PERT Program Evaluation and Review Technique

Slides:



Advertisements
Similar presentations
Chapter 9: Probabilistic Scheduling Models
Advertisements

Chapter 13 Project Scheduling: PERT/CPM
Project Management - Part 2
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Terminology Project: Combination of activities that have to be carried out in a certain order Activity: Anything that uses up time and resources CPM: „Critical.
Scheduling the Project
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
1 1 Slide © 2005 Thomson/South-Western Q 5 – 13 x 1 = the probability that Station A will take Sitcom Rerun x 2 = the probability that Station A will take.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
Example: Frank’s Fine Floats
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
In the name of Allah the Most Gracious the Most Merciful.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 3 part 2 Project Management.
LINE DIAGRAMS Learning objectives After this lecture you will be able to: Prepare and use line diagrams Demonstrate the effect that making activities ‘continuous’
EMGT 501 HW # Due Day: Sep 27.
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Project Scheduling Professor Stephen Lawrence Graduate School of Business Administration University of Colorado Boulder, CO
Prepared by: Michael Palazzo
MATHEMATICS 3 Operational Analysis Štefan Berežný Applied informatics Košice
Project Management Chapter 13 OPS 370. Projects Project Management Five Phases 1. Initiation 2. Planning 3. Execution 4. Control 5. Closure.
PERT Program Evaluation and Review Technique Tong Wang 511D ERB.
Project Management (專案管理)
Network techniques for Project Management
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
9-1 Chapter 9 Project Scheduling Chapter 9 Project Scheduling McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
© J. Christopher Beck Lecture 4: Program Evaluation and Review Technique (PERT)
Project Scheduling Software
PERT/Activity Diagrams, Completion Probability and the Z Score
Change management control Sources of Change  Project scope changes  Implementation of contingency plans  Improvement changes ISE Ch. 6 1.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Chapter 7 : Risk Management – part 2
Project Management Chapter 13 Sections 13.1, 13.2, and 13.3.
Project Crashing. c=6 e=9 b=6 a=7 f=8 g=5 d=4 Given the information below, what is the total additional cost to crash the project as much as possible?
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
COB 300C - The Operations Dimension Project Management.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Q1) A precedes C. B precedes D & E. C precedes F & G. D precedes G.
PERT/CPM F G A E H I J K D St T B C
COB 300C Project Management Dr. Michael Busing. PERT ANALYSIS Optimistic-Likely-Pessimistic Project Times If you hold someone to a certain number, they.
PERT CPM assumes duration of activity is known with certainty.
PERT/Activity Diagrams, Completion Probability and the Z Score
Project Management (專案管理)
Project Management Chapter Topics
PERT & GANTT CHARTS An Introduction.
Basic Project Scheduling
Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10th Edition. By Jay Heizer & Barry Render.
Project Planning & Scheduling
PROJECT MANAGEMENT WITH CPM/PERT.
Magister Sistem Infomasi Universitas Komputer Indonesia
Probabilistic Time Estimates
ENM448-Project Planning and Management
برنامه ريزي و كنترل پروژه
مدیریت عمومی دانش کهن. مدیریت عمومی دانش کهن ارایه تحقیق پایان ترم 3 نمره امتحان پایان ترم 10 نمره ارایه تکالیف کلاس 2 نمره امتحانات.
COB The Operations Dimension
3.1 Earliest Start Times.
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
Project Management Dr. Michael Busing
PERT/Activity Diagrams, Completion Probability and the Z Score
Managing Risk Chapter 7.
Presentation transcript:

PERT Program Evaluation and Review Technique SEEM 3530 Tutorial Sep.25 2013 27/4/2019 PERT Program Evaluation and Review Technique CEMIS INFS410L Mourad Henchiri

Completion Times (days) SEEM 3530 Tutorial Sep.25 2013 27/4/2019 PERT Example Consider a small project that involves the following activities.   Preceding Completion Times (days) Activity Optimistic Most Likely Pessimistic a - 5 6 7 b 4 18 c 15 20 d b,c 3 e 16

PERT Example (cont’d) (a) Determine the expected value and the variance of the completion time for each activity. (b) Use the expected times from (a) to find the critical path. (c) Assuming that the normal distribution applies, determine the probability that the critical path will take between 18 and 26 days to complete. (d) How much time must be allowed to achieve a 90% probability of timely completion? (e)By using modified probability of completion method, what is the probability that all paths will take before 18 weeks?

Exercise Solution (a) Activity Mean Variance a 6 4/36 b 7 196/36 c 14 256/36 d 4 e 14.5 169/36 END E 14.5 A6 C 14 D4 START B7

Questions?