WELL COMPLETION AND STIMULATION BY BHARAT KUMAR HARANI ASSISTANT PROFESSOR DAWOOD UNIVERSITY OF ENGINEERING & TECHNOLOGY, KARACHI.

Slides:



Advertisements
Similar presentations
Completion Agenda At the end of this presentation, you will be able to: Define completion Describe the process of completion List and define the different.
Advertisements

Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Statewide Rule 10 : Downhole Commingling
Coal Bed Methane (CBM) Permeability Testing WTN Network Meeting April , 2011 ExxonMobil Exploration / Well Testing Team.
Chapter 3 COMPLETION.
CHAPTER 6 – WELL COMPLETION & STIMULATION
Trican’s Burst Port System (BPS) (Patent Pending) A Cost Effective Method for Horizontal Well Stimulation Lewis Facca / Scott Sherman October 14, 2010.
Horizontal & Multi-Fractured Wells
Chapter 3 Casing design.
“ Unusual Interventions ” Jenna Robertson ICOTA Canada Roundtable October 14, 2010.
Should Horizontal Wellbores be Logged? An analytical approach to hydraulic fracturing entry positioning and completion equipment selection.
Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008.
GARP®Presentation ALRDC Seminar May 14 th, 2014 Daryl Mazzanti – Garp Services, LLC Wholly owned subsidiary of Evolution Petroleum Corp (EPM- NYSEMKT )
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Selective Fracturing of a Series of Perforations in a Horizontal Well Using a Resettable Straddle System SPE Josh Thompson Weatherford International.
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
Shale Drilling and Completions
Chapter 1 RESERVOIR.
Completing & Producing A Well
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
John N. Dougherty, PG Lisa Campbell, PG EPA Region 2, New York City
Who Can Plug an Abandoned Well. Overview Introduce the common methods used to construct wells. Discuss the different types of wells Discuss what types.
Definition of Soft Sand
1 Introduction Background of study Four oil producer wells will be drilled in Berlian East field. Few procedures are designed to cover the well completion.
1 ● Well Completions (casing protocols) ● Acidizing ● Fracture treatments.
ARTIFICIAL LIFT METHODS
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Introduction to Well Completions
Lecture 10 Production Engineering
Acid Placement and Diversion
Chapter 3 Well Completions. Two basic types: Open Hole Perforated Casing.
Oil and Gas Production 1 PRO 250 PowerPoint presentation created by Dr. Shauna Kocman used in CMC PRO250 with her permission under Creative Commons License.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 1321 Oil-Field Hydraulics Chapter 1 Completion and Workover.
2016 Williston Basin Petroleum Conference, Bismarck, N.D.
Oil-Field Hydraulics Chapter 2 Production Equipment
Chapter 5 Pressure Transient Testing (I)
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
INSTRUCTOR © 2017, John R. Fanchi
INSTRUCTOR © 2017, John R. Fanchi
Using an Inflatable Element
Hydraulic Fracturing 101.
SUSTAINABLE DRILLING OF OIL & GAS WELLS
Chapter 2: Casing Design Casing Selection
LISTEN TO YOUR RESERVOIR!
Gas Well Deliquification Breakout Session
2017 capl conference what will be unconventional next
Recent Advances in Oil and Gas Production Engineering
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Scope / History Well 25/11-G-18 was drilled nov The well has 7” Bakerweld 140 Screens and swell packers. The well is producing gas from the “heal”
Recent Advances in Oil and Gas Production Engineering
ADVANTAGE BRIDGE/FRAC PLUG S
Artificial Lift System And Sucker Rod Pumps
Oil & Gas drilling.
Completion Object Overview
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
Casing Design Workshop
ME Consultancy Services
US Energy overview Paul Majors P.E. – Jan 2014.
How Well is Your Well? UIC Class I Well Construction Standards
Coal Bed Methane Cementing Best Practices
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
AMAN ULLAH ROLL NO O1 PRESENTATION TOPIC TIGHT RESERVIOR AND HYDRAULIC FRACTURING.
Presentation transcript:

WELL COMPLETION AND STIMULATION BY BHARAT KUMAR HARANI ASSISTANT PROFESSOR DAWOOD UNIVERSITY OF ENGINEERING & TECHNOLOGY, KARACHI

Introduction to well completion General Procedure of well completion Open hole well completion Cased hole well completion

Informal definition: The high time of the well when engineer and personnel comes to decide whether to install the production casing in order to initiate the production at the surface or it should be abandoned. Technical Definition: Well completion means to prepare the well for production by installing the necessary equipments into the well in order to allow the safe and controlled flow of HCS at the surface.

 In an open hole well completion the production casing is just set above the pay zone, while the entire deepen bottom of pay zone is left uncased.

OPEN HOLE COMPLETION Advantage: Simple Saving in cost and time Disadvantage: No selective control Difficult to isolate water or gas Breakthrough Cross flow can not be controlled Not suitable for unstable Formation Application: Low cost/multi well developments Deep consolidated wells. Naturally Fractured reservoirs. Copyright 2007,, All rights reserved

For the most common type of well completion today involves the cased hole completion,in which the production casing and liner are cemented and perforated subsequently.

SINGLE COMPLETION WITH CEMENTED AND PERFORATED CASING Perforated Interval Production Casing Surface Casing Packer RESERVOIR Tubing Copyright 2007,, All rights reserved

COMPLETION WITH CEMENTED AND PERFORATED CASING Advantage: Selective production Zonal Isolation Water/Gas Shut-off Disadvantage: Extra cost (casing and cement, perforation) Formation Damage Application: Consolidated formation. Multi reservoirs with different pressures. When dual Completions are required Copyright 2007,, All rights reserved

A Liner is installed across the pay zone It can be divided into two: Screen Liner and perforated liner Screen Liner : Casing is set above the producing zone and an uncementedscreen and liner assembly isinstalled across the pay zone

OPEN HOLE GRAVEL PACK COMPLETION RESERVOIR TUBING PACKER LINER HANGER SLOTTED,PERFORATED OR SCREEN LINER SURFACE CASING PRODUCTION CASING GRAVEL PACK Copyright 2007,, All rights reserved

Casing is set above the producing zone and a liner assembly is installed across the pay zone and cemented in place. The liner is then perforated selectivelyfor production.

Production casing is cemented through the producing zone and pay section is selectively perforated

PRODUCTION TUBING IS PERFORATED AND CEMENTED

Casingflow: large flow rate no tubing is required, used in middle east. Tubing and Annulus flow: large flow rate flow segregation. Tubing flow: Used widely in Malaysia due to safety, may use one more tubing strings.

Simplest way of completing the well In this method well is completed by single zone with single tubing

In this multiple branches are drilled from a single zone It is used to improve productivity from closely spaced target zones.