EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by

Slides:



Advertisements
Similar presentations
Hamid Dom Reg WS March 04 1 INTRODUCTION THE GATS and DOMESTIC REGULATION.
Advertisements

Transparency and Domestic Regulation Mina Mashayekhi Division on International Trade UNCTAD.
Singapore February 2001 Promoting Fair and Transparent Regulation in Securities Markets A Presentation to the APEC-OECD Co-operative Initiative on Regulatory.
North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
Guidelines for Good Third Party Access Practice For LNG System Operators (GGPLNG) Rocío Prieto ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May.
Regulatory Environment and Small-hydro Development Professor Priyantha D C Wijayatunga Public Utilities Commission of Sri Lanka and University of Moratuwa.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
SECONDARY SPECTRUM TRADING. OPPORTUNITIES AND DIFFICULTIES IN EU Ana Gónzalez David Rojo Claudio Feijóo Sergio Ramos Grupo de Tecnologías de la Información.
Rocío PRIETO – Comisión Nacional de Energía Benoît ESNAULT – Commission de Régulation de l’Energie LNG TF chairs 18th Madrid Forum Madrid, 27/28 September.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Compliance with IOSCO requirements AMEDA Leadership Forum Alexandria Egypt Monday 27 th April 2009 by Dr. Ashraf EL Sharkawy Senior Advisor to the CMA.
Implementation of EU Electronic Communication Directives.
General Principles for the Procurement of Goods and Services Asst. Prof. Muhammad Abu Sadah.
Principles of Local Governance: Covering local governmental legislations and compliance issues IMFO WOMEN IN LOCAL GOVERNMENT FINANCE CONFERENCE 07/02/13.
Revise Lecture 1 1. Framework of Financial Reporting 1. The regulatory system 2. A conceptual framework 2.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
BALANCING IN THE BALTIC REGION WG CONCLUSIONS Ingrid Arus Riga/ Baltic Mini-Fora meeting, 24 th of April 2009.
The industrial consumer’s view IFIEC EUROPE 1 GTE 2 nd Annual Conference September 2004 Copenhagen Barriers to competition in the view of a consumer.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
GTE ppt 1 Brussels, Henri Cattoor, Edigas Chairman GTE Interoperability, EASEE-gas and LNG.
ITCILO/ACTRAV COURSE A Capacity Building for Members of Youth Committees on the Youth Employment Crisis in Africa 26 to 30 August 2013 Macro Economic.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
13th March 2009, Bilbao GLE Workshop on LNG ERGEG MONITORING GGPLNG Rocío Prieto.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Gas Storage Investment - Traders’ Perspectives European Federation of Energy Traders Board Member and Gas Committee Chairman
Marek Stavinoha Legal officer DG MOVE A4 European Commission
Gas Regional Initiative South South-East
Views on the EC Draft LNG Paper
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Danube Water Conference, Vienna, May 2017
Session 2: Institutional arrangements for energy statistics
Harmonization of Cross Border Transmission Tariffs between
INTERCONNECTION GUIDELINES
Gas Transmission Europe
2009 TSO Transparency Gas Regional Initiative North-West
Background and Process
Achieving the Internal Gas Market The view of gas suppliers
Setting Actuarial Standards
CESEC Energy Community Project Monitoring
Investor protection and MIFID
GIE Annual Conference Bratislava, September 2006
Human Rights Due Diligence as a mechanism for prevention and enhancing access to justice Claudia Saller European Coalition for Corporate Justice Access.
Capacity Allocation Mechanisms
DRAFT DG TREN Staff Working Paper on LNG
Transparency & Services
XIIIth Madrid Forum (16th/17th October 2007)
Meinhard Janssen GIE Board Member
LNG Workshop Bilbao, March 13th 2009 GLE.
ERGEG comment to KEMA study on Art. 3 and 7
ERGEG’s reaction on DGTREN LNG study results and policy conclusions
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by Victor Tuñon, Chairman of LNG Task Force

Eurogas LNG group represents: Eurogas represents the most important LNG terminal users in Europe, operating in the seven countries where LNG is present 13 members from 8 countries Eurogas members imported 70% of the total EU27 LNG imports in 2008 Key objectives: Represent terminal users’ interests Ensure that the views of users are taken into account in all relevant policy making activities. Key Policy Principles Access rules should meet users’ interests, in respect of transparency, standardization of approval procedures, harmonization of operating procedures etc.

General Observations to GGPLNG The existing policy framework as presented in the 2003 Gas Directive has given favourable results for investments in LNG so far; Non discriminatory and transparency rules should apply across Europe. Before implementing harmonised standards at EU level it should be taken into account the different supply profiles across Europe (example: Spain & UK); Each Member States should be precise in defining the TPA access rules (test). It seems useful to have more precisions on allocation of primary capacity; Some rules might be applied to exempted terminals, like transparency rules, but for allocation of capacity, there are concerns if the Guidelines become regulation.

Application of CAM to past capacity bookings Guidelines should focus on the general principles for LNG facility access but be flexible enough to respect the various contractual arrangements in place and the circumstances of each Member State. Accordingly, the GGPLNG must recognize the role that global prices have on LNG market flows when designing primary and secondary capacity allocation mechanisms. It should allow Member States and LNG suppliers to develop mechanisms appropriate for the circumstances present in its market, provided these are non discriminatory and consistent with internal market legislation. The allocation of primary capacity should be subject to more detailed procedural rules to ensure that the chosen allocation methodology and implementation of such methodology is non-discriminatory.

Application of CAM to past capacity bookings The process needs to address models that require a certain percentage of firm primary capacity to be set aside for new entrants or short term services. Given the varied nature of individual Member States, the focus should be on development of standard and robust allocation procedures. The presence of a secondary capacity trading mechanism should not cause any negative impact on utilization of LNG terminal capacity. Optimal utilization will continue to be driven by global price signals and the use of DES transactions to access different markets around the world. If demand for capacity is much higher than the existing capacity, actions to develop new capacity should have the highest priority.

Anti-hoarding rules Need for National regulatory authorities to define “capacity hoarding” so that it can be applied across all Member States and be used for all gas assets. The definition of the utilization of capacity should take into account seasonal demand and the rump up of the new demand. It is difficult to strike a balance between the interests of primary capacity holders and promotion of secondary capacity trading if the two categories are given equal priority. NRAs must recognize that primary capacity holders have made financial commitments that have allowed the facilities to be built in the first instance.

Anti-hoarding rules The interests of primary capacity holders can be protected if they are fairly compensated for the market value of the surrendered capacity as well as any other reasonable costs and risks incurred (e.g., liability associated with the negligent use of the facility by a secondary shipper), 2) the details of the capacity hoarding mechanism are agreed by all parties, including the NRA, prior to finalization of the relevant commercial arrangements and 3) primary capacity holders are fully compensated for changes to the agreed mechanism imposed by NRAs after commercial agreements have been completed. Again, there is a danger that the interpretation of what constitutes “optimal” utilization could be inconsistent with the commercial realities of the global gas market.

Anti-hoarding rules The mechanism should not be unduly prescriptive by requiring an auction for allocation of secondary capacity if it is clear that OTC markets are sufficiently robust to achieve efficient use of capacity. The mechanism must address credit and liability issues associated with use by the secondary shipper, including the cost to the primary shipper of failing to deliver a cargo. The tariff charged to the primary capacity holder must reflect the diminution of flexibility caused by adoption of a secondary capacity mechanism. Secondary holders must be bound by the same rules designed to prevent capacity hoarding. The GGPLNG should require that the relevant NRA has the burden of proof to establish that the facility is not being used.

Other points to be considered The Gas directive does not impose obligations on system users, only on various system operators for the benefit of system users. Therefore it might be inappropriate for Regulation to impose such obligations for the users The desire to protect « small » LNG players should not impose cost or burdens on the LNG facility operator or primary capacity holder that are not fully compensated, it should neither create cross subsidies among players. GGPLNG should not address the issues of ship compatibility with terminals and vetting procedures, which are covered by international organizations Quality standards can not be set by each LSO, but the relevant authorities or specialized industry bodies

THANK YOU FOR YOUR ATTENTION !