1 Pricing your Product or Service Florida Gulf Coast University Small Business Development Center Procurement Technical Assistance Center 239-745-3708.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Flexible Budgets and Standard Costs
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Regional Routing Model Review: C) Model Formulation and Scenario Analysis Frank Southworth Oak Ridge National Laboratory Oak Ridge, TN NETS Program.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Create an Application Title 1A - Adult Chapter 3.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
1 Discreteness and the Welfare Cost of Labour Supply Tax Distortions Keshab Bhattarai University of Hull and John Whalley Universities of Warwick and Western.
Construction Engineering 221
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) FAR.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
Solve Multi-step Equations
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Job Order and Process Costing
Break Time Remaining 10:00.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Introduction.
Income Measurement and Profitablity Analysis
NIH RESEARCH CONTRACTS
MANAGEMENT ACCOUNTING
PP Test Review Sections 6-1 to 6-6
COST ANALYSIS VS. PRICE ANALYSIS Andrea ONeill Cost/Price Analyst 27 April 2011.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Inven - Cost - 1Inventory Basic Valuation Methods.
2 |SharePoint Saturday New York City
VOORBLAD.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Successful Proposal Writing.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 Impact Assessment. 2 Demographics 3 Sex and Age.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Indicator 1 – Number of Older Americans Indicator 2 – Racial and Ethnic Composition.
Flexible Budgets and Performance Analysis
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Proper Management of Federal Grants – Support for Salaries and Wages or Time & Effort Reporting 1.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
“Pricing” Florida SBDC at FGCU Helping Businesses Grow & Succeed “Doing Business with the Government” State Designated as Florida’s Principal Provider.
Florida Procurement Technical Assistance Center
Florida Procurement Technical Assistance Center
Presentation transcript:

1 Pricing your Product or Service Florida Gulf Coast University Small Business Development Center Procurement Technical Assistance Center

2 Objectives Cost Cost Realism Price Price Analysis Profit

3 References FAR 14 Sealed Bidding FAR 15 Contracting By Negotiations FAR 16 Type of Contracts FAR 30 Cost Accounting Standards Administration FAR 31 Cost Principles and Procedures FAR Appendix B Cost Accounting Rules (Down Load as a PDF file) Federal Acquisition Regulations

4 Methods of Procurement Sealed Bids (Price only) Invitation For Bid (IFB) Negotiated (Price or Cost) Request For Quote (RFQ) (Price only) Request For Proposal (RFP) (Price or Cost Data)

5 What is Cost? Cost is the expense the contractor will incur in performing the work

6 Cost Criteria: Reasonable, Allowable and Allocable Variable, Fixed, and Semi-Variable Direct and Indirect

7 COST CONTRACTS Cost-Plus-Fixed Fee Cost-Plus-Award Fee Cost-Plus-Incentive Fee Cost-Sharing

8 THREE BASIC Cs FOR COST TYPE CONTRACTS Know your Costs Know your Customer Know your Competition

9 What will the Government Pay? The Government will reimburse the contractor to do the work as long as the costs are allowable, reasonable, and properly allocable to the contract.

10 What are the Cost Elements? (Your Company) Direct Labor Overhead Material Subcontractors General and Administrative Travel Profit

11 1) Overhead may Include: Cost of Doing Business ! ! ! ! ! Taxes Federal Taxes Social Security Taxes (FICA) Employer portion Medicare Taxes Property Taxes Licenses State Licenses County Business Licenses

12 2) Overhead Continued: Fringe Benefits: Employee Health Insurance Annual Leave Sick Leave Family Leave Retirement

13 3) Overhead Continued: Office Space Furniture Electricity Air Conditioning Heat Equipment Copiers Computers Phones

14 4) Overhead Continued: Utilities: Sewage Waste Water Treatment Trash Removal Recycle Program

15 5) Overhead Continued: Insurance: Building Car Truck Workers Compensation Contract agreements: Credit Cards Bldg. Maintenance Lawn Service Depreciation Interest on Loans

16 What are the Cost Elements? (State) Salaries Fringe Benefits Travel Other Direct Costs In-House Charge Indirect Costs Profit

17 Build a Cheeseburger?

18 Base Line for the Cheeseburger One made every 30 seconds, start to finish Includes: Direct Labor Overhead Material Profit

19 Direct Labor- ½ minute labor $ minute labor $ 00.30

20 Overhead is 100%

21 Materials Build a cheeseburger starting at the bottom –Bun Bottom –Mayonnaise –Mustard –Patty –Cheese –Pickle –Lettuce –Tomato –Ketchup –Sesame Seed Bun Top

22 Materials

23 + Materials

24 Cost Elements for the Cheeseburger? Direct Labor $ 0.15 Overhead 100% $ 0.15 Material $ 0.71 Subtotal $ 1.01 Profit 10% $ 0.10 Total Cost $ 1.11

25 What is Total Cost? Cost Elements + Profit = Total Cost

26 Cost Realism Cost and Technical proposals must be realistic for the work to be performed Reflect a clear understanding of the requirement Cost must be consistent with the various elements of the technical proposal

27 PROFIT Represents the payment the contractor may receive for performance over and above the costs incurred for doing the work. Contractor/ Government Risk

28 Profit Statutory Limits Cost Plus Fixed Fee 10% Research and Development Cost Plus Fixed Fee 15% Architect and Engineering Services 6%

29 What is Price? Cost Elements + Profit = Price

30 What is the Price for Your Service? Direct Labor $10.00 (Unloaded Rate) Overhead $15.00 Est. 150% Material $ 3.00 Subtotal $28.00 Profit $ % Total Price $30.80 (Loaded Rate)

31 Profit Factors for FFP Contracts Market Competition Contractor Risk 100%

32 Sales -Direct Cost -Indirect Cost = Net Profit Are You Making a Profit ?

33 Price Analysis Process of examining and evaluating a proposed price without regard to evaluating the separate cost elements and proposed profit.

34 Firm-Fixed-Price with Economic Adjustments Indefinite Delivery Contracts Time and Material Labor Hour Letter Contract Firm Fixed Price Contracts

35 Price must be Fair and Reasonable Based on a) Adequate Price Competition b) Previous Prices c) Yardstick d) Published Prices or e) Independent Government Estimate

36 Tips 2080 Hours = Gov Staff Year Loaded/Unloaded Rates Separate Technical and Cost Proposals Best Value Awards DCMA- Direct Labor Rates Overhead G&A (For a Specific Company)

37 SUMMARY Cost Cost Realism Price Price Analysis Profit

38 Thank You Contact Dan Telep at SBDC/PTAC