International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez.

Slides:



Advertisements
Similar presentations
HOW TO FORM A PARTNERSHIP Training Unit 3.2 National, transnational and local networks.
Advertisements

1 of 19 Organization and Management New Structures and Alliances IMARK Investing in Information for Development Organization and Management New Structures.
DOs and DONTs Joan-Anton Carbonell Kingston University EC External Expert TEMPUS Modernising Higher Education TEMPUS INFORMATION DAY.
The vision for Sri Lanka’s Tertiary and Vocational Education
OECD International Futures Programme 1 OECD Futures Project The Commercialisation of Space and the Development of Space Infrastructure: The Role of Public.
1 POLICY ON SCIENCE AND TECHNOLOGY BY: M.B. WILLIAMS DIRECTOR, DEPARTMENT OF SCIENCE AND TECHNOLOGY.
Financing of OAS Activities Sources of cooperation Cooperation modalities Cooperation actors Specific Funds management models and resources mobilization.
U.S. Civilian Research & Development Foundation Peace and prosperity through science collaboration 1 Cathleen Campbell U.S. Civilian Research & Development.
PRESENTATION AT THE WORKSHOP ON LDC PRIORITY NEEDS FOR TECHNICAL AND FINANCIAL COOPERATION 29 OCTOBER 2009 GENEVA Sari Laaksonen Coordinator, Integrated.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
The Implementation Structure DG AGRI, October 2005
The Management of European Structural Funds in Western Scotland ISPA Partners Meeting April 2003 Laurie Russell Strathclyde European Partnership.
European Commission DG Research Co-operative Research Training Session on Ifigeneia Pottaki Research & SMEs DG Research - European Commission Training.
RUnUP Network Gateshead Local Support Group Meeting Thursday 27 th November 2008.
Public B2B Exchanges and Support Services
Project Appraisal Module 5 Session 6.
1 European benchmarking with the CAF ROME 17-18th of November 2003.
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
The International Trade Centre (UNCTAD/WTO) The International Trade Centre (UNCTAD/WTO)
The CTCN Services UNEP – March 5th, 2014, Nairobi, Kenya.
Building effective networks. In this session Consider the value of building networks with NGOs and other stakeholders. Learn how to develop effective.
How to commence the IT Modernization Process?
HORIZON 2020 STEPHEN FOX FOR KEELE UNIVERSITY 26 TH FEBRUARY 2014.
USE OF REGIONAL NETWORKS FOR POLICY INFLUENCE: THE HIS KNOWLEDGE HUB EXPERIENCE Audrey Aumua and Maxine Whittaker Health Information Systems Knowledge.
SC – Small Medium Enterprises (SMEs)
This project is funded by the EUAnd implemented by a consortium led by MWH RCBI ‘handover’ meeting Estonia-Latvia-Russia ENPI CBC Programme Riga, 20 March.
Enterprise without Borders Volunteer Classroom Visit (45’)
Information and Communication Technologies (ICT) in the Seventh Framework Programme Support actions.
1 Budgets and Budgetary Control Prepared and Presented By Gladstone K. Hlalakuhle.
Organization, Implementation, and Control
Implementing Strategy in Companies That Compete in a Single Industry
Stefano Fontana European Commission DG RTD Research for the benefit of SMEs SMEs in the.
In Europe, When you ask the VET stakeholders : What does Quality Assurance mean for VET system? You can get the following answer: Quality is not an absolute.
2015. MITA. All rights reserved.````` Lithuanian Country Report Gintarė Narakienė The Agency for Science, Innovation and Technology.
Massimiliano Di Pace1 EU TRADE POLICY Eu provides also initiatives, financing and services to support Eu companies’ efforts for internationalisation The.
AusIndustry Martin Cebis AusIndustry – Entrepreneur Development Facilitator.
Joint Business Plan Madhurjya K. Dutta 1mk_dutta Sept 2010.
1 Framework Programme 7 Guide for Applicants
Work Programme for the specific programme for research, technological development and demonstration "Integrating and strengthening the European Research.
INNOVATION OR KNOW-HOW IN FRANCHISING ? Guy GRAS – Eurocommerce SME Day – 21/10/ Brussels 1.
Logistics and supply chain strategy planning
Joint Venture in construction company in West Bank.
A new start for the Lisbon Strategy Knowledge and innovation for growth.
Key Barriers for the ICT Research Sector in Serbia, and Recommendations for Future EU- Serbia Collaboration Miodrag Ivkovic, ISS Milorad Bjeletic, BOS.
Commissioning Self Analysis and Planning Exercise activity sheets.
Practical aspects Dr. Ir Matthijs Soede Senter/EG-Liaison “Practical Aspects of Preparation FP6 projects Poznan - 21 November 2002 Dr. Ir.
Chapter 8 International Strategic Alliances
Josefina Lindblom European Commission DG Research - Unit T4: SMEs SMEs in the.
WIPO Pilot Project - Assisting Member States to Create an Adequate Innovation Infrastructure to Support University – Industry Collaboration.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
Why do they die? Understanding why and how joint ventures die gives insight into how firms can make better use of them. Even though we focus on termination,
December_2009 Partnership building. December_2009 Partnership building within the partnering process COREGROUPCOREGROUP FORMAL LAUNCH $ $ $ $ $ cost centre.
European Commission - DG Research - Directorate B – “Structuring the European Research Area” Jean-David MALO – Bucharest, February 12-13, NOT LEGALLY.
World Intellectual Property Organization DCPPS 1 presented by Mr. Vladimir Yossifov WIPO NATIONAL WORKSHOP ON INNOVATION SUPPORT SERVICES AND THEIR MANAGEMENT.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
WP1: IP charter Geneva – 23rd June 2009 Contribution from CERN.
Glasgow, 17 May 2012 Mike Coles Developments in the validation of learning in the EU.
WATER AND SANITATION SECTOR (WSS) IN ESTERN EUROPE AND CAUCASUS Strategic Approach of KfW Development Bank Dr. K. Gevorgyan KfW Representative in Armenia.
The partnership principle and the European Code of Conduct on Partnership.
Interreg IIIB Trans-national cooperation: Budget comparison : 440 million EURO 420 m EURO (Interreg IIC prog.) + 20 m EURO (Pilot Actions)
Competitive and Collaborative Strategies.  General Environment ◦ Social, Technological, Economic, Ecological, and political forces  Task Environment.
WSBI (World Savings Banks Institute) The Global Voice of Savings and Retail Banking Miami, 22 May 2012 Miami, 22 May ISIC Event Presentation.
CHAPTER 11 STRUCTURE AND CONTROLS WITH ORGANIZATIONS.
MTT Agrifood Research Finland - strategy Target for 2015 and operating model set for achieving it.
Ivan Mikloš Deputy prime minister of the Government of the Slovak Republic responsible for economic affairs Bratislava 22 November 2004 COMPETITIVENESS.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Presentation transcript:

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez ECLAC/IDE(JETRO) Joint Project UNDP Thematic Trust Fund: Information and Communication Technology (ICT) for Development Session 6

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Speech´s organization Part 1 : twenty years experience of the European model Eureka Lessons to be learned Part 2: An experience without previous model but with an important component of international cooperation: Rafaela case

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez A Model that can be adapted EUREKA is a pan European network represented in Member countries by National Project Coordinators (NPCs). They assist in the search for suitable partners, the setting up of the structure of each EUREKA project, and providing contacts with potential public and private sources of finance. No central EUREKA fund exists. General communication is carried out through the EUREKA Secretariat in Brussels, Belgium, which provides information, international coordination and maintains the EUREKA project data.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 2 EUREKA is of particular interest to SMEs because it is: Highly flexible Works with a bottom-up structure Avoids bureaucracy Employs simple rules Provides a basis to begin commercial collaborations across geographical borders

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 3 The main advantages of EUREKA projects are: Projects can be launched in virtually all technological areas. They must have a civilian nature. Projects are bottom-up: the partners are totally free in their choice of topic, partner(s) and timeframe, provided there is market potential for their idea. They are never bound to a strict research programme and there are no centralised calls for proposals. Project participants retain complete ownership of Intellectual Property Rights (IPR). EUREKA projects can be of any size, ranging from several hundred thousands of euro to tens of millions. However they should involve a minimum of 2 independent partners from 2 different EUREKA Member States. EUREKA is very flexible: projects are approved approximately four times per year and the EUREKA label (EUREKAs seal of approval) is awarded once a year, at the end of the current Chairs term of office (this is usually in June). There are only limited reporting obligations. EUREKA tries to be as non- bureaucratic as possible.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 4 SETTING UP A EUREKA PROJECT There are three main phases in the setting up of a EUREKA project:. Project: as illustrated in the chart.. National: the NPCs provide support in the setting up of a project and assist in the search for local public and private funding.. EUREKA: for a project to be awarded the EUREKA label it must be directed at a product, process or service with a civilian purpose and include participation from more than one EUREKA member country.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 5 Project idea Contact National Project Coordinator (NPC) Develop project idea and set up project partnership Secure financing per partner Submit project proposal to EUREKA via main contact NPC Endorsement by EUREKA EUREKA label awarded START PROJECT

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 6 DURING THE PROJECT PHASE Participation in EUREKA is possible in three ways:. By setting up your own consortium. By joining an existing project. By joining a Cluster project DURING THE NATIONAL PHASE For the duration of a project, project initiators should stay in contact with the National Project Coordinators (NPC) of the countries involved. NPCs attend EUREKA Project Meetings 4-5 times a year at which all new projects are discussed and EUREKA labelling is prepared. DURING THE EUREKA PHASE With the agreement of the governments concerned, the project proposal then enters a period of circulation. This circulation period enables additional countries to express the interest of other participants to join the project.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 7 KEY FACTORS FOR SUCCESS There are some basic criteria that you should think about and some universal principles that you can apply to any idea or inspiration in order to assess whether it would form a sound basis for a project. These principles are based on best practice and, although given equal weight here, each will have a different significance at different stages of the project. 1. MARKET OPPORTUNITIES Although the advancement of technology leads to the development of some projects, in EUREKAs experience, most successful innovations come as a result of a clear market need for a particular piece of research. This need may change whilst the project is in progress or may differ from country to country. It is however important that from the outset all industrial partners involved in the project have a clear understanding of the market they are in and the sort of market advantages they hope to gain by undertaking the research.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 8 CHECKLIST. Do you have a clear idea about the possible markets which may be created or expanded as a result of the technological developments you are hoping to achieve via this project?. Will you be capable of exploiting these results from both an investment and commercial point of view?

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 9 2. CLEAR OBJECTIVES If a collaborative research project is to succeed all objectives must be clearly stated from the start. These objectives provide the link between technical feasibility and market opportunity and lay the foundations for a detailed work plan. Projects with poorly defined objectives almost always lead to inefficiencies in coordination and a waste of both time and effort. Often this then leads to a decrease in the motivation of those involved. The project should comprise a small number of central themes (what is the project about?) and should be focused, realistic and achievable. Successful projects incorporate both clear goals and a degree of flexibility to allow changes if necessary. Based on the broader objectives, you will need to develop a more detailed list of aims which can then be translated into the practical requirements necessary for the project to succeed. Requirements should include functional specifications that identify the technologies to be developed and the level of performance required; cost and price specifications that indicate how much the market is willing to pay for it. Both specifications are usually linked to a business plan which will contain more detailed projections and a proposed strategy for the commercialisation of the results of the research.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 10 It is important to distinguish between short-, medium- and long-term objectives. However, they should all be built on a common basis and should not contradict one another as they underpin the projects overall objectives. If you are to fully exploit the potential intellectual and commercial benefits of the project, the work undertaken by each participant should at all times remain aligned to the projects overall technical and commercial strategy. Coordination between technological, commercial and production strategies is key to the projects eventual success. All objectives should be detailed in the Consortium Agreement

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 11 CHECKLIST. Are the objectives of the project clear to all partners?. Do all partners fully agree on the objectives?. Are the objectives sufficiently concrete and measurable?. Is the project within the core activity of each of the partners?. Is the project aligned to the commercial strategy of each of the partners?

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model FINDING THE RIGHT PARTNERS The partnership must be formed with the aim of bringing together teams with complementary, rather than overlapping skills. Partners may complement one another horizontally (ie they may have a different market orientation or differenttechnological competencies) or, as is most common, the partnership may be more vertical. That means that it is basedon a vertical market relationship between partners who have a full or partial combination of knowledge suppliers(universities, component manufacturers, system assemblers and users). To date, the majority of successful projects have been based on vertical partnerships. Users have an important role to play in that they provide a market pull that helpsto shape the direction of the project. For a stable and efficient structure to be set up each partner must add value to the partnership and also feel that they are able to gain a reasonable share of the benefits. An arrangement in which one side gains too great a share of the rewards can quickly produce discontentment within the partnership and most likely lead to its collapse.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 13 CHECKLIST. Does the partnership contain all the skills necessary to complete all project tasks adequately?. Is there too much overlap between some of the partners?. Does each of the partners offer sufficient added-value to the project?. Are suppliers and end-users foreseen in the consortium?. Have the financial stability and technological capabilities of all industrial partners been verified?. Is there a good balance between the investment made by each partner and their potential reward?

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model PROJECT MANAGEMENT Project management is a fundamental part of the implementation of project objectives, it helps control and monitor the projects timeframe and also manages costs. Whoever takes on the role of project management will usually also be responsible for the organisation of general project meetings and will take and distribute minutes of those meetings. Project management in international collaborative research can be demanding and time consuming. Given the complexity and unpredictability of the research tasks involved in this kind of research, it is also not easy to define in a simple procedure. Best practice is to ensure that an adequate structure is put into place from the beginning. This structure will allow for the effective coordination of activities and provide a basis for discussion and agreement of strategic issues. For many projects, a Project Leader or Project Coordinator is designated. If appropriate, the Project Leader can be assisted by an internal or external Management Team to help them in the accomplishment of day-to-day tasks. And depending on the size of the project, a Steering Committee may be set up.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 15 CHECKLIST. Has an adequate management structure been created to ensure the effective execution of the project?.Has the role of each of the management actors (ie Project leader, Steering Group, Work Package Leaders etc) been sufficiently described and have these persons been identified?. Have proper channels been arranged for communication between partners, funding organisations and national offices?

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model RESOURCES AVAILABILITY A lack of adequate resources, together with a change in market conditions can mean that some EUREKA projects fail to meet their full potential. There are three types of resources you should consider:. Financial. Technical. Human Each is of critical importance to the success of a project. For a project to succeed the funds must be both available and adequate. Inadequate funding can significantly reduce the speed of innovation which in turn almost certainly limits its impact on the market. At the outset of the project, participants must look realistically at the possible cost of undertaking the research and determine how those costs can be met. Financing can be through internal (own) resources or external (public or private) sources, or a combination of these.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 17 CHECKLIST. Have adequate general and specific partner spending plans been established?. Does each partner have the ability and skills to realise their specific scientific/technical tasks?. Have project partners acquired sufficient financial resources to execute the project fully, including validation of the technology?. Do the researchers and technicians assigned to the project by the project partners have the necessary skills and expertise to make it a success?

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model PARTNERSHIP AGREEMENT In preparing for a EUREKA project one of the first tasks is to write a Memorandum of Understanding (MoU) and a Confidentiality Agreement. These are generally written by the project partners. The MoU describes the purpose of the project in broad terms and expresses the willingness of the partners to collaborate. The confidentiality agreement assures partners of a protected exchange of information. Both agreements are signed by all participants in the project. Before beginning the actual project, it is advisable that you put in writing a more detailed arrangement. This Consortium Agreement should cover some or all of the following:

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 19. Objectives of the project. How the project will be implemented. Terms of confidentiality and publication of results. Organisational structure. Project funding. Protection and ownership of the resulting technology. How results will be exploited. Liability

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Eureka model 20 When negotiating a Consortium Agreement, it is important to bear the following in mind:. Successful cooperation agreements take a long time to plan and negotiate: If you want yours to succeed, take the appropriate amount of time and make sure the right people are consulted.. Negotiations should be based around a sound and clear strategy of where all partners want to go.. The advantages of taking part in the project must outweigh the disadvantages, for all partners.. The agreement needs to comprehensively cover what to do when things go wrong as well as when they go right.. Remember that the complex international legal environment can make it extremely difficult to enforce the rights of a weaker party. What to do in these circumstances must be laid out in the agreement.. For the endeavour to succeed all partners must live up to the terms of the agreement.. Even the best written contracts cannot guarantee that there will be no power imbalance between participants.. The agreement is just a prerequisite – it is not the project.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Rafaela Case An experience without previous model but with an important component of international cooperation: Rafaela case

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Rafaela Case The territorial and sectorial agglomeration of companies known as Belgrano Department or Rafaela case is an example of competitiveness, profitability and sustainable export capability. The Belgrano department (40,000 habitants) concentrates 30% of the national production of seeders, pulverizers, harvesters and tractors. In many small towns of the zone unemployment is unknown. The industries located in the city of Rafaela have exported in 2003 an equivalent to US$ 108 millions, having an average of ten employees. The price per exported Ton amounts US$ 2,148, being the national average US$ 274 per Ton. In the period (time of over-valuated local currency) the industrial SMEs of the cluster have a better performance than the ones working as isolated firms. During that period the general occupation rate of the industry has fallen 20% but the activity of the clusterized companies remained without significant changes.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Rafaela Case 2 The trend to settle small factories near to complementary and at the same time competitive colleagues (integrating the same productive chain) allowed to compensate the pressure of open markets, financial constraints and globalization. When this movement has begun nobody spoke about cluster or pole, it was like an interests coincidence pushed by public and private actors. Many firms are quality certified; some of them are exporting to the European Community. According to World Bank terminology Rafaela is a case study of LED (local economic development). Mercosur and NAFTA played no significant role for this success.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Rafaela Case 3 Senior Volunteers Program JICA (Japan International Cooperation Agency): According to an agreement with JICA two International Trade Japanese experts are working since April 2003 for the Internationalization of local companies Program. Project goals are to give in-company training, technical support in marketing and international trade to the present or potential exporting SMEs, and especially to foster and widen the internationalization of the industrial milk processing and metal- mechanical SMEs of Rafaela. This program has enabled to the city and the industries to get information about an (for them) unknown market and to establish business contacts with Japanese world- class companies.

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Rafaela Case 4 The Rafaela Municipality assumed the compromise to continue pushing the exports development of the industrial sector and during 2004 an International Trade Program with the direction of Motosuke Takayama is on going. The Japanese experts have visited 33 firms located in Rafaela pertaining to the following sectors: metal mechanical, car parts, food, furniture and packaging. In 15 cases market penetration studies and preliminary sales efforts were performed, having Japan as the referral market. Also introductory training and contact facilitation with Japanese companies were performed for companies without previous export expertise like Marengo (candies) and EMC (furniture).

International Seminar Information Technology for Development of Small-and Medium-sized Exporters in East Asia and Latin America November 2004 Dr. Rodriguez Rodriguez Rafaela Case 5 LED (local economic development) Using WB terminology it is possible to make clear the causes: · Institution for policy and planning: Municipal LED training and research institute (ICEDEL). · Economic institutions with relevant role: Small Enterprise Business Association (CAPIR); Technology & Innovation Centre; Enterprise Development Centre. · Types of LED Program Initiatives: Locality development (infrastructure & physical planning), · Enterprise development (incubator, enterprise support services; innovation). · Horizontal cooperation actors: Municipality, local business associations, a new small enterprise association and NGOs. · Learning processes: Regularized Knowledge Transfers (Training), Organizational Learning in Local Public Agency, Strategic plan for the city. Re