WIGOS regulatory and guidance material

Slides:



Advertisements
Similar presentations
WMO Standards and Technical Regulations (TR) D. Ivanov (Member of Secretariat TR Editorial Board; DRA-C/ROE) Reduced version (I. Zahumensky; WIGOS-PO)
Advertisements

WMO TR (WMO-No. 49) WMO; OBS, Wenjian Zhang and Miroslav Ondráš.
WMO WIGOS (WMO Integrated Global Observing System) Regulatory Material Information for CIMO TT-International Cloud Atlas, Nov 2013 Russell Stringer Chair,
World Meteorological Organization (WMO) Observing and Information Systems Department WMO Information System (WIS) WMO Prepared by Eliot Christian Senior.
WMO The WMO concept of standards and guidelines GCW CryoNet Team Meeting (Reykjavik, Iceland, January 2014) Dr M. Ondráš Chief, WMO Observing Systems.
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
World Meteorological Organization Working together in weather, climate and water RA VI Workshop on the Implementation of WIS Sofia, Bulgaria, 1 – 3 November.
World Meteorological Organization Working together in weather, climate and water WIGOS – WMO Foundation for Meeting the Observing needs of Weather, Climate,
Development and Implementation of the WIGOS Data Quality Monitoring System (WDQMS) Doc. 4.4 ICG-WIGOS Task Team on the Plan for the WIGOS Pre- operational.
WMO WIGOS Regulatory Material - WRM Report to ET-SBO-1, 9-12 July 2013 Russell Stringer Chair, Task Team on WIGOS Regulatory Material (TT-WRM) Co-chair,
WMO Moving from the WIGOS Framework towards the Pre-operational Phase A. Makarau President of RA I.
AWS relevant regulatory and non-regulatory material
WMO WIGOS Pre-operational Phase Regional & National Perspectives Tyrone W. SUTHERLAND (BCT, EC FP for WIGOS)
ICG-WIGOS-6 Report from the Commission for Basic Systems
Introduction to the WIGOS Identifiers
WIGOS Pre-operational Phase
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
GCOS Welcome and Update
WIGOS regulatory and guidance material
The Plan, Status and First Results
Concept Proposal for RA-III Regional WIGOS Centre
Regional WIGOS Centres
The CGMS Baseline in the WIGOS Regulatory Material
The Jakarta Declaration
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
WIGOS Data Quality Monitoring System (WDQMS)
5th Session of the Task Team on WIGOS Metadata
(Dakar, Senegal, 28 – 30 September 2016)
Regional Basic Observing Network Concept
The Plan, Status and First Results
Agenda 5.11 General Regulations
Establishment of Space Weather Information Service
Regional WIGOS Centres
WIGOS Pre-operational Phase
WIGOS Pre-operational Phase
Roadmap to Enhanced Technical Regulations of WMO
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
4.2(2) WIGOS Editorial Board (WEdB)
WIGOS implementation in RA II
WIGOS Pre-operational Phase in RA I (Africa)
Regional Basic Observing Network Concept
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
Overview of the WMO Integrated Global Observing System (WIGOS)
Dr Sue Barrell, Australia
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
Decisions on CBS activities to support WMO priority activities
REPORT on RWCs in RA VI Ivan Čačić President RA VI ICG-WIGOS-7
4.2 CLIMATE SERVICES, ACTION AND RESILIENCE
Approving Amendments to the Technical Regulations
Co-chair Introduction
Decisions and Recommendations for the
Approving Amendments to the Technical Regulations
Technical Coordinator - Data Buoy Cooperation Panel
Workshop (… 2016) WIGOS Project Office
Terms of Reference WWW, PWS, Space
WMO Information System
WMO RA-II WIGOS Workshop Workshop summary and recommendations
WIGOS Pre-Operational Phase;
Guidance on WIGOS Data Partnerships Draft v1.0
Regional WIGOS Centre Tokyo
WMO Technical Regulations relevant to Port Meteorological Officers
The WIGOS Pre-Operational Phase
WIGOS - Regional and National Implementation Planning
Cg-18 Special Sessions Topic 4; Infrastructure -
Approving Amendments to the Technical Regulations
The status and Plan in 2019 for the WIGOS centers in RA II
COLLABORATION AND ENGAGEMENT WITH CROSS-CUTTING WMO PRIORITIES; WIGOS MAIN OBSERVING COMPONENTS GLOBAL CRYOSPHERE WATCH 25 Jan 2019 Árni Snorrason Chair,
Inter-Commission Coordination Group On WIGOS
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Aeronautical Meteorological Personnel and the WMO Global Campus
Presentation transcript:

WIGOS regulatory and guidance material RA II WIGOS Workshop (Beijing, China, 6-8 November 2018) Presented by: Luis F. Nunes Based on slides by: Igor Zahumensky (WIGOS Project Office, WMO Secretariat)

Outline Introduction WIGOS Technical Regulations The Guide to WIGOS Final Remarks ARTICLE 9 Execution of Congress decisions (a) All Members shall do their utmost to implement the decisions of Congress; (b) If, however, any Member finds it impracticable to give effect to some requirement in a technical resolution adopted by Congress, such Member shall inform the Secretary-General of the Organization whether its inability to give effect to it is provisional or final, and state its reasons therefor.

Outline Introduction WIGOS Technical Regulations The Guide to WIGOS Final Remarks ARTICLE 9 Execution of Congress decisions (a) All Members shall do their utmost to implement the decisions of Congress; (b) If, however, any Member finds it impracticable to give effect to some requirement in a technical resolution adopted by Congress, such Member shall inform the Secretary-General of the Organization whether its inability to give effect to it is provisional or final, and state its reasons therefor.

WMO Technical Regulations and Guides TRs (Vol. I – III) Manuals (Annexes to TRs) Guides (e.g. WMO-No. 8, 100, 134, 168, …; Guidelines, other reference docs., etc.) Regulations Basic “high level” Provisions Mostly requirements-driven Relatively Conservative “Shall” and “Should” have specific meaning More detailed Provisions Mostly technology-driven Relatively Dynamic Non-Regulations “Should” has ordinary meaning Best procedures and practices, implementation guidance, explanations, examples on how to implement and operate observing systems

Technical Regulations (WMO-No. 49) Vol Technical Regulations (WMO-No. 49) Vol. I General Standards and Recommended Practices PART I. WMO Integrated Global Observing System (WIGOS) – Date of effect: 1 July 2016 PART II. WMO Information System (WIS) PART III. Data Processing and Forecasting PART IV. Meteorological, hydrological and climatological applications and services PART V. Education and training PART VI. Competence of meteorological, hydrological and climatological personnel ARTICLE 9 Execution of Congress decisions (a) All Members shall do their utmost to implement the decisions of Congress; (b) If, however, any Member finds it impracticable to give effect to some requirement in a technical resolution adopted by Congress, such Member shall inform the Secretary-General of the Organization whether its inability to give effect to it is provisional or final, and state its reasons therefor.

Technical Regulations WMO-No. 49 (Standards and Recommendations) The standard practices and procedures: It is necessary that Members follow or implement; Are distinguished by the use of the term shall in the English text and by suitable equivalent terms in the other WMO language versions. ARTICLE 9 Execution of Congress decisions (a) All Members shall do their utmost to implement the decisions of Congress; (b) If, however, any Member finds it impracticable to give effect to some requirement in a technical resolution adopted by Congress, such Member shall inform the Secretary-General of the Organization whether its inability to give effect to it is provisional or final, and state its reasons therefor.

Technical Regulations WMO-No. 49 (Standards and Recommendations) The recommended practices and procedures: It is desirable that Members follow or implement; Are distinguished by the use of the term should in the English text and by suitable equivalent terms in the other WMO language versions. ARTICLE 9 Execution of Congress decisions (a) All Members shall do their utmost to implement the decisions of Congress; (b) If, however, any Member finds it impracticable to give effect to some requirement in a technical resolution adopted by Congress, such Member shall inform the Secretary-General of the Organization whether its inability to give effect to it is provisional or final, and state its reasons therefor.

Examples of provisions in the WIGOS Technical Regulations 2.2.1.2 Members shall plan and operate their networks in a sustainable and reliable manner utilizing WIGOS standard and recommended practices and procedures, and tools. 2.2.2.1.1 Members should follow the principles specified in Appendix 2.1 when designing and developing their observing networks.

Outline Introduction WIGOS Technical Regulations The Guide to WIGOS Final Remarks ARTICLE 9 Execution of Congress decisions (a) All Members shall do their utmost to implement the decisions of Congress; (b) If, however, any Member finds it impracticable to give effect to some requirement in a technical resolution adopted by Congress, such Member shall inform the Secretary-General of the Organization whether its inability to give effect to it is provisional or final, and state its reasons therefor.

WIGOS Technical Regulations and Manual Technical Regulations Manual on WIGOS Vol. I, Part I – WIGOS

Purpose and Scope of WIGOS Technical Regulations Vol. I, Part I – WIGOS It specifies WIGOS institutional and system requirements/standards and recommendations Manual on WIGOS It specifies WIGOS technical requirements/standards and recommendations of an operational nature

Purpose and Scope (Cont.) of WIGOS Technical Regulations For: Establishment of global, regional and national networks and facilities; Establishment of an authority or a responsible body; Human resources requirements (including education and training, competences, qualifications, etc.);

Chapters of WIGOS Technical Regulations Vol Chapters of WIGOS Technical Regulations Vol. I, Part I – WIGOS & Manual on WIGOS Introduction to WIGOS Common attributes of WIGOS component systems Attributes specific to the surface-based sub-system Attributes specific to the space-based sub-system Attributes specific to the global observing system of WWW Attributes specific to the observing component of GAW Attributes specific to the WMO Hydrological Observing System Attributes specific to the observing component of GCW

New draft Edition of WIGOS Technical Regulations This draft new edition is a result of a collaborative effort involving many experts, national focal points and the Secretariat Staff, and marks a very important milestone on our way toward the WIGOS operational phase. Manual on WIGOS – to be updated in 2019 with new chapter on: Global Basic Observing Network (GBON), Regional Basic Observing Network (RBON), The Global Observing System (GOS) (Manual on the GOS, WMO-No. 544 being integrated into the Manual on WIGOS)

Outline Introduction WIGOS Technical Regulations The Guide to WIGOS Final Remarks ARTICLE 9 Execution of Congress decisions (a) All Members shall do their utmost to implement the decisions of Congress; (b) If, however, any Member finds it impracticable to give effect to some requirement in a technical resolution adopted by Congress, such Member shall inform the Secretary-General of the Organization whether its inability to give effect to it is provisional or final, and state its reasons therefor.

Guide to WIGOS (WMO-No. 1165) It provides more detailed information, best practices and procedures, explanation and examples on how to implement standard and recommended practices and procedures specified in the Volume I, Part I – WIGOS of the WMO Technical Regulations (WMO-No. 49) and in the Manual on WIGOS into day-to-day operations. It is intended to be used by managers/supervisors and other technical staff of NMHSs responsible for planning, implementation, performance and operation of national observing systems/networks. These individuals are the target audience. WMO

Guide to WIGOS (WMO-No. 1165) – Cont. Initial version of the Guide to WIGOS (2017 edition) with guidance material on: WIGOS Station Identifiers (WSI), WIGOS Metadata, OSCAR/Surface, Observing Network Design principles

Guide to WIGOS (WMO-No. 1165) – Cont. 2017 edition, updated in 2018 (approved by EC-70): New Chapter 6: Guidance on National WIGOS Implementation New Chapter 7:  Guidance on WIGOS Data Partnerships - Part 1 New Chapter 8:  Establishing a Regional WIGOS Centre in pilot mode New Chapter 9:  Technical Guidelines for Regional WIGOS Centres (RWCs) on the WIGOS Data Quality Monitoring System (WDQMS) for surface land stations of the GOS

Outline Introduction WIGOS Technical Regulations The Guide to WIGOS Final Remarks ARTICLE 9 Execution of Congress decisions (a) All Members shall do their utmost to implement the decisions of Congress; (b) If, however, any Member finds it impracticable to give effect to some requirement in a technical resolution adopted by Congress, such Member shall inform the Secretary-General of the Organization whether its inability to give effect to it is provisional or final, and state its reasons therefor.

WHAT TO DO (“Shall” and “Should”) WMO Technical Regulations (WMO-No. 49) TRs (Vol. I – III) Manuals (Annexes to TRs) Guides (e.g. WMO-No. 8, 100, 134, 168, …; Guidelines, other reference docs., etc.) Regulations WHAT TO DO (“Shall” and “Should”) Non-Regulations HOW TO DO

New draft Edition of WIGOS Technical Regulations The Volume I, Part I is already available on the WIGOS page www.wmo.int/pages/prog/www/wigos/WRM.html The Manual on WIGOS will also be available soon at the same webpage. The official letter by the Secretary General to all Permanent Representatives (PRs) of Members with WMO will be distributed by the end of November. A review period will extend over two months (December 2018 and January 2019).

New draft Edition of WIGOS Technical Regulations The draft amendments are accessible from the following table: (updated on 1 October 2018) WMO-No. 49, Volume I, Part I - WIGOS English French Arabic Chinese Russian Spanish Manual on WIGOS (WMO-No.1160) WIGOS Metadata Standard (WMO-No.1192)

Thank you 谢谢 www.wmo.int/wigos