Presentation is loading. Please wait.

PN UNC AMR Topic Workgroup

Similar presentations


Presentation on theme: "PN UNC AMR Topic Workgroup"— Presentation transcript:

1 PN UNC AMR Topic Workgroup
Meter Reading Validation Information/Analysis Request

2 Background For future AMR sites which provide daily reads or a periodic read to the Transporters, the workgroup is considering standard validation rules carried out by the Shipper prior to submission. The checks include; Completeness check to ensure all readings expected are received (including converter readings) Tolerance check to ensure the consumption derived from the reading is within a specified tolerance for the AQ/SOQ band At the AMR 19 meeting it was suggested that analysis is performed by Shippers to test the tolerances on real life examples

3 Analysis Analysis required to support a suitable set of standard industry checks & tolerances on gas meter readings Shippers to test the ‘strawman’ tolerances to check if they are appropriate, and suggest alternatives if not The checks are the minimum required before submission to the Transporters Two sets of tolerances; Table 1: on receipt of daily reads Table 2: on receipt of periodic reads Tolerances are applied to the consumption derived from the meter reading Where the read fails the tolerance it is subject to further investigation

4 Table 1 - Tolerances for Daily Reads
Lower AQ Band (kWh) Upper AQ Band (kWh) Tolerance (consumption at Meter Point level) 73,199 Greater than 73,199 kWh 73,200 731,999 + or – 100% of AQ 732,000 5,859,999 5,860,000 29,299,999 + or – 100% of SOQ 29,300,000 57,599,999

5 Table 2 - Tolerances for Periodic Reads
Lower AQ Band (kWh) Upper AQ Band (kWh) Tolerance (Consumption at Meter Point level) 73,199 + or – 300% of AQ/365 x no. of days 73,200 731,999 + or – 250% of AQ/365 x no. of days 732,000 5,859,999 + or – 200% of AQ/365 x no. of days 5,860,000 29,299,999 + or – 150% of SOQ x no. of days 29,300,000 57,599,999 + or – 100% of SOQ x no. of days

6 Next Steps The next meeting of the Project Nexus AMR Workgroup will take place on May 4th, 2011 Shippers to provide alternative tolerances if the ‘strawman’ values are not workable We would like to conclude discussions on read validation at the meeting For more information please contact: or