Presentation is loading. Please wait.

Presentation is loading. Please wait.

Shale Drilling and Completions

Similar presentations


Presentation on theme: "Shale Drilling and Completions"— Presentation transcript:

1 Shale Drilling and Completions
William Fleckenstein, P.E. BP Adjunct Professor Colorado School of Mines PETROLEUM ENGINEERING DEPARTMENT

2 Shale Drilling and Completions
Vertical vs. Horizontal Drilling PETROLEUM ENGINEERING DEPARTMENT

3 United States Current Rig Count (Baker Hughes) and Completions
Breakout Information This Week +/- Last Week Year Ago Oil 718 22 696 386 332 Gas 955 -12 967 221 734 Miscellaneous 10 1 9 -2 12 Directional 218 220 32 186 Horizontal 943 24 919 436 507 Vertical 522 -11 533 137 385 PETROLEUM ENGINEERING DEPARTMENT

4 Drilling Rigs are Differentand Completions
PETROLEUM ENGINEERING DEPARTMENT

5 Shale Drilling and Completions
Why not just a horizontal well? PETROLEUM ENGINEERING DEPARTMENT

6 Demand for more fracsd Completions
PETROLEUM ENGINEERING DEPARTMENT

7 The Reservoir Contact Is Even Better!! Drilling and Completions
PETROLEUM ENGINEERING DEPARTMENT

8 Each Fracture Stimulation Creates a Complex Fracture Network Drilling and Completions
PETROLEUM ENGINEERING DEPARTMENT

9 Microseismiclling and Completions
Maps the fracture growth Identifies azimuth Requires observation well PETROLEUM ENGINEERING DEPARTMENT

10 SMicroseismic Barnett Shale Horizontal and Completions
PETROLEUM ENGINEERING DEPARTMENT

11 Prop the Fractures OpenDrilling and Completions
PETROLEUM ENGINEERING DEPARTMENT

12 Horizontal Completions with Mechanical Packers
Allow multiple stimulations along horizontal interval

13 Horizontal Completions Frac Baffles or Frac Sleeves
Diversion with Expandable Packers Sleeves are actuated with balls

14 Coiled Tubing with Sand Plugs

15 Horizontal Completions Cemented Perf and Plug
Annular Isolation (and diversion accomplished with cement) Frac stages initiated through perforations isolated with bridge plugs Bridge plugs are removed with coiled tubing drilling. Plug and Perf Method

16 Size of Fracture Stimulationsand Completions
PETROLEUM ENGINEERING DEPARTMENT

17 Well Costs (Range Resources)Completions
PETROLEUM ENGINEERING DEPARTMENT

18 Lots of Water in “Water Fracs” Drilling and Completions
PETROLEUM ENGINEERING DEPARTMENT

19 Horsepower to pump those water fracsDrilling and Completions
PETROLEUM ENGINEERING DEPARTMENT

20 Protection of Groundwater Drilling and Completions
Getting a good cement job means: Centralization Pipe movement and fluid velocity (looking for turbulence) Spacer design Rheology properties of mud Other specific issues to a cement job. PETROLEUM ENGINEERING DEPARTMENT


Download ppt "Shale Drilling and Completions"

Similar presentations


Ads by Google