The Nine Elements that Must Be Included in a 319 Watershed Based Plan

Slides:



Advertisements
Similar presentations
1 NPS MANAGEMENT PLANNING FOR THE NORTH CANDADIAN RIVER (from Canton dam through Lake Overholser)
Advertisements

What are they and why are they important? Presented by: Andrew Craig and Chad Cook DNR Nonpoint Source Planning Coordinator and UWEX WI Land and Water.
Overview of TMDL Plans TMDL Plan Workshop April 24, 2015 Karl Berger, COG staff Outline: Details Schedule Plan Elements Issues 1.
Carin Bisland, EPA Management Board Presentation 5/9/12.
IDEM TMDL 101 Everything you wanted to know about Total Maximum Daily Loads.
Current Planning for 2017 Mid-Point Assessment Gary Shenk COG 10/4/2012 presentation credit to Katherine Antos and the WQGIT ad hoc planning team.
Montana’s 2007 Nonpoint Source Management Plan Robert Ray MT Dept Environmental Quality.
CWA §319 Grants General Conditions Grant Types Grant Format Timelines The Awards Reporting Note: § 319 monies are reimbursable grants.
Chesapeake Bay Restoration An EPA Perspective Jeff Corbin Senior Advisor to the Administrator U.S. EPA.
Role of Governments in Addressing the Water Quality Impacts of Agriculture.
Incorporating the 9-Elements into a WMP Lindsey PhillipsMike Archer Source Water CoordinatorState Lakes Coordinator (402) (402)
Components of every Good Watershed Management Plan NDEQ – Planning Unit August 6 th, 2014 NDEQ – Planning Unit gust 6 th 2014.
EPA Region 6 Dallas, Texas EPA Region 6 Dallas, Texas.
April 22, 2005Chester Creek Watershed TMDL Total Maximum Daily Load Chester Creek University Lake & Westchester Lagoon Alaska Department of Environmental.
Watershed-Based Planning A Framework for Action!.
Watershed Planning Tools and an Integrated Watershed Approach Stuart Lehman U.S. EPA NPS Control Branch January 19, 2007 Bordentown, NJ.
EPA’S WATERSHED PLANNING APPROACH FOR THE SECTION 319 PROGRAM Dov Weitman Chief, Nonpoint Source Control Branch October.
Allen Berthold Texas Water Resources Institute. Review: Clean Water Act Goal of CWA is to restore and maintain water quality suitable for the “protection.
Approaches to Addressing Bacteria Impairments Kevin Wagner Texas Water Resources Institute.
Bill Carter Nonpoint Source Program Texas Commission on Environmental Quality Trade Fair and Conference, May 2015.
Tom Singleton Associate VP, Director, Integrated Water Resources an Atkins company Linking TMDLs & Environmental Restoration.
Section 319 Grant Program Nonpoint Source Pollution Control
North Oconee River Watersheds Tanyard to Lilly Branch.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
State Approaches to Funding Local Projects A Survey of RFPs The State/EPA NPS Partnership New Orleans, November 27, 2001.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
VIRGINIA’S TMDL PROCESS.
1 Sandra Spence EPA Region 8 TMDL Program EPA Region 8 TMDL Program Integrating Watershed Plans and TMDLs to Help Answer Watershed Planning Questions November.
Sustaining Long Term Regional Coordinated Monitoring Programs Todd Running, H-GAC May 9, 2006.
Taking the Next Step: Implementing the TMDL. What IDEM Provides to Help With Implementation  Compiling all the data in one place  Data-driven recommendations.
Update on Wyoming Draft 303(d) List and Changes to Watershed Planning.
Watershed Protection Plan for the Lower Nueces River Presentation to Nueces County Commissioners’ Court November 10, 2010 November 10, 2010.
Amy Walkenbach Illinois EPA 217/
1 Chesapeake Bay Program Management Board Meeting March 6, 2012 Discussion for the Final Evaluation of Milestones.
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
Michigan Watershed Plan Reviews Presentation at the Michigan Watershed-Based Planning Workshop, Mt. Pleasant, Michigan
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
EPA and Ecosystem-Based Management: Success of the Watershed Approach Michael H. Shapiro Deputy Assistant Administrator for Water, US EPA Capitol Hill.
Straight to the Point – Watershed-based Plans Should: be designed to restore water quality from nonpoint source impairments using sufficiently analyzed.
Preserving York County 2010 Municipal Educational Series January 28, 2010 Rick Keister, Alliance for the Chesapeake Bay Jake Romig, York County Circuit.
Need for Advanced Stormwater Treatment at Lake Tahoe John E. Reuter & Dave Roberts Tahoe TMDL Research Program.
Introduction to Water Quality Trading National Forum On Water Quality Trading July 22-23, 2003 Chicago, Illinois.
Maryland Association of Counties Conference August 12, 2009 Bob Koroncai USEPA Region III The Chesapeake Bay TMDL.
Overview of the Total Maximum Daily Load Program.
Chesapeake Bay Watershed Implementation Plans: Why, What, and When Katherine Antos U.S. EPA Chesapeake Bay Program Office MACo Winter Conference January.
Carin Bisland, EPA Principals’ Staff Committee 5/14/12.
FY 2016 EAP Proposals 1.Groundwater Sampling at Coulee Creek 2.Deep & Coulee Straight to Implementation Project 3.Little Spokane DO/pH TMDL 4.Lake Spokane.
Modeling Fecal Bacteria Fate and Transport to Address Pathogen Impairments in the United States Brian Benham Extension Specialist and Associate Professor,
-WHAT IS A PROJECT ASSESSMENT & EVALUATION PLAN? -WHY ARE WE ASKING GRANTEES TO ASSESS, EVALUATE, & REPORT PERFORMANCE & WHAT ARE THE BENEFITS? - HOW DO.
WATERSHED MANAGEMENT Dov Weitman Chief, Nonpoint Source Control Branch U.S. Environmental Protection Agency May 4, Federal.
1 Chesapeake Bay TMDL Watershed Implementation Plan – Phase II James Davis-Martin, Chesapeake Bay TMDL Coordinator Citizens Advisory Committee to the Chesapeake.
CHRIS ZADAK AND RACHEL OLMANSON, METR0-ST. CROIX WATERSHED UNIT WATERSHED RESTORATION AND PROTECTION STRATEGY.
Goal Lines for Monitoring Gary Shenk TMAW/NTWG 8/15/
Mary Apostolico Potomac Watershed Manager. Current Authorities for TMDL Process Federal Clean Water Act, § 303(d) - TMDL List & TMDL Development §303(e)
Ashley Wendt Texas State Soil & Water Conservation Board NPS Project Manager.
Water Quality Trading – Utah Perspective
NH MS4 Stormwater Permit -- Guidance for NHDES related provisions
Tim Cawthon TCEQ Nonpoint Source Program
Water Quality Restoration Challenges
Mike Bira EPA Region 6 NPS Program
Water Quality Trading Advisory Committee MDA Headquarters
What is a Watershed Implementation Plan?
Water Quality Trading Advisory Committee MDA Headquarters
Straight to the Point – Watershed-based Plans Should:
Жирэмслэлт ба тархины харвалт
Section 319 Grant Program – writing a proposal that can be funded
High Rock Lake TMDL Development
Jon Capacasa, Director Water Protection Division U.S. EPA Region III
Expectations for Federal Agencies in Support if Chesapeake WIPs/TMDL
[Your Product or Company Name Here]
Presentation transcript:

The Nine Elements that Must Be Included in a 319 Watershed Based Plan Identify causes & sources of pollution – TMDL feature Estimate load reductions expected – TMDL feature Describe mgmt measures & targeted critical areas – TMDL feature Estimate technical and financial assistance needed Develop education component Develop schedule – TMDL option Describe interim, measurable milestones – TMDL option Identify indicators to measure progress Develop a monitoring component – TMDL option

Questions? Mike Bira bira.mike@epa.gov Henry Brewer brewer.henry@epa.gov https://www.epa.gov/polluted-runoff-nonpoint-source-pollution/handbook-developing-watershed-plans-restore-and-protect