Modification Proposal Amendment of IUK’s Minimum Wobbe Limit

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Energy24 limited Modification Proposal 0502: Amendment to Gas Quality NTS Entry Specification at the px Teesside System Entry Point.
Information Transparency Proposal Transmission Workstream 2 nd November 2006 Presentation by Abid Sheikh, energywatch and Angela Love, Poyry Energy.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Metering Standards and Impact on Shrinkage Issue for Consideration 1 October 2009 for Gas Transmission Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
“Amendment of Network Entry Provisions at the European Interconnector NTS sub- terminal at Bacton" Transmission Workstream 1 st December 2005.
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
Review Group -140 Thoughts on additional information requirements.
DRSEC Update Transmission Workstream 06 November 2008.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
Transmission Workstream 6 January 2011
Moffat - Capacity System Entry Point
Distribution workstream 29th January 2009
Transmission Workstream February 2009
Entry Capacity Overrun price calculation
Transmission Workstream, 01 October 2009
Exit Capacity User Commitment – Transmission Workstream update
Review of UNC Section Q “Emergencies”
Code Governance Review UNC Modification Proposals
Transmission Planning Code
Transmission Workstream 4th July 2007
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Amendment to NEA & NExA Measurement Provisions Change Process
NTS Entry Charging Review Update
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
Assignment of NTS Entry Capacity – Background and UNC Obligations
UNC 0621L: Amendments to Gas Transmission Charging Regime
The Necessary Criteria for a UNC Modification Proposal
Publication of Zonal Flex Data
Transmission Workgroup June 7th 2012
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Joint Office Presentation for Modification 0678
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
UNC Modification Proposal 0201 National Grid Distribution
Review Group 0175: DM Supply Point Emergency Arrangements
Long Term Non Firm Capacity Update
Interruptible to Firm – NTS Supply Point Transition
Transmission Workstream – Partial Assignment
Transmission Workstream 1st September 2005
Proposed Transitional Gas Exit Arrangements
Proposed Changes to UNC Section O
UNC 0621L: Amendments to Gas Transmission Charging Regime
Richard Fairholme Transmission Workstream 4th September 2008
Assured Pressures Proposal
Entry Overrun Calculation
Reinstatement of NTS Interruption
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Transmission Workstream 6th November 2008
Ofgem presentation to Gas Transmission Workstream
Information Provision for Transitional Exit Capacity
Stefan Leedham Transmission Workstream 2nd November 2006
IECR Incremental Step Size
Title slide [from Title Slide master]
APX OCM Collateralisation
Assignment of NTS Entry Capacity – Work currently being Undertaken
Transmission Workstream, 1 Mar 07
Presentation transcript:

Modification Proposal 0222 - Amendment of IUK’s Minimum Wobbe Limit Transmission Workstream 4th September 08

Background The Wobbe Index of a unit of gas provides a measure of the energy released during combustion GS(M)R limits the range of Wobbe Index that National Grid can accept into the NTS to between 51.41 and 47.20 MJ/m3 for safety reasons Site specific limits to Wobbe Index are detailed in Network Exit/Entry Provisions The Wobbe Limits set out in IUK’s Network Entry & Exit Provisions are more stringent than the GS(M)R limits IUK have raised concerns that this is constraining the amount of gas that can enter or exit the NTS at the continental interconnector

Modification Proposal 0222 Proposal 0222 seeks to lower the minimum Wobbe Limit set out in IUK’s Network Entry & Exit Provisions to the GS(M)R limit of 47.20 MJ/m3 Benefits: A wider selection of gas would be available from Europe Security of supply would be enhanced Competition between ASEPs would be increased Analysis shows that CV shrinkage would not be impacted No UNC text modifications would be required