Improving Collimator Setup Efficiency

Slides:



Advertisements
Similar presentations
Collimation with retracted TCSGs R. Bruce, R. Kwee, S. Redaelli.
Advertisements

Combined cleaning in IR3 - MD results and simulations Adriana Rossi R.W.Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, L. Lari, S. Redaelli, G. Valentino,
DS Quench TEST 2  MOTIVATION and METHOD: 1. Achieve 500kW on beam 1 – TCP7 collimators.(so far 500kW with beam 2 and 235kW over 1s with beam 1 were reached.
LHC Collimation Working Group – 19 December 2011 Modeling and Simulation of Beam Losses during Collimator Alignment (Preliminary Work) G. Valentino With.
Collimation MDs LHC Study Working Group Daniel Wollmann for the Collimation-Team, BLM-Team, Impedance-Team, … LHC Study Working Group,
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
Collimation Meeting Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
Off-momentum tail scraping for passive abort gap cleaning (MD 444) D. Mirarchi, R. Bruce, S. Redaelli On behalf of the LHC Collimation Team LHC Study Working.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Beam Distribution MD Sun, :00 to 14:00 F. Burkart R. Assmann, R. Bruce, M. Cauchi, D. Deboy, C. Derrez, L. Lari, J. Lendaro, A. Masi, S. Redaelli,
LHC Studies Working Group – 03 July 2012 Beam Scraping and Diffusion + Asynchronous Dump MD G. Valentino, R. W. Assmann, F. Burkart, L. Lari, S. Redaelli,
Status of FLUKA Simulations for Collimation BLM Thresholds 6 th BLM Threshold Working Group 10/02/2015 E.Skordis On behalf of the FLUKA team Sixtrack input.
LHC Collimation Working Group – 20 February 2012 Collimator Setup Software in 2012 G. Valentino R. W. Assmann, S. Redaelli and N. Sammut.
LHC Collimation Working Group – 02 April 2012 Results from Beam-Based Collimator Alignment G. Valentino, R. W. Assmann, R. Bruce, F. Burkart, M. Cauchi,
BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated.
Improving Collimator Setup Efficiency LHC Beam Operation Committee, G. Valentino, R.W. Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, S.
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
How low can we go? Getting below β*=3.5m R. Bruce, R.W. Assmann Acknowledgment: T. Baer, W. Bartmann, C. Bracco, S. Fartoukh, M. Giovannozzi, B. Goddard,W.
R.W. Assmann, V. Boccone, F. Cerutti, M. Huhtinen, A. Mereghetti
Ion Commissioning: Thursday & Friday
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Tracking simulations of protons quench test
1st LHC MD Period Started
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Saturday 24 March 2012.
LHC collimation MDs, crystals and halo control
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
Halo scraping and loss rates at collimators
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Tuesday TOTEM and transverse loss map (1) OK
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of Week 13 G. Arduini, B. Holzer
LHC Injection and Dump Protection
The 4th International Particle Accelerator Conference, IPAC13
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
Collimation after LS1: cleaning and β* reach
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Collimation margins and *
Summary Thursday h21: Stable beams fill #1303.
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Sat morning Until 12:40: Loss maps at injection
Collimation qualification during the first weeks of the 2011 run
MD Planning Fri – Sat (1. – 2.7.)
Summary for LPC (March 7th, Ralph Assmann)
Plan for 1 m b* J. Uythoven & J. Wenninger
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Fri :52 Stable beams fill #2536
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Operational Results of LHC Collimator Alignment using Machine Learning
LHC beam mode classification
Operational Results of LHC Collimator Alignment using Machine Learning
Presentation transcript:

Improving Collimator Setup Efficiency G. Valentino, R.W. Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, S. Redaelli, A. Rossi, D. Wollmann. LHC Collimation Study Group, 11.04.2011 1

Acknowledgements Collimation Team: R. Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, A. Rossi, D. Wollmann. BE/OP: A. Macpherson, S. Redaelli, E. Veyrunes University of Malta: N. Sammut Gianluca Valentino

Outline Introduction Collimator Setup in 2011 LHC collimation system setup method Summary of collimation setups performed in 2011 Collimator Setup in 2011 Collimator Control software in 2010 Modifications to the software for 2011 Comparison of Collimator Setup Performance in 2010 and 2011 Measured beam size and gap offsets Time required for collimator setup Conclusions and Future Work Gianluca Valentino

Collimator Setup Procedure Reference collimator 1 Collimator i 2 Reference collimator Collimator i BLM BLM Beam Beam 3 Reference collimator Collimator i Define beam edge by hor, ver or skew reference collimator Center collimator i Re-center reference collimator Beam size: Open collimator to BLM Beam Collimator i 4 Reference collimator BLM Beam D. Wollmann Gianluca Valentino

Collimator Setups Performed Injection (450 GeV): 25/02/2011 – 01/03/2011 86 collimators 3.5 TeV Flat Top: 06/03/2011 – 08/03/2011 80 collimators 3.5 TeV after squeeze to beta* 1.5m / 10m / 1.5m / 1.5m: 11/03/2011 16 collimators 3.5 TeV during collisions: 11/03/2011 Gianluca Valentino

Collimator Control Application in 2010 Increment Jaw Position by clicking Apply! BLM Signal Chart (1 Hz, 1.3 sec running sum) Collimator Motor Positions Chart (1 Hz) S. Redaelli Gianluca Valentino

Collimator Setup in 2011 Modifications to original application from S. Redaelli done by G. Valentino, with input from R. Assmann, R. Bruce, S. Redaelli, and D. Wollmann. Main goals: Guarantee high quality of setup (independent of user) Reduce risk for human errors during the setup (unnecessary beam dumps) Optimize total setup time Reduce stress on users Gianluca Valentino

Semi-Automatic Feature Introduction of a semi-automatic feature: Automatic step-wise movement of collimator jaws (can choose from 5 – 100 µm steps) The software automatically moves in the collimator until the resulting BLM signal exceeds a user-defined threshold. Gianluca Valentino

Initialization Procedure Move collimators in parallel to the beam by class (TCSG, TCLA, TCT) and plane Limitation: Multiple Collimators stop moving! Gianluca Valentino

Setup Procedure Setup each collimator in sequence (define reference edge using TCP in plane) Threshold Interesting: See 40s decay of loss spike! Automatic stop after crossing BLM threshold Fine adjustment after initialization D. Wollmann Gianluca Valentino

Automatic Logging of Setup Data Automatically log collimator setup data to file All user-generated events (initialization procedure, collimator movements) are saved No need for manual filling in of excel sheets Gianluca Valentino

Collimation Vistar Jaw Gap shown to scale Improved Collimator fixed status display (available in the CCC and online) Modifications of the collimator status display by E. Veyrunes and S. Redaelli done by G. Valentino with input from collimation team and BE/OP Left Jaw Position in mm PRS status Right Jaw Position in mm MDC status Jaw Gap shown to scale Gianluca Valentino

Collimator Vistar Gianluca Valentino

Difference in Beam Offset: B1 2010 and 2011 Gianluca Valentino

Difference in Beam Offset: B2 2010 and 2011 Gianluca Valentino

Beam Size Ratio: 450 GeV B1 2010 vs 2011 2010 Average: 1.20 2010 Std Dev: 0.28 2011 Average: 1.10 2011 Std Dev: 0.11 TCLA.B5R3.B1 TCSG.B5R3.B1 TCSG.5L3.B1 TCSG.A5R3.B1 TCSG.B5R3.B1 TCSG.4R3.B1 TCP.6L3.B1 σmeas. / σnominal Gianluca Valentino

Beam Size Ratio: 450 GeV B2 2010 vs 2011 2010 Average: 1.13 2010 Std Dev: 0.24 2011 Average: 1.10 2011 Std Dev: 0.18 TCP.6R3.B2 TCSG.A5L3.B2 TCSG.A5L3.B2 TCSG.B5L3.B2 σmeas. / σnominal Gianluca Valentino

Beam Size Ratio: 3.5 TeV B1 2010 vs 2011 2010 Average: 1.21 2010 Std Dev: 0.22 2011 Average: 1.22 2011 Std Dev: 0.24 Tilt in TCLA.A7R7.B1 Tilt in TCTH.4L2.B1 σmeas. / σnominal Gianluca Valentino

Beam Size Ratio: 3.5 TeV B2 2010 vs 2011 2010 Average: 1.10 2010 Std Dev: 0.24 2011 Average: 1.12 2011 Std Dev: 0.24 Tilt in TCSG.A5L3.B2 σmeas. / σnominal Gianluca Valentino

Collimator Setup Time Comparison The time taken to set up collimators is the most important indicator of the efficiency of a set up algorithm. Data from the logbook cross-checked with Timber. Average Time per Collimator = Time used for set up / Number of collimators Total Shift Time = Time used for setup + Time taken to get the LHC back to the operating point in case of a beam dump*. * For 2010, these values were taken from S. Redaelli’s Chamonix 2011 talk on “Optimization of the Nominal Cycle”. Gianluca Valentino

Collimator Setup Time Comparison 2010: 2011: Date Setup Type Avg Time / collimator (mins) Total Shift time (hrs) #beam dumps 05 – 07 May 450 GeV 5.34 8.35 1 12 – 16 Jun 3.5 TeV flat top 9.35 27.27 4 17 Jun 3.5 TeV squeeze 10.8 8.26 20 Jun 3.5 TeV collisions 8.48 Human Error: Jaws moved in based on rough idea of the orbit Date Setup Type Avg Time / collimator (mins) Total Shift time (hrs) #beam dumps 25 Feb - 1 Mar 450 GeV 12 18.52 2 6 –8 Mar 3.5 TeV flat top 13 17.77 11 Mar 3.5 TeV squeeze 5.5 3.5 TeV collisions 3.6 1.33 Gianluca Valentino

Beam Intensity at 3.5 TeV, 2010 vs 2011 2010: Rapid decrease in beam intensity during setup 2011: Gentle shaving of the beam Gianluca Valentino

Change of β-tron local cleaning inefficiency (3. 5 TeV, 1 Change of β-tron local cleaning inefficiency (3.5 TeV, 1.3s integration) D. Wollmann Gianluca Valentino

Conclusions New semi-automatic collimator setup tool works. Quality of collimator setup compares well with last year. Improvement by factor ~1.5 in setup time at flat top. Improvement by factor ~5 in setup times for after squeeze and collisions. No dumps with new software. Ongoing work to improve the system, particularly setup time per collimator. Gianluca Valentino

Future Work: 30 Hz BLM Signal Next year: 30 Hz BLM signal should increase the setup speed further. How can we exploit this as much as possible? This is related to ongoing work by F. Burkart on halo population studies. 40 seconds loss decay Gianluca Valentino

Future Work: Integrate code into OP software Modifications were done in a copy of the collimation control software. Done to allow for testing and debugging of the new code while in parallel having a production version of the collimator control software available. New semi-automatic collimation software is now fully tested and has proven to be efficient in collimation setup. Collaborate with OP (S. Redaelli et al.) in implementing the modifications into the OP software. Gianluca Valentino

Other Future Work Identify automatically the collimator causing the loss signal during setup. Dynamic variation of step size, possibly helped by obtaining feedback from other BLM running sums. “Real-time” BLM signal loss simulator to test future setup algorithms. LHC MD time requested for testing new algorithms. Gianluca Valentino

END Gianluca Valentino