Alignment NOtes.

Slides:



Advertisements
Similar presentations
UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
Advertisements

Overview A laser projector is a device which uses a pair of rapidly oscillating mirrors to control the direction of a laser beam. The scanning of the mirrors.
Data Acquisition Interface to Support Seismic Retrofit Kenneth Hanson Cerritos College.
1Rugby 55 Presentation – January 2007 The Rugby 55 User Presentation.
X-Ray Survey of The ATLAS SCT. The ATLAS Semi-Conductor Tracker.
MERIT Beam Collimator Design Nicholas Olesen 9 August 2006.
1 Secondary Emission Beam Profile Monitor H. Haseroth, CERN.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
Nature of light Ray or geometrical optics Wave or physical optics Quantum theory: W p =hf.
Construction and Interfacing of a Solar Telescope Jon Turner University of Northern Colorado.
Reflective losses quickly become significant Eugene Hecht, Optics, Addison-Wesley, Reading, MA, 1998.
Science Specification Table 12 keV keV for neutral particles 40.5 cm 2 image plane Electronic Noise 3 keV FWHM Proton Dead Layer
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
TIB cables and optical fibers ______________________________________________________ 13/7/06 CMS-Pisa group.
The printed circuit board (PCB) design
ZTF Interconnecting Scheme Stephen Kaye
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
Laser Notcher Status Dave Johnson PIP Meeting April 29, 2014.
7.2 Central Angle & Arc Length. Arc Length  is the radian measure of the central angle s & r have same linear units r r s = Arc length  radians (not.
S80 Laser Distance Sensors
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
MIT runs syn no label No Label was not connected TTL trigger from delay box CH A to syn.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Objective The student will be able to:
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
Chapter 11 Installing Video and Sound Card Prepared by: Khurram N. Shamsi.
SAM PDR1 S OAR Adaptive Module LGS LGSsystem Andrei Tokovinin SAM LGS Preliminary Design Review September 2007, La Serena.
BNCDB9 F Pin 1 – Center (Red)6 1 – Shield (Black)1 2 – Center (Yellow)8 2 – Shield (Black)3 D OMC Tip-Tilt Adaptor Cable BNC 1(1,6) BNC 2(3,8)
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Flange Plates to be Welded to Beam Flanges.
1 Antonis Papanestis Laser Alignment Monitoring System (LAMS) for the RICH Laser Alignment Monitoring System (LAMS) for the RICH Andrew Macgregor 1, Paul.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
BL SAXS End Station (Small Angle X-ray Scattering)
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
The printed circuit board (PCB) design §PCB design is part of the design process of a product in electronics industry. §PCB is a piece of insulating plastic.
Bell Work: What is the area of a circle with a radius of 6 inches?
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Image: digikey.com 5 Image:
Tiltmeter, Compass,Temperature modules for the PPM.
SC2004 Exhibit Status. Proposed Schedule Exhibit ships from SLAC 7/22 Arrive Fermilab 7/29 Fermilab Quantum Universe display opens 10/1 Ship date to SC2004.
CML 700i measuring light curtains Integrated interfaces and control unit for even simpler operation Leuze electronic | CML 700i product launch | Status:
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Pre calculus Problem of the Day Homework p. p odds, odds Find the area of a triangle with the given dimensions. r = 15 in s = 13 in t.
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Components of Computer
IR Detector - Test cryostat : Machining
LumiCal mechanical design, integration with LDC and laser alignment
HPS Motherboard Electronic Design
installing electrical system
Electronics: Demod + 4Q FE
Comments on OCP Mezz v3 & Connector/Pinout Proposal
> 50 dB ≤ 500 MHz Non-intercepting beam position measurement
n3He Experiment: Spin Flipper and Neutron Polarimetry
MERIT Beam Collimator Design
XY Scanner Mount.
Green arrows show main exit routes for people leading to congestion
Laser Mount.
Four Jaw Collimator.
Breakout Session SC3 – Undulator
Presentation transcript:

Alignment NOtes

Electrical/Computer XY-Tables Controlled by a computer with parallel 25 pin D-connector interface (Laptops don’t have this connector) Need a long cable routed outside the cave Need to install PCI card on the back of one of the nHe-3 computers to operate XY-Tables

XY Tables Dimensions of XY Tables: Large Table: Length: 50.5 inches Height(From floor): 49.5 inches Small Table Length: 26 inches (Not including end mounts) Height(From floor): 29.25 inches

Two Mounts on Large XY Table Extra Mount?

Mount for Small XY Table

Cabling for XY Tables Power cable for beam monitor (Battery operated) Signal cable from beam monitor to pre-amp Power Cable for preamp Signal cable from pre-amp to DAQ Power/Signal cable from XY table to Computer

Placement for small XY table?

Laser Beam Melles Griot: Class 3b 633nm CW Beam emitted at both ends Outputs 4mWatts at each end Beam is ~1/8 inch diameter at close range Safety Requirements apply

Mount for Laser Beam Newport Model 39 Two-axis tilt platform -3.5 to 14 degrees on long axis -5 to 16 degrees on short axis

Mount for Laser Beam Newport model 460P – 90BK 90 degree angle bracket Newport DS40-XY linear stage 0.55 inches travel in both directions

Determine Beam Centroid X1,Y1 X1,Y4 Data points are ordered triples: Beam Centroid Determined from data from large/small xy-tables:

Beam Centroid Need a plan for taking data points 4 Jaw Collimator Square hole aperture