Standard Local Operating Procedures for Endangered Species: SLOPES-IV Greg Apke, ODOT Aquatics Biology and Fish Passage Program Leader (Salem Headquarters)

Slides:



Advertisements
Similar presentations
Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Advertisements

Lolo Creek Watershed Project #
Westland-Ramos Fish Passage and Habitat Restoration Project BPA Project No September 23, 2004 Westland Irrigation District.
Implement Actions to Reduce Water Temperatures in the Teanaway Basin BPA FY 2002 Columbia Plateau Province Proposal Project ID #
Gravel Push-up Dam Removal, Lower North Fork John Day BPA Project A Cooperative Project of: The North Fork John Day Watershed Council & The.
Managing Environmental Compliance for ODOT’s OTIA III State Bridge Delivery Program: Many Regulations – One Framework Michelle Eraut Environmental Program.
ENVIRONMENTAL AWARENESS
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Update on FHWA/FTA Proposed Rulemaking. MAP-21 Requirements Section 1318(a)(3) o Solicit requests from state DOTs, transit authorities, and MPOs, for.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
NYS Department of Environmental Conservation Fish, Wildlife & Marine Resources Amendments to Part 182: Endangered Species Regulations.
Beyond Fish and the Federal ESA Chris Maguire Terrestrial Biology Program Coordinator Oregon Department of Transportation Local Government Environmental.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Aid Highway Programmatic.
NYS Department of Environmental Conservation Fish, Wildlife & Marine Resources Briefing on Proposed Amendments to Endangered Species Regulations.
NMFS BiOp on FEMA’s National Flood Insurance Program (NFIP) DeeAnn Kirkpatrick January 22, 2009.
May 17 th,  Overview of endangered species regulations  Purpose of Habitat Conservation Plans  Review Balcones Canyonlands Conservation Plan.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Contract Specifications Background on.
Pine Valley Country Club Stream Restoration: Phase 2 Proposal Presented March 17, 2003 Greg Jennings, NC State Univ Barbara Doll, NC Sea Grant Dave Bidelspach,
Wetlands and Waterways Permits Patti Caswell Statewide Wetlands/Permits Program Coordinator Geo-Environmental, ODOT.
MNR’s Role February 6 th, 2014 Presented by Kerry Reed, Species at Risk Biologist 1.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Implementation of the Biological Opinion for Russian River Water Supply, Flood Control Operations & Channel Maintenance National Marine Fisheries Service.
Endangered Species Act
BIOLOGICAL RESOURCES Ken Cannon ODOT Aquatic Biology and Fish Passage Program Coordinator.
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
Introduction to Construction General Permit Inspections.
Modern Urbanized Stream Water Quality Improvement Technologies Creating a Net Zero Water Quality Impact Solution in the Natural Environment.
Mouth of the Columbia River Jetties Major Rehabilitation.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Bank Stabilization Streambank or channel.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Blue Book Roll Out Revised Expectations Expectations: NOAA Fisheries “ODOT has spent significant effort updating the Guide and making modifications.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Highway Aid Programmatic.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Endangered Species Act Counterpart Regulations for National Fire Plan Projects Bureau of Land Management Forest Service June 9, 2004.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
The Endangered Species Act Everything you wanted to know and more.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
Wetlands and Waterways Permits Ken Franklin Statewide Permits Program Coordinator Geo-Environmental, ODOT.
Terrestrial Biology & Beyond… Chris Maguire Terrestrial Biology Program Coordinator Oregon Department of Transportation Local Government Environmental.
Importance of the Lower Wenatchee River in Salmon Recovery* The Lower Wenatchee is a critical migration corridor for all ESA listed species Of the total.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
NOAA RESTORATION CENTER The NOAA RC seeks to make the process of regulatory review and permitting of environmentally beneficial habitat restoration projects.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
THE ENDANGERED SPECIES ACT & THE FLORIDA BEACHES HABITAT CONSERVATION PLAN.
Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
NOAA’s National Marine Fisheries Service Biological Opinion for Water Supply, Flood Control Operations & Channel Maintenance by the Army Corps, SCWA, and.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Esteban Quiles Earth and Physical Science Department Western Oregon University Monmouth, Oregon
GDEM Training June 2009 Emergency Watershed Protection (EWP) Program United States Department of Agriculture Natural Resources Conservation Service.
National Flood Insurance Program ESA Consultation for Online Information Sessions May 11 th and 12 th 2016 Oregon.
California Department of Fish and Wildlife Wolf Plan Status DRAFT Gray Wolf Conservation Plan December 2015 Karen Kovacs Wildlife Program Manager Northern.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
Environmental Compliance & Bridge Maintenance
2016 FHWA National Hydraulic Engineers Conference
2015 FAHP Annual Meeting For Oregon’s Programmatic Endangered Species Act Consultation on the Federal-Aid Highway Program March 15, 2016.
Construction Management & Inspection
Leveraging Funding from Other Sources: a Programmatic Approach
Presentation transcript:

Standard Local Operating Procedures for Endangered Species: SLOPES-IV Greg Apke, ODOT Aquatics Biology and Fish Passage Program Leader (Salem Headquarters)

Topics I Will Discuss Include: General ESA Overview Exposure to a few Streamlining Tools for ESA 1.SLOPES IV: Restoration Module 2.SLOPES IV: Transportation Module ODOT Training ESA Training Opportunities Questions & Answers

Endangered Species Act (ESA) General Overview or Crash Course in ESA

Mandate of the Federal Endangered Species Act (ESA) The federal ESA of 1973 requires federal agencies or their representatives to insure that their actions are not likely to jeopardize the continued existence of endangered or threatened species or result in the destruction or adverse modification of critical habitat of such species.

Federal Nexus Triggers ESA Sec 7 Federal Funds ($ FHWA) Federal Property (USDA, BLM, etc.) Federal Permit (Corps) Section 7 requires consultation with either National Marine Fisheries Service (NMFS) or US Fish and Wildlife Service (USFWS) (ODOT is FHWAs non-federal representative) Consultation is Required Before a Project is Authorized

Take is Prohibited by the ESA and Requires a Permit if it is Expected to OccurTake is Prohibited by the ESA and Requires a Permit if it is Expected to Occur Take = harm, harass, pursue, hunt, shoot, wound, kill, trap, capture, or collect Harm = significant habitat modification or degradation that results in death or injury Harass = significantly disrupts normal behavior patterns including breeding, feeding or sheltering

The ESA permit is analogous to a fishing license, you must have it to be legal. The ESA permit is analogous to a fishing license, you must have it to be legal. Any form of take is illegal without a license or permit.Any form of take is illegal without a license or permit.

Number of Corps Permits Issued Within the Action Area by Geographic Domains with Endangered Species GEOGRAPHIC DOMAIN ESUs AFFECTED2001 (n = 143 ) 2002 (n = 170 ) 2003 (n= 254 ) Willamette/Lower Columbia LCR Chinook, UWR Chinook, CR chum, LCR steelhead, UWR steelhead Interior ColumbiaSR fall-run Chinook, SR spring/ summer-run Chinook, UCR spring- run Chinook, SR sockeye, UCR steelhead, SR Basin steelhead, MCR steelhead Oregon CoastOC coho Southern Oregon/ Northern California Coasts SONC coho171141

SLOPES IV Programmatic Biological Opinion (PBO) Permitting of Maintenance and Improvements of Roads, Culverts, Bridges, and Utility Lines, within the Corps. Authority (Section 10, Rivers & Harbors Act 1899 and Section 404 of Clean Water Act) = NMFSCorps. =

SLOPES = S tandard L ocal O perating P rocedures for E ndangered S pecies

Concept of Programmatic Permits Streamline permitting and ESA consultation process for projects that are: Relatively Minor in impacts Repetitive in usage Impacts are Predictable Up front permit Statewide authorization for 5-years Only for species regulated by NMFS (anadromous salmonid species)

Permit Incentives Design constraints are known up front during project development Nominal risk –Permit terms & conditions are known Notification process is quick Cost and time savings Monitoring & reporting expectations are know upfront (budget & schedule) ESA take is permitted & legal Statewide applications & coverage 1-stop shop

Questions at This Point?

Restoration Boulder Placement Piling Removal Fish Passage Restoration Set-Back (Dikes, Berms, Levees) Spawning Gravel Restoration Streambank Restoration Large Wood Restoration Water Control Structure Removal Habitat Restoration SLOPES IV - RESTORATION MODULE Permit Issued February 22, 2008

SLOPES IV –TRANSPORTATION MODULE Transportation Module Major Hazard Response Streambank & Channel Stabilization Maintenance Rehabilitation Replacement Utility Line Stream Crossing To be complete June 08

Design Criteria of Actions 1.Major Hazards 2.Streambank & Channel Stabilization 3.Maintenance, Rehabilitation and Replacement 4.Utility Line Stream Crossing

Types of Actions Authorized 1.Major Hazard Responses –Immediate repairs of roads, culverts, bridges, or utility lines when major hazards are declared by manger of transportation infrastructure –Must notify Corps. & NMFS as soon as possible

2. Streambank & Channel Stabilization These actions include installation & maintenance of: –Scour protection necessary to prevent scour or down cutting of culverts, road foundations, or bridge supports using: Log or roughened rock toe of slopes Partially spanning porous weirs Woody plantings & herbaceous cover Soil reinforcements, coir logs Bank reshaping and slope grading Floodplain roughness Engineered log jams

3. Maintenance, Rehabilitation & Replacement These actions include maint., rehab. & replacement necessary to ensure roads, culverts, and bridges remain safe & reliable: –Geotechnical surveys-drilling –Excavation, grading & filling necessary to maintain, rehab. or replace existing roads, culverts & bridges –Construct & maintain stormwater facilities

4. Utility Line Stream Crossings Design in the following priority: –Aerial lines –Directional drilling, boring, jacking –Trenching in the dry Trenching must be backfilled below OHW w/ native materials & capped with clean river gravel Large wood displaced must be returned to original location

Processing of New Actions Species presence: Corps. will confirm is actions are within range of ESA salmon Corps. & NMFS will review each application Electronic notification and project tracking system 30-day approval process by NMFS & Corps.

Site access Project completion report w/in 60 days post-construction Work completed during in-water work window(s) In-water work must be isolated Stormwater management plan –Must meet stormwater pollution reduction & flow control requirements –Any new impervious surface or create a new stormwater discharge Components/Conditions of Permit

Conditions of Permit cont… Fish passage must be provided Capture & release of fish (fishery biologist) Water diversions (pumps) must be screened Erosion & pollution control plans must be developed and implemented

Vehicle staging and use: –Equipment storage, fueling, staging – 150 ft from stream –Daily inspections for fluid leaks –Steam cleaning prior to work below OHW Site restoration activities –Native material(s) stockpile for re-use (large wood, vegetation, topsoil, channel material, etc.) No treated wood use below OHW –Except when coated with waterproof seal or barrier Conditions of Permit cont…

Site Restoration Action Plan Components Any action that results in significant disturbance to riparian vegetation, soils, streambanks, or stream channel must: –Develop a plan to clean up site and restore those features post-construction –Soil stability –Native vegetation (replanting plan) noxious species are prohibited –Streambanks are stable & well vegetated –Electronic submittal of plan

Compensatory Mitigation Action Plan Components Actions that require a compensatory mitigation plan include: –Stormwater management facility that requires new or enlarged structure w/in riparian zone or has insufficient capacity to infiltrate and retain stormwater volumes –Riprap revetments extending above streambank toe, beyond previous footprint, or does not include vegetation & large wood –Bridge rehab. or replacements that do not span functional floodplain or cause net increase in fill w/in functional floodplain

Exclusions of SLOPES IV Baffled culverts or fishways (roughened channels) Culverts exceeding 6% grade Tidegate maintenance or replacements Stream barbs, non-porous partially or full spanning weirs Instream flow control structures Significant channel realignment Construction of new roads w/in riparian zones Construction of new bridge where a previous structure did not previously exist Construction of new or larger gas, water, or sewer line to support new or expanded service area(s) Noxious vegetative species

Who Do You Contact With Questions? ODOT Headquarters Staff ODOT Region Technical Center Staff (Biologists or Region Environmental Coordinators) Environmental Consultants NMFS or Corps. Or you can attend ODOTs Training June 3 & 4, 08

ODOTs BA Qualification Training June 3 & 4, 2008 in Salem 2-Day Training & Test Must Be Qualified to Write or Review BAs for ODOT Under Contract Must Maintain Qualification and Renew Every 3-Years To Register: Lorrie Schaefer at By

Greg Apke Questions?