KICK-OFF Overview and thematic approach 19th of June 2017

Slides:



Advertisements
Similar presentations
EXIOPOL Presentation March Presentation of the IP Agenda Introducing EXIOPOL –IP project –Objectives –Implementation plan –Structure.
Advertisements

Introduction to the Global Programme Concept Susan Wingfield Consultant to SBC 13 th January, Dhaka.
Douwe Cunningham Secretary General
EMECO-NOOS Planning Meeting June Background and Rationale Dave Mills Cefas.
PROYECTO NEREIDAS VISIÓN EUROPEA DE LOS PROYECTOS TEN-T ALEXIO PICCO – CIRCLE Malaga 03/04/2014.
Seventh framework programme CAPACITIES specific programme Activities of international cooperation Coordination Support Action - Grant agreement no.:
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
PYROGENESIS S.A H2020 – WASTE CABRISS INTRODUCING SPIRE 2014 PROJECTS June 29, Brussels.
Robust and affordable process control technologies for improving standards and optimising industrial operations Pau Puigdollers Project Coordinator.
DIABOLO has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Project duration:
Environmental Landscape A burden or opportunity? Tony Field South East Europe Marine Business Manager.
EURATOM RESEARCH AND TRAINING ON NUCLEAR ENERGY 1.
Project Presentation.
Elygrid Project Diego Embid Foundation for the Development of New Hydrogen Technologies in Aragon (Spain)
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
Project Presentation.
| 1 European maritime transport space without barriers ECASBA Brussels Seminar May 2009 European maritime transport space without barriers Patrick.
Brokerage session MG Safer and more efficient waterborne operations Ralf Fiedler, Forschungszentrum Jülich Maritime Transport and Innovation.
Expert consultations Programme Area 8/Maritime Sector and Programme Area/21 Green Industry Innovation Anne Lise Rognlidalen Country Director Romania-Bulgaria,
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
First ARGOS Workshop First ARGOS WORKSHOP (Barcelona, March 15, 2010) EHR Certification in EU Georges De Moor This project is funded.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
The EHLEIS project of the European health expectancy monitoring unit 2oo7-2o1o European health expectancy monitoring unit.
Horizon 2020 – 2016 Transport Call
FOSTERING INDUSTRIAL SYMBIOSIS FOR A SUSTAINABLE RESOURCE INTENSIVE INDUSTRY ACROSS THE EXTENDED CONSTRUCTION VALUE CHAIN This project has received funding.
– Stellar – Selective Tape-laying for Cost-Effective Manufacturing of Optimised Multi-Material Components Selective Tape-Laying for Cost-Effective.
1 Lean Ships General Principles The Project is funded in the H2020 Work Progamme of the European Union Contract No.:
Orientations towards the Scoping Paper H2020 Transport Programme Committee Brussels, 22 June 2016 SMART, GREEN and INTEGRATED TRANSPORT.
Accelerating progress towards the Green Economy
ClairCity The multiple mechanism of engagement WP4 ClairCity approach
Daniel Deybe – Ewald Pertlik DG RTD – I-1 Brussels – Jan 20, 2005
Global Energy Problems and Counter Policies and Measures of Korea
Transmitted by the representative of the
WP3 - Evaluation and proposal selection
Nicolas Granier / June 7th
CEF Action n° 2016-EU-SA-0009 "CYnergy"
PSCE Conference Athens 23th November 2016
Blue Action WP5 Workshop July 2017 GERICS, Hamburg
LeanShips Project General Principles
WBC-INCO.NET - MIRA Workshop Sarajevo, 5-6 November 2012 Initiatives to Support Innovation Policy in the WBCs - Presented by Alma Hasanović Ministry.
Baltic Sea cooperation for reducing ship and port emissions through knowledge- & innovation-based competitiveness BSR InnoShip Baltic Sea cooperation for.
DIABOLO has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No Project duration:
Greening the economy - The Roadmap to a resource-efficient Europe
SIIF pilot support group Meeting 17 Apr 2013
Sustainable management of E-waste
Closed Loop Wind Farm Control
WMO Global Multi-Hazard Alert System
A New Circular Economy Concept
DG Environment, Unit D.2 Marine Environment and Water Industry
MEthane activation via integrated MEmbrane REactors
The role of cities in promoting Active Inclusion
Demonstration activities and links with the European Innovation Partnership and Structural Funds Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including.
ENabling SafE Multi-Brand Platooning for Europe
LeanShips Project General Principles
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.1 Coping with climate change European Commission Research.
Seminar Series on Total Quality Management
GPC WG and GPC meeting 5th of June “Future of Joint Programming”
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
Natural Gas Innovation Fund Investment Intake Template Project Title Submitted By *Note: This template is intended as a guide on content; you may.
Juan Gonzalez eGovernment & CIP operations
ENabling SafE Multi-Brand Platooning for Europe
ABCPhD Doctoral Program in architecture, built environment and construction engineering ABCPhD Call4Scholarship 34 RESEARCH TOPIC: Automation, Robotics.
The HybridGEOTABS project
Find Your Chance - Horizon 2020
Chapter RESOURCE ACCESS AND DEVELOPMENT
WP6 – EOSC integration J-F. Perrin (ILL) 15th Jan 2019
Natural Gas Innovation Fund Investment Intake Template
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
Presentation transcript:

KICK-OFF Overview and thematic approach 19th of June 2017 This project has received funding from European Union´s Horizon 2020 research and innovation programme under grant agreement Nº 723360 KICK-OFF Overview and thematic approach 19th of June 2017 PRIVATE ¬ CONFIDENTIAL © Document property of FIBRESHIP

THE CHALLENGE THE IMPACT GENERAL INFORMATION MAIN OUTCOMES LEGACY INDEX THE CHALLENGE THE IMPACT GENERAL INFORMATION MAIN OUTCOMES LEGACY THEMATIC APPROACH

THE CHALLENGE

THE CHALLENGE This is the status…. Would we be able to solve the few technological gaps required to create in Europe a revolutionary niche of market aimed to build large length vessels in FRP materials? This is the status….

THE IMPACT

THE IMPACT 30% A B VESSEL VESSEL CARGO Extra-Weight VESSEL Fuel Reduction (10-15%) Reduced maintenance & life cycle costs (30%) Immune to corrosion Lower Greenhouse gas emissions Extra-Weight Continuous Health Monitoring (safety) Better Stability/Safety Aesthetic improvements Increase cargo capacity (12%) FIBRESHIP CARGO VESSEL Recycling rate (75%) Underwater Noise Reduction

APPLICATION Seagoing Inland

GENERAL INFORMATION

GENERAL INFORMATION Number: 723360 Duration: 36 months Start Date: 1st of June 2017 End Date: 31st May 2020 Estimated Project Cost:€11,041,212.50 Requested EU Contribution:€8,866,322.75 TRL: 7-9

GENERAL INFORMATION

MAIN OUTCOMES

GENERAL INFORMATION Cost-benefit analysis & business plan Engineering Guidelines on inspection, repair, monitoring and maintenance applicable to FIBRESHIP concept Guidelines on waste management in the implementation of FIBRESHIP concept Structural health monitoring & long-term damage control (as part of the Engineering Guidelines) Guidelines and Decision Support Tool on life-cycle performance of FIBRESHIP concept) Design report for each vessel category & Catalogue of admissible structural junctions and details. Project guidelines for functional design and certification of large-length vessels in FRP materials Engineering End-users final assessment Production & Life Cycle/Dismantling Validation and demonstration Engineering Cost-benefit analysis & business plan FIBRESHIP Mechanical & Fire-Resistance Tests Fibre-based Materials Manufacturing & Recycling Processes Small & Full-Scale Validations WP2 WP9 WP1 WP8 WP3 WP4 WP7 Shipping Market Analysis WP10 Coordination Dissemination WP6 WP5 European and global business trends FIBRESHIP Business Canvas and global business plan Optimum building strategy & techniques Class Rules & Guidelines for building process. Analysis of existing shipyard facilities transformation Production Adapted numerical tools for vessels design (structure and fire) Numerical tools validation (Demo model) Tools Catalogue of applicable materials and joining techniques by vessels areas Materials Dissemination & Exploitation Infodays (workshops) & Open-door industrial days organisation Regulatory and Standardization of the results Engineering solutions for aesthetic, on board noise and vibration & underwater noise improvements Procedures for Sea state & structural stresses measurements and intermediate-scale reaction-to-fire experiments on FRP panels Inspection and maintenance technologies & procedures Demonstrator & Production Process Assessment

LEGACY

LEGACY Short Term (0 Years) Medium Term (1/3 Years) Medium/Long Term (3/5 Years) Business Opportunity Massive application of FRP-materials Competitiveness of the European Operators Shipbuilding Industry SSCC: rules approval Owners: specifications & orders Shipyard: facilities adaptation Policies Environmental Fuel safety / Gas Emissions Directive 2012/33/EU Life cycle performance & reduced maintenance costs Directive 2013/1257/EU Underwater Noise impact Directive 2008/56/EU Safety SOLAS / IMO / EMSA Fire safety Stability etc… Relevant advance over the traditional methods, allowing the exploitation of the new solutions and procedures in the existing market

THEMATIC APPROACH

THEMATIC APPROACH Cost-benefit analysis & business plan Engineering Shipping Market and Business Analysis Production & Life Cycle/Dismantling Validation and demonstration Engineering Cost-benefit analysis & business plan FIBRESHIP Mechanical & Fire-Resistance Tests Fibre-based Materials Manufacturing & Recycling Processes Small & Full-Scale Validations WP2 WP9 WP1 WP8 WP3 WP4 WP7 Shipping Market Analysis WP10 Coordination Dissemination WP6 WP5 Design and Engineering Materials, Components & Modelling Production and Life Cycle Management Shipping Market and Business Analysis Shipping Market and Business Analysis