Overview Beam Position Monitoring Wire Scanners / Cherenkov Detectors

Slides:



Advertisements
Similar presentations
1 KEK Cavity BPM Hitoshi Hayano Development of Cavity BPM for Q-magnet attachment, Aiming; compact design, 0.2µm resolution, BPM center error (between.
Advertisements

Bingxin Yang 1/24/2008 Test and Calibration Plan for LCLS-BLM at the APS.
X-Ray Diagnostics for the LCLS Jan , 2004 UCLA.
Bob Lill Undulator Systems – Cavity BPM October 12, 2006 Undulator Cavity BPM Status.
Bob Lill FAC meeting Cavity October 30, 2007 LCLS Cavity BPM Status and Testing.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June th TB/SGC Meeting.
9/25/031 First Tests of an Optical Transition Radiation Detector for High-Intensity Proton Beams at FNAL September 25, 2003 Vic Scarpine.
___________________ Jürgen Schreiber, ECFA/DESY LC workshop, Amsterdam, April 1-4, 2003 BEAM ENERGY SPECTROMETER DESY – Dubna – TU Berlin Machine physicists,
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
Introduction to Beam Instrumentation
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
CLIC Drive Beam Beam Position Monitors International Workshop on Linear Colliders 2010 Geneva Steve Smith SLAC / CERN
Tohoku university Daisuke Okamoto TILC09 1. Motivation 2. Principle 3. Design 4. Expected performance 5. Conclusion contents.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
October, 2009 Internal Review Beam Instrumentation David Gassner.
Beam Test status and Plans of the ILC Main LINAC BPM
Beam Instrumentation Introduction Beam Charge and Current Summary Introduction Beam Position Summary Introduction Instrumentation for Transverse Beam Parameters.
A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Pioneering Science and Technology Office of Science U.S. Department of Energy UNDULATOR SYSTEMS REVIEW MARCH 3-4, 2004 ARGONNE NATIONAL LAB. 1 LCLS Optical.
Measurements of Intense Proton Beams using Optical Transition Radiation Vic Scarpine, Fermilab TIPP 2011 Chicago, IL June 10, 2011.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Recent APS Storage Ring Instrumentation Developments Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
Wir schaffen Wissen – heute für morgen PSI, March 2013 Paul Scherrer Institut PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics for FELs.
Bunch Shaping for Future Dielectric Wakefield Accelerators W. Gai Mini-Workshop on Deflecting/Crabbing RF Cavity Research and application in Accelerators.
Recent Studies on Electron Cloud at KEKB 1.EC studies at KEKB 2.Recent results –Clearing Electrode –Groove surface –EC measurement in Q and solenoid field.
Preamplifier R&D at University of Montreal for the drift chamber J.P. Martin, Paul Taras.
Re-entrant BPM R&D for ILC Main Linac
LCLS Bunch Length Monitor Marc Ross - SLAC
An X-band system for phase space linearisation on CLARA
CLIC Main Linac Cavity BPM Snapshot of the work in progress
SC Quadrupole Magnets in ILC Cryomodules
CLIC Workshop 2016: Main Beam Cavity BPM
Test of Optical Stochastic Cooling in CESR
Thermal emittance measurement Gun Spectrometer
Injector Performance Requirements Conventional Facilities Update
Few Slides from RF Deflector Developments and Applications at SLAC
Accelerators R&D at IFIC “Reunión de Electrónicos”, May 2010
Intra-Pulse Beam-Beam Scans at the NLC IP
Diagnostics overview and FB for the XFEL bunch compressors
Fabrication of KEK-ATF2 Q-BPM
LCLS bunch length monitor utilizing coherent radiation
Linac/BC1 Commissioning P
Physics Design on Injector I
Undulator System Components Status Dean Walters
Undulator Line Design Liz Moog, Advanced Photon Source April 24, 2002
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
Breakout Sessions SC1/SC2 – Accelerator Physics
Undulator Cavity BPM System Status
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
Undulator Cavity BPM Status
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Breakout Session SC5 – Control Systems
Breakout Session SC1/SC2 – Accelerator System
Breakout Session SC3 – Undulator
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Undulator Section e- Diagnostics Glenn Decker, ANL / APS April 24, 2002 Overview Beam Position Monitoring Wire Scanners / Cherenkov Detectors Optical Transition Radiation Imaging LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Undulator Section Particle Beam Diagnostics Beam Position Monitors 48 Cherenkov Detectors 33 OTR foils 11 Wire Scanner Acuators 4 Current Monitors 2 LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Conceptual Design for Combined Button / Cavity BPM LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Principle of operation of BPM waveguide-cavity coupling Port to coax Dipole frequency: 11.424 GHz Dipole mode: TM11 Coupling to waveguide: magnetic Beam x-offset couples to “y” position Sensitivity: 1.6mV/nC/m (1.6109V/C/mm) Magnetic Field Lines Beam Direction Zenghai Li, S. Smith, R. Johnson, SLAC LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Waveguide-Coupled Cavity-Based BPM Model Dipole frequency: 11.424 GHz Dipole mode: TM11 Coupling to waveguide: radial magnetic Beam x-offset couples to “y” port Sensitivity: 1.6mV/nC/m Explicitly does not couple to TM01 Cavity height 3mm Guide height Guide R pos 7mm 8mm Pipe radius 6mm Qdipole 450 1050 WL amplitude 1.3E12 6 mm Zenghai Li, S. Smith, R. Johnson, SLAC LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Coupling scheme eliminates TM01 from output waveguide Dipole Frequency 11.4 GHz (Arb. Units) Fundamental Frequency 8.8 GHz LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Longitudinal Cavity Impedance WL(V/pC) Dipole Mode 0 3 6 9 12 15 18 21 24 Frequency (GHz) LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

LEUTL Capacitive Button Pickup Electrodes Electrical Specifications: Frequency: DC to 20 GHz Impedance: 50 ohm nominal, terminated by a capacitive button Capacitance: 4.8 pF nominal VSWR: 1.03:1 max. to 3 GHz, 1.15:1 to 20 GHz Insertion loss: 0.1 db max. to 3 GHz, 0.5 db max. to 20 GHz Matching: +/- 0.5 ohm in impedance, and +/- 0.1 pF in capacitance. Connector: SMA female ,hermetically sealed with glass insulator. Dielectric Strength: >1500 V at 50/60 Hz Leakage Resistance: > 1013 ohm, from center conductor to outer housing Mechanical Specifications: Diameter: 4 mm Materials: As per Kaman P/N 853881-001 Hermeticity: <10-11 cc He/sec Radiation: >200 megarads gamma 4 mm Dia. Drawing courtesy J. Hinkson ALS LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Button Pickup Electrode Mechanical Drawing LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Inexpensive Logarithmic Amplifiers for Button BPM Single Channel Four-Channel Unit with Test Ports Courtesy R. Lill, R. Keane, APS LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

BPM Summary Cavity BPM’s capable of sub-micron-scale resolution, reproducibility Prototype unit undergoing characterization at SLAC/NLC Capacitive button pickup electrodes are a mature technology, capable of providing 1 micron resolution / stability for hours / days “Belt and suspenders” approach assures highest quality beam alignment capability LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Cherenkov Detector (Upgrade from PEP-II Design) Courtesy W. Berg, APS LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Cherenkov Detector Electronics (APS Design) Courtesy A. Pietryla, APS LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Optical Transition Radiation A. Lumpkin, APS LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

OTR Radiation Pattern LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Optical Transition Radiation (cont’d) 11 Intra-undulator OTR Electron-Beam Profile Diagnostics are proposed Thin foils (1-5 microns thick) can be used to minimize e-beam scattering and bremsstrahlung radiation Conversion efficiency reasonable for ~ 1 nC of charge and CCD cameras OTR Techniques have been validated in a number of recent experiments: Beam sizes of 30 um (sigma) for a 600-MeV beam measured at APS with an Al mirror. (Lumpkin et al.,FEL’98) Beam sizes of 50 microns sigma for a 4-GeV beam at TJNAF with 0.8-micron thin foil (Denard etal, BIW ’94) Beam size measurements performed at 30 GeV at SLAC (Catravas etal, PAC ’99) Beam size of 15 microns rms measured at 30 GeV on a single shot at SLAC (Hogan, E-162) LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS

Conclusions Undulator particle beam diagnostics will build upon knowledge base at APS, SLAC and elsewhere. Majority of diagnostics require minimal development Important items are BPM fabrication / fiducialization and mechanical support. Beam-based alignment relaxes requirements considerably OTR foil survivability (rep rate limitation?) Decision on bpm electronics topologies – downconversion / phase detection with cavities vs dumb power monitor Log-amp, delta/sum, AM/PM etc. for button pickups LCLS DOE Review, April 24, 2002 Glenn Decker, ANL / APS