are below levels specified by the manufacturer, an insufficient bond will form and lead to failure by water penetration. Pull-off peel tests provide a means to evaluate the adhesive bond of heat-shrink products in the field.

MAKING REPAIRS TO LIQUID-APPLIED EPOXY AND POLYURETHANE Pipelines originally coated with liquid epoxy or polyurethane coatings can be repaired by re- applying the same materials. Exposed metal should be cleaned to a near-white condition. Weather conditions at the time of repair may require the use of low temperature tolerant formulations. LIQUID EPOXY APPLICATION TO A PIPELINE AREA

MAKING REPAIRS TO FUSION-BONDED EPOXY WITH LIQUID/PASTE EPOXY Small areas of damage in an FBE coating can be repaired with a fast-curing, 100% solids, 2- component chemically-cured epoxy paste supplied in a dual- component dispenser. Once dispensed, the epoxy paste is mixed with a spatula and applied to complete the repair. Epoxy products develop a strong adhesive bond to FBE. A HAND-HELD GUN FOR DISPENSING A 2-COMPONENT EPOXY REPAIR PASTE

REPAIRS WITH PLURAL COMPONENT HIGH SOLIDS SPRAY (HSS) UNITS Field repairs can also be made by spraying plural component epoxy with a high solids spray (HSS) unit. HSS units are scaled-down, disposable spray units that use compressed air at 40-50 psi to mix and spray the contents (40-1000 mL) of a dual (resin/hardener) cartridge pack. For best results, the cartridges should be heated to approximately 120-130°F before use. HSS DISPOSABLE SPRAY UNIT

FIELD REPAIRS TO 3-LAYER COMPOSITE COATINGS Composite, 3-layer polypropylene (3LPP) and polyethylene (3LPE) coatings can be repaired using hot microcrystalline wax, cold applied tape, and heat-shrink products. HDPP heat-shrink products match the thermal and mechanical resistance of the original 3LPP composite coating. TESTING A HDPP HEAT-SHRINK SLEEVE APPLIED OVER A 3LPP COATING

JOINT COATING AND REPAIR MATERIALS AVAILABLE FOR FIELD USE

QUESTIONS? QUESTIONS?