REPAIR OF FLOATING CONCRETE PANTOONS AND CATHODIC PROTECTION OF MOORINGS, BODRUM (KARADA) MARINA TURKEY.

Slides:



Advertisements
Similar presentations
NGfL CYMRU GCaD FLOOR COVERINGS.
Advertisements

Materials Used in Civil Engineering.
Finishing Poured Concrete Surfaces
Portland Cement Fine power made from limestone. Used to make concrete and mortar. Commonly sold in 94 lb. bags (1 cubic foot).
What solutions do we provide?. Our Range of Solutions Epoxy & Polyurethane Coatings Polyurea Coatings Concrete Repairs Abrasive & Decorative Blasting.
BACKGROUND CONSTRUCTION OF THIS JETTY COMPLETED IN 1979.
CONREPNET A project 50% funded by the EU Partners: BRE, UK Gifford, UK CT Koulutos, Finland Freyssinet, France BBRI, Belgium IETcc, Spain STU-K, Czech.
Above Ground Storage Tanks &
Polymer Floor & Wall Coatings: Selection, Preparation, Installation and Troubleshooting.
AutoAid Technologies Sdn. Bhd. Presents. Product Presentation.
The AlphaGen A-1 Fire Wrap. The A-1 Fire Wrap When the fires hit, more than one pole is usually destroyed The cost of replacement of an average wooden.
Corrosion Control. ™ Drylar™ * Daclar™ * Vezlar™ * Zavlar™ * Voxlar™ * Nular ™
1 Hose and Lines. 2 High side / low side System with an expansion valve High SideLow Side Condenser Evaporator Receiver/Drier Compressor Expansion valve.
Technical Program: Tanks, Tanks and More Tanks “STEEL WATER STORAGE TANK MAINTENANCE” Maine Water Utilities Association Conference No. 490-April 12, 2007.
 Complete failure of the roof membrane, as stated by GAF consultant from Trinity ERD  Elastomeric roof material did not completely adhere.
Producing Plaster Components
CONTROL OF CORROSION ON UNDERWATER PILES
Spray Painting. Primer Paint A primer is a preparatory coating put on materials before painting. Priming ensures better adhesion of paint to the surface,
Coatings – Directional Boring Tim Jenkins. Coatings – Directional Boring Design Considerations (data collection) Design Considerations (data collection)
CONCRETE PROTECTION MATERIALS & TECHNIQUES CE 402 DONE BY AHMED AL-HAWAS FAYEZ AL-SAIKHAN.
The Solution to Prevent Premature Balding!
Cost Effective Reliability Solutions Ceramic and Metallic Entrained Epoxy Coatings Representative Name:
Bridge Maintenance and Repair.
FRP Reinforcement of Concrete
New Mexico FFA Agricultural Mechanics Career Development Event Concrete and Masonry.
Concrete Construction
Fiber-Reinforced Polymer (FRP)
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
Cracks in Concrete. 2-Classifications 2-Classifications 3-Concrete removal, preparation 4-References Cracks in Concrete 1-lntroduction.
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
Plastic Shrinkage Cracking Evaluation and Repair.
Presented by: Peter Emmons,
Introduction to a pit installation
34 th Annual Airports Conference Hershey, PA Preservation of Airport Infrastructure: Using Correct Tools to Save Costs Siva Venugopalan Principal Engineer.
Chilmark Menemsha Harbor Phase 3. Menemsha Boathouse Fire July 2010.
I N D U S T R I A L P R O D U C T S A N D S E R V I C E S ARC Commercial Water The Need for Coatings in Commercial Water.
The Use of Zinc Anodes to Extend the Life of Concrete Patch Repair Jack Bennett J.E. Bennett Consultants, Inc.
Concrete Countertops. Cast in place Pre – Cast Overlay.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for Surface Preparation.
Agricultural Mechanics Career Development Event Concrete and Masonry
Carbon-Ply Kit and Installation Validation of the Anomaly.
Silica Fume Inspection
Put an end to corrosion & water ingress by self-healing fully amorphous visco- elastic technological systems Solution for Risers.
Repair and Strengthening of Concrete Bridges and other Structures
Impressed Current Zebra Cassette CorroDiscSurface Embedded Sacrificial Anode ZLA Roll Anode GSC Super Anode Clip On Anode Monitoring and Control Camur.
An Introduction to Cathodic Protection. The Problem Water and de-icing salts along the splash zone of the abutment walls to this roadbridge have caused.
2016 SUBSTRATE PREPARATIONS. SUBSTRATE PREPARATION METHODS FOR CONCRETE Very Course Profile Scabbling – Suitable for very aged, weak or contaminated substrates.
5. FERROCEMENT.
Alterna Tile Replacement
Concrete Bridge Decks Large Percentage of All Bridge Decks (over 90%)
Batteries as Integral Part of Equipment
Introduction to Bridge INspection
CONCRETE PROTECTION MATERIALS & TECHNIQUES
Corrosion Control.
Concrete Surface Repair Technician
JACKETING Er. SHAIKH ARSHAD VJTI MTECH CM. INTRODUCTION It is a part of retrofitting i.e. repair, renovation, strengthening. Retrofitting is the modification.

Cast in Place 2 way Flat slabs Basically joists in both directions
Most Effective Method to Select the Fence For your Home
Symptoms of a Failing Steering Stabilizer Stop
Batching, Mixing, and Handling
Definition of Corrosion
Standards, Best Practice Guidances and Thresholds
Corrosion Control Must be addressed at the design stage
INNOVATIVE TECHNIQUES AND MATERIALS FOR PREVENTING CONCRETE SHRINKAGE CRACKING - Cleary, Lomboy, and Zhu Concrete shrinks due to reduction and movement.
Application Issues & Solutions
Компания Reichle & De-Massari (R&M)
Presentation transcript:

REPAIR OF FLOATING CONCRETE PANTOONS AND CATHODIC PROTECTION OF MOORINGS, BODRUM (KARADA) MARINA TURKEY

EKONS SCOPE OF THE PROJECT REPAIR AND PROTECTION OF 42 FLOATING CONCRETE PANTOONS REPLACEMENT OF ALL MOORING AND BUOY CHAINS REPLACEMENT OF SERVICE BOXES AND FENDERS CATHODIC PROTECTION OF ALL MOORING CHAINS SURVEY REVEALED THAT PREMATURE FAILURE OCCURED DUE TO INEFFECTIVE CONCRETE COVER AND CORROSION OF STEEL REINFORCEMENT

REPAIR METHODOLOGY DAMAGED CONCRETE WAS COMPLETELY REMOVED, MESH REINFORCEMENT REPLACED READY MIX TWO COMPONENT LATEX MODUFIED FIBER REINFORCED FLEXIBLE CONCRETE WAS THEN UTILIZED AS REPLACEMENT CONCRETE. REINFORCEMENT PROTECTED BY POLYMER RICH SLURRY REPAIRED PANTOONS SEALED OFF WITH AN IMPREGNATING AGENT DECKS WERE TREATED WITH WATER PERMEABLE EPOXY COATING WITH ROUGH FINISH

GENERAL VIEW PRIOR TOREPAIRS GENERAL VIEW PRIOR TO REPAIRS

CONDITION OF MOORING LINKS PRIOR TO REPAIRS

CORROSION DAMAGE ON INCLINED SURFACE OF PANTOONS

CORROSION DAMAGE OF PANTOONS

FAILURE OF PREVIOUS REPAIRS CARRIED OUT BY THE OTHERS

TELESCOPIC WORKING TENT OPEN POSITION

HANDLING OF PANTOONS

VIBRATING HAND HELD TROWEL IN PLACEMENT OF FLEXIBLE REPLACEMENT CONCRETE SURFACE FINISH OF THE PANTOONS

REPAIRED PANTOON READY TO BE INSTALLED IN POSITION

SERVICE DUCTING REPAIRED DECK WOOD FENDER

REPLACED RING & CONNECTOR

REPLACED CHAINS (IMMERSED PARTS CATHODICALLY PROTECTED (NOT SHOWN HERE) )

REPAIRED, PROTECTED, PLACED IN POSITION PANTOONS