ILC - Global Design Effort

Slides:



Advertisements
Similar presentations
Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Advertisements

TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
April 2009 AAP Review Global Design Effort 1 “Minimum Machine” is code for Design and Integration Studies in 2009 toward a Re-Baseline in 2010 which will.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Cost Impacts of two e- ML cycles at sqrt(s) < 250 GeV purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
Proposed machine parameters Andrei Seryi July 23, 2010.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
19 July 2006 Vancouver Global Design Effort 1 Cryogenic Systems Review Tom Peterson for the cryogenics global group.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Global Design Effort1 September 20-22, 2006 MAC Review Power and Water breakout (mixed results) Marc Ross GDE.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
An Overview of the ILC Cryogenic System Tom Peterson, Fermilab LCFOA at SLAC 1 May 2006.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
DR Layout Description ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Cost Impacts of Reduced # Bunches per Train purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius, Fermilab.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
Minimum Machine Update Nick Walker Ewan Paterson AS TAG leaders meeting
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Baseline Technical Review – Central Region Accelerator Systems
Conventional Facility & Siting (CF&S) Overview for the Positron Source
ILC - Upgrades Nick Walker – 100th meeting
Americas KlyCluster Cost Analysis Overview
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
SCRF Monthly WebEx Meeting Sept. 22, 2010
Peter H. Garbincius Fermilab
Summary of WG2 :CFS for staging
Staging in the TDR.
BDS Cryogenic System RDR Status and EDR Plans
Availsim runs and questions
SCRF Monthly WebEx Meeting Jan. 12, 2010
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
Yamamoto WG3: ML-SCRF Parallel Session,
ILC CFS AD&I Daresbury Lab Summary
Cost Comparison of Undulator and e-Driven Systems
, A. Yamamoto SCRF WebEx Meeting.
ILC Global Design Effort
Nick Walker for the Project Management
ILC Cryogenics -- Technical Design Report Planning
Barry Barish Paris ICHEP 24-July-10
Tom Peterson, Fermilab 6 December 2011
Presentation transcript:

ILC - Global Design Effort SB2009 Estimate Needs Peter H. Garbincius Fermilab Main Linac: 1 tunnel, Low Power, Klystron Cluster, DRFS, 1 stage BC RTML: 1 stage BC, (Low Power is too tiny of a gain) Damping Rings: C = 6.48 => 3.24 km Beam Delivery System: travelling focus to preserve L Central Complex: still developing concepts Major impacts on Conventional Facilities! => see Vic PHG - SB2009 Estimates - webex - August 12, 2009 ILC - Global Design Effort

“adjustments” since RDR? Correct many minor errors = < 1 M ILCU ! CFS has calculated reduced volume of Amercias shaft base caverns, but not removed from est yet e- bypass around undulator? not in ML nor e+ Ewan says not part of new Central Complex Doesn’t include any “timing drift” Ewan says not necessary, but Marc adds that same “gap” for undulator is included in e- ML need components: vacuum, quads, instrum. CFS had removed Chilled Water System from August 2008 Klystron Cluster Study (not yet removed from RDR estimate total yet) PHG - SB2009 Estimates - webex - August 12, 2009 ILC - Global Design Effort

what is “starting point” for comparisons? These two items were adopted as part of baseline since RDR, but not included in any updated cost estimate: 6+ => 3+ km Circumference DR 2 stage => 1 stage Bunch Compressor for RTML Proposal is to do “adjustments” from last page as “starting point” and then show estimates for shorter DR and 1 stage Bunch Compressors And then show the estimates for the 1 tunnel ML and Low-P (both for Klystron Cluster and DRFS) PHG - SB2009 Estimates - webex - August 12, 2009 ILC - Global Design Effort

RTML – Solyak – DESY – May 09 Change from RDR 2 stage => 1 stage Bunch Compressor Components 2 stage BC 1 stage BC Low-P RTML ML RTML ML RTML ML 8C1Q Cryomodules 36 560 12 584 12 584 9C0Q Cryomodules 60 1120 0 1168 0 1168 8C1Q + 9C0Q CMs 96 1680 12 1752 12 1752 Total RTML + ML CM 1776 1764 1764 δ= -12 RF units 34 560 4 584 4(2?) 292 total # RF units 594 592 296 (294?) Change # quadrupoles, add new wigglers, reduce # dumps, reduce total length of tunnels (actually transfer some to ML), are the sizes and unit costs of components the same? http://ilcagenda.linearcollider.org/conferenceDisplay.py?confId=3526 s PHG - SB2009 Estimates - webex - August 12, 2009 ILC - Global Design Effort

Damping Ring – 28july 09 Susanna Guiducci 6476 m => 3238 m circumference Is there any low-P impact? half-C & half # bunches => same stored current CFS has geometry - what about power, cooling? half number RF cavities, half number wigglers Other component counts? Dipoles, quads? Do sizes, performance, unit costs change? Cryogenics impact? I’m expecting a new full cost spreadsheet for technical elements from Susanna PHG - SB2009 Estimates - webex - August 12, 2009 ILC - Global Design Effort

Single Tunnel and Low Power Option for Main Linac (only) Don’t impact e+/e- Sources or RTML beyond ML ½ number of bunches, same beam pulse length (not Chris A’s same bunch spacing w/ shorter pulse) Install ½ # RF drivers (~ 33% higher-E modulators) Require estimates for both Klystron Cluster & DRFS New or updated component estimates for: 300 MW waveguide pipe & coaxial in/out couplers may be incl’d in Chris’ 20july09 – need breakdown DRFS has component counts & unit costs as presented by Shigeki Fukuda-san on 15july09 Does CFS have all Power, Cooling, Space req’s? PHG - SB2009 Estimates - webex - August 12, 2009 ILC - Global Design Effort

PHG Low-P questions from 15july09 Information still needed (by PHG): Updated estimates for over-moded waveguide and couplers for Klystron Cluster Study Understand cost impact on cryo-plants (mostly dynamics loss, RF pulse length driven: see presentation from Chris Adolphsen. But this was not distributed!) Which of the two low-p DRFS options to chose? Better developed DRFS cost estimates How do CFS estimates scale for low-power option? Do we need to change to a larger tunnel diameter because of single-tunnel solution?  http://ilcagenda.linearcollider.org/conferenceDisplay.py?confId=3726 PHG - SB2009 Estimates - webex - August 12, 2009 ILC - Global Design Effort

ILC - Global Design Effort I’ll send this list of questions/outstanding items to Nikolay, Susanna, Shigeki, Chris, & Ewan Send backup cryo load info to Tom Peterson Andrei Seryi adds: don’t forget the extra costs for travelling focus (Andrei already provided estimate of ~ 1.5 x cost for crab cavities and its associated cryogenics – this is sufficient, but Andrei is invited to submit a more developed or detailed estimate, if available) Marc Ross wants Nick Walker to verify the split point for the RTML-ML boundary PHG - SB2009 Estimates - webex - August 12, 2009 ILC - Global Design Effort