1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.

Slides:



Advertisements
Similar presentations
Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Advertisements

LED:NMSO Workshop 11/02/ SHOCK VALUE NM State Science Olympiad 2013.
1 Electronics Simulation in the Photon Transport Monte Carlo Preamp model Receiver/discriminator circuit CAFÉ driver circuit model Examples Summary January.
Science Quiz 2010 SECONDARY LEVEL 4th Year Prof. Jasmine Angelie V. Albelda.
ECE410 Spring 2012 Lecture #26 Mutual Inductance.
HBD Meeting 4/25/06 SB and BNL Crew. 4/25/06 B. Azmoun 2 Installation of HBD into PHENIX Transported HBD from USB under gas (CF4) flow (maintained ~ 1Torr.
Graphing: trendlines and outliers (anomalies). shows points connected (NOT trendlines) suggests there’s a huge dip at 7 minutes this is probably NOT a.
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
1 Stony Brook Update Further Progress T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Getting Serious about HBD East T.K. Hemmick for the Tent Crew.
Capacitors insulating dielectric Capacitors store charge. They have two metal plates where charge is stored, separated by an insulating dielectric. To.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
Detector Systems Update MICO April 14, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u H6533MOD PMT assembly reliability is the main concern.
MICE - Detector Safety/Integration. MICE - Detector Safety/Integration – Detectors external to Magnetic Volume  Detectors external to magnetic volume.
1 Some Water Extreme Calculations TK Hemmick for the Tent Crew.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
1 Stony Brook Update Stretching your LEGS T.K. Hemmick for the tent crew.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
1 Update on SB The Stony Brook Crew. 2 QE Reproducible in Addn’l Test Excellent QE again (basically identical). Excellent QE again (basically identical).
1 Stony Brook Update: A bit more on Negative Ions T.K. Hemmick for the Tent Crew.
1 Stony Brook Update: Keep It Clean T.K. Hemmick for the Tent Crew.
Weds., Jan. 29, 2014PHYS , Dr. Andrew Brandt 1 PHYS 1442 – Section 004 Lecture #5 Wednesday January 29, 2014 Dr. Andrew Brandt CH 17 Electric Potential.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
1 Thomas K Hemmick May 17 th, The Gas Electron Multiplier: GEM Thomas K. Hemmick Stony Brook University.
CE Coding and Transformations. Schedule WeekGrande LecturePetite LectureTutorialLab 7 Sep IntroductionIntro to MAPLEIntro MAPLEIntegration 14 Sep.
Do now! Can you continue the sheet you started last lesson? (“Another current model”)
QCAL upgrade status FE electronic replacement actual status future design test E. Santovetti KLOE General meeting December 2002.
The Adventures of Sparky LeCroy TK Hemmick for the Stony Brook Crew and Maxim.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
HBD Update (brief!) TK Hemmick. Spring Test: VERY few tracks  Avoiding the shadow of the local beam dump and other obstacles moved HBD out to about 40.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Status Update Stony Brook Crew. Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.
1 Stony Brook Update: Ready to Start… T.K. Hemmick for the Tent Crew.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
CE Coding and Transformations Sept – Nov 2011.
1 Stony Brook Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions Excellent!!!
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 HBD Update Back to the Future T.K. Hemmick for the HBD crew.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors Craig Woody Brookhaven National Lab B.Azmoun 1, A Caccavano 1, Z.Citron 2,
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
Experiences in EIC R&D Program RD6: Tracking & PID Consortium TK Hemmick for the EIC Tracking/PID Consortium Shift Crew 2 Shift Crew 1 BNL Florida Tech.
Academic Vocabulary 7 th Grade – Unit 1 – Week 5.
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Series and Parallel Circuits. Series Circuits ► Are the simplest type of circuits. ► Series circuits – all the components (lamps, cells, switches, etc.)
1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt.
1 Stony Brook Update: What a long STRANGE TRIP its been T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Leaks in LEGS and HBD West T.K. Hemmick for the Tent Crew.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 Stony Brook Update Back to the Future T.K. Hemmick.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Electromagnetic Induction 4 Quiz 1.Who discovered electromagnetic induction? a)Michael Faraday b)Thomas Edison c)Joseph Henry 2.A transformer.
CAPACITORS. IF A CAPACITORS JOB IS TO STORE ELECTRICAL CHARGE, WHERE WOULD THEY BE USEFUL?
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
1 Stony Brook Update: Power Surprise… T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Cross Roads T.K. Hemmick for himself.
T.K. Hemmick for the Stony Brook Crew
T.K. Hemmick for the Stony Brook Crew
Stony Brook Update: Ready to Start…
T.K. Hemmick for the Stony Brook Crew
EIC Tracking Meeting, March 26, 2012
SCHEDULE WEEKDAY LESSONS:
500 nm WRITE VOLTAGE 0 V.
Recent TOB Developments
Recent TOB Developments
LED Basics Jim Hinds RICHMOND CONTROLS.
Presentation transcript:

1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew

2 Now we dry… All the GEMs are in. All the tests are done (twice): –Capacitance while connected. –Voltages on cables. Glove Box being used as dryer: –50 cfm….~1400 liters/minute. –4.5 ppm and falling…

3 Odds and Ends: Schedule: –Dry the detector all this week. –Remove from glove box Monday Oct 9. –Ship to BNL Monday October 16. Flashing the detector. –I personally dont like the LED option: QE at 250 nm is probably dominated by thermal noise. The real test is QE at low wavelengths! –The only reason that we cant flash normal lamps is that Hamamatsu uses transformers. I am 100% certain we can flash a normal lamp. Transformer in base is removable and non-magnetic circuit is easy to design and build. So…put 4 lamps on the detector…put electronics far far away.