Overview of Fermilab Accelerator Complex and Beam Lines T. Kobilarcik FNAL.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Chapter 7 EM Math Probability.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Math Expressions How does it all work together…?.
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
1 1  1 =.
1  1 =.
Addition Facts
5 th - Number Sense. 1. Which is the same as 13? A B. 10 × 3 C D. 1 × 3.
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Future Fermilab Flavor Physics Program
Booster Synchrotron Cavities: An Overview in the Context of PIP Mohamed Hassan, Timergali Khabiboulline, Vyacheslav Yakovlev 07/03/2013.
High pressure RF cavity project Katsuya Yonehara APC, Fermilab 2/28/11 - 3/4/111.
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Making Landmark or Friendly Numbers (Multiplication)
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
Cyclotron Refurbishing & Development Meeting March 6, 2008.
1 Project X Proton Driver David Neuffer September 2011.
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
Least Common Multiples and Greatest Common Factors
Addition 1’s to 20.
Particle Physics Chris Parkes Accelerators & Detectors
Test B, 100 Subtraction Facts
SNS Spallation Neutrino Source 1 SNS layout GeV proton linear accelerator Accumulator ring Main target Stripping foil.
Week 1.
Number bonds to 10,
Let’s take a 15 minute break Please be back on time.
We will resume in: 25 Minutes.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Partial Products. Category 1 1 x 3-digit problems.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
2013 Apr.30-May.03 Shuei EPICS Collaboration Meeting 2013 Spring 1 Acquisition of Long Waveform using Yokogawa SL1000 Shuei YAMADA KEK / J-PARC.
Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
MTest Facility Low Energy Beam Erik Ramberg AEM 15 October, 2007.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
Argonne Laser Test Stand and Fermilab Test Beam Facility Karen Byrum 8 March, 2007 Status of Argonne Laser Teststand (Joint ANL – UC program) Some first.
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Status and Future of Fermilab Test Beam Facility Erik Ramberg LCWS07 Performance of New Beamline Tracking, Cerenkov and TOF CALICE and MINERVA tests Potential.
MC_ Muon Beam Lines 8/3/06 Want a  beam of ~300MeV/c –This requires a  beam of ~300 MeV/c Possible Sources: SY Proton Beam line components removed.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Fermilab Test Beam Facility Aria Meyhoefer (soon to be Soha) May 10, 2010.
The Meson Test Beam Facility Erik Ramberg LRP Meeting – Oct. 30,2003 Delivering MI beam to MTBF User area layout Operational characteristics Detectors.
Asian Test Beam Facilities Satoru Uozumi Kyungpook National University Mar-29 th 2010 Beijing China IHEP Beijing TBF Russia.
Accelerator Operations and PIP Sergei Nagaitsev DOE OHEP briefing 6 March 2014.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
SY120 to the Meson Test Facility (and KTeV?) - Chuck Brown – 23Feb04 – June/08 P2 P1 MI52 MCenter MTest 3 km beam line from MI52 to MT6 and MC7 2.5 km.
Fermilab Test Beam Facility Aria Soha September 19, 2011.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
F ERMILAB T EST B EAM F ACILITY Aria Soha June 12, 2012.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
Status of FNAL accelerator complex Sergei Nagaitsev 47th Annual Fermilab Users Meeting 11 June 2014.
A summary of world-wide test beam facilities
Presentation transcript:

Overview of Fermilab Accelerator Complex and Beam Lines T. Kobilarcik FNAL

Fermilab Accelerators Linac Booster Main Injector Tevatron 2 Santa Fe Polarized Drell-Yan Workshop 2010

Linac 400 MeV protons. 15 – 50 s spill at 15 Hz. 35 mA. Currently transports beam to MTA hall. – Hall is 40 long, 21 wide, and 16 tall. – Probably need new facility. 3 Santa Fe Polarized Drell-Yan Workshop 2010

Booster 8 GeV protons 1.6 s spill at 15 Hz; 53 MHz structure. 5 x 10^12 protons per spill. Currently transports beam toward MiniBooNE experiment via Booster Neutrino Beamline. 4 Santa Fe Polarized Drell-Yan Workshop 2010

Tevatron Presently unable to deliver beam to fixed target experiments. Historically: – 800 GeV protons – 20 second slow spill at 60 seconds; 53 MHz structure. – 1 x 10^13 protons per spill. – Single turn extraction possible 5 Santa Fe Polarized Drell-Yan Workshop 2010

Main Injector 120 GeV protons. 10 s single turn extraction. 1 to 4 second slow spill. 53 MHz structure. 60 second repetition rate. Delivers beam to fixed target area. 6 Santa Fe Polarized Drell-Yan Workshop 2010

Fixed Target Area 7 Santa Fe Polarized Drell-Yan Workshop 2010

Fixed Target Area – NM Beamline Presently used for E906/SeaQuest. 5 x 10^12 protons per spill. 8 Santa Fe Polarized Drell-Yan Workshop 2010

Fixed Target Area – MT Beamline Presently serves the Meson Test Beam Facility. All rate are 100s of kHz. Primary Beam. – 120 GeV protons. Secondary Beam. – Pion Mode: GeV pions or 200 MeV pions. 9 Santa Fe Polarized Drell-Yan Workshop 2010

Fixed Target Area – MC Beamline Formerly housed the MIPP experiment May re-commission beamline in within the year. May be possible to target up to 2x10^12 protons per spill (once per minute) with shielding upgrade. Can house ~225 long beamline withing detector building. 10 Santa Fe Polarized Drell-Yan Workshop 2010