GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July 2010 . 1 | Energy Networks Association.

Slides:



Advertisements
Similar presentations
PN UNC Workgroup (AQ topic)
Advertisements

PNUNC AMR3 Topic Workgroup 12 th May, Transporter response to actions.  AMR004: Transporters (CW) to provide supporting justification as to why,
Project Nexus (AMR) Workgroup – 7 th July 2010 Response to Transporter action.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
SPA Enquiry Process - Additional Requirements for AMR sites ICoSS Presentation.
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
DESC Action DE0301 & DE0302 (New Project Nexus Allocation Algorithm) 4th April 2012.
PN UNC Workgroup Supply Point Register 25 th October 2011.
Joel Martin 23 rd November 2010 MOD 329 – UNC Rules on setting SHQs / SOQs & the Network Referral Process.
Nexus Workgroup CSEP Transition Topic June
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Project Nexus Workgroup – Invoicing 11 th August 2014.
PN UNC Workgroup Settlement topic 4 th October 2011.
PN UNC Workgroup Read Validation 4 th October 2011.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
Connected System Exit Points Options for strategic regime change Chris Warner.
Project Nexus UNC Workstream Consolidation of High-Level Principles Fiona Cottam 19 May 2010.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
FGO: ASA Service Line Review
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Datalogger / DMV Modification Proposals - Summary
Transmission Workgroup 7th July 2011
Project Nexus Workgroup (Settlement)
Treatment of Daily Read sites
Modification Proposal 0192 – Draft Business Rules.
PAF Risk Register and PARR mapping
PN UNC Workgroup iGT Services
Connected System Exit Points Administration Options
Project Nexus Workgroup
Potential Nexus Topic: Universal Single Meter Point Supply Points
DSR Volumetrics Workgroup 3 10 September 2014.
Connected System Exit Points Administration Options
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Project Nexus Workgroup
PN UNC Workgroup iGT Services
Datalogger / DMV Modification Proposals - Summary
PN UNC Workgroup Settlement Overview
PN UNC AMR Topic Workgroup
Connected System Exit Points - Update
UNC Transmission Workstream 15th June 2005
PN UNC Workgroup (Settlement topic)
UK Link Replacement Programme additional supporting UNC modifications
Project Nexus Market Differentiation Formal Market Separation
PN UNC AMR Topic Workgroup
Nexus Workgroup Mod 0473 Presentation
PN UNC Workgroup iGT Services
Project Nexus Workgroup
Gas Customer Forum Project Nexus xoserve update (as of 19th July 2010) 26th July 2010 Final.
Overview of RbD Risk Modelling 31 March 2008
DN Interruption Phase II
UNC Modification Performance Assurance Framework Incentive Regime
Development Work Group 0209 Straw Man Update
Implementation Approach Distribution Workgroup – June 2014
Project Nexus Workgroup
Project Nexus Workgroup
Modification 440 Project Nexus iGT Single Service Provision
PN UNC Workgroup (AQ topic)
Presentation transcript:

GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July 2010 . 1 | Energy Networks Association

GT Action from 7th July 2010 AMR Workgroup Meeting What meter (asset & read) information do Transporters require Before the day On the day After the day For Settlement purposes Network Operation purposes 2 | Energy Networks Association

Approach GTs have reviewed the question on two levels UNC obligations Network Operations Following is a high level analysis Requires further analysis once regime is determined 3 | Energy Networks Association

Data Requirements to Satisfy UNC Obligations GTs require sufficient data to meet Code, licence & legislative obligations The current level of data set out in UNC is sufficient for balancing & settlement purposes Before the day On the day After the day Reconciliation and Billing The level of accuracy of the data determines the quality of the processes and the quality of the data held on the Supply Point Register Implementation of Smart meters in itself does not need to change these UNC obligations – but industry may desire change Data from Smart meters should improve the operation of these processes Industry desire to examine the merits of changing the ‘close out’ period? A balance is needed to ensure the accuracy & quality of the data 4 | Energy Networks Association

Network Operation Requirements General The current level of data set out in UNC is sufficient Again accuracy of the data is key Before the day Information held on the Supply Point Register (e.g. site ownership, asset data & load details) NExA related information (e.g. Offtake Profile Notices) On the day Within day consumption information from DM Mandatory sites Under review as part of DM unbundling After the day Receipt of certain data after the day for Network Planning Operations Consumption data for deriving AQ, SOQ & for Section H Demand Estimation & Forecasting 5 | Energy Networks Association

Requirements in a SMART World Difficult to pre-judge when it is still largely an ‘unknown’ Need to understand the quality & quantity of data required to optimise industry processes GT requirements will be dictated by the regime but as a minimum GTs will still require accurate data (for Network operation & UNC obligations), received in a timely fashion & in a controlled environment, for example Access to data held on the Supply Point Register for Operational purposes Energy for transportation invoices & settlement. Frequency to be determined during SMIP & Nexus Site level data for certain sites for day to day Network activities (daily/hourly site consumption data) (e.g. Emergencies and Interruption management) Meter asset data Data to derive site AQ, SOQ & SHQ (level depending on site), EUC (depending on regime) Data to share out ‘un-allocated energy’ Potential for increased reads for demand modelling processes 6 | Energy Networks Association