SAM Regional Seminar/Workshop

Slides:



Advertisements
Similar presentations
Template created by Giorgio Camilleri, March 2006 June 2006 TRANSITION ICAO Air Navigation Bureau Radio Spectrum Seminar Cairo, Egypt.
Advertisements

International Civil Aviation Organization Establishing and Sustaining an RSOO: Enablers, Obstacles and lessons learnt Meshesha Belayneh Regional Director,
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
Nadia Konzali Project Coordinator, COSCAP-GS
International Civil Aviation Organization European and North Atlantic Office High Level Safety Conference Preparatory Workshop Baku, Azerbaijan 9-11 February.
International Civil Aviation Organization European and North Atlantic Office Outcome of the ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010.
Systematic Management of Safety The SAA of Ukraine Viewpoint Presentation of the SAA of Ukraine for ICAO European Region Aviation Safety Seminar/Workshop.
CAR/SAM Regional Guidance Material on Air Traffic Services Quality Assurance Programmes NAM/CAR/SAM Quality Assurance Workshop Gustavo De León Regional.
International Civil Aviation Organization FAOSD Programme Administrative and Programme Participation Terms & Conditions Roles and Responsibilities.
International Civil Aviation Organization European and North Atlantic Office CLARIFICATIONS FROM ICAO - ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June.
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
Introduction to PBN Seminar ICAO PBN Implementation 1.
ACAC Seminar - Civil Military Coordination Rabat, September 2005 Jehad Faqir Director, Safety, Operations & Infrastructure AVIATION FUEL CRISIS Mitigating.
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
ICAO - EUROCONTROL Regional Language Proficiency Seminar.
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Presented to: Pacific Aviation Directors’ Workshop By: Jim Spillane, Sr. FAA Representative, Pacific Rim Date: 3/14/2012 Transition to the USOAP Continuous.
CANSO Role in ATFM/CDM in APAC
ICAO Changes to the Present Flight Plan Form Amendment 1 to the PANS-ATM Fifteenth Edition (PANS-ATM, Doc 4444) Tom Brady ICAO HQ.
International Civil Aviation Organization GNSS SURVEY OUTCOME Secretariat ICAO APAC Office GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
U.S./Europe International Aviation Safety Conference By: James Ballough, FAA, and Claude Probst, EASA Date: June 4, 2008 “Global Safety Management: Revolution.
Amendment Proposal to Doc 9868 – PANS - Training
Victor Kourenkov ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 LEGISLATION AND ORGANISATION CONSIDERATIONS.
The European Organisation for the Safety of Air Navigation AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions Paul Bosman Manager SWIM/EA Unit,
COG/TNG contribution to LPR Implementation Language Proficiency: a safety issue St. Petersburg May 24th 2011.
European Regional Aviation Safety Group (RASG EUR)
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Today’s presentation will summarize some IFATSEA activities that have occurred in the last year. International Federation of Air Traffic Safety Electronics.
African Flight Procedure Programme Assistance (AFPP)
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
Summary of discussions of the NGAP Implementation Working Group 6 and 7 December 2016 Mary Nelson – Implementation Working Group Chair 8th December 2016.
IATA’s Role – Implementation of Safety Activities
APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23 DP/3/1
FAOSD Programme Administrative and Programme Participation Terms & Conditions Roles and Responsibilities.
Malta Language Proficiency Requirements Implementation
GOLD GOLD Amendment Program Presented to: SOCM/2 Seminar
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
COSCAP-SEA Work Programme Discussion Paper 3
Workshop on preparations for ANConf/12 − ASBU methodology
FPL 2012 FPL Vendor Conference Mona Annaddaf Scotland, 7-8/12/2011
Guidance notes for Project Manager
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
RST processes Session 5 Presentation 2.
ICAO Air Navigation Bureau
HIGH LEVEL SAFETY CONFERENCE Montreal 30 March 2010
AIXM CCB meeting EUROCONTROL HQ, Brussels
CANSO Role in ATFM/CDM in APAC
Regional Director, Eastern & Southern African Office, ICAO
Sharon Mahony Environment Unit
Amendment 40 to ANNEX 15 Air Navigation Procedures for AIM Seminar
AIM Global Strategy Air Navigation Procedures for AIM Seminar
Systematic Management of Safety
AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions
Joint Planning and Development Office “Where new ideas are welcome”
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
Objectives of the meeting
English Language in ATC
Performance Based Navigation –Civil Aviation Authority Actions
RSOO Role in Relation to New ICAO Strategies
ICAO Forum on Integration and Harmonization of NextGen and SESAR into the Global ATM Framework 8-10 September 2008 Lex Hendriks Deputy Director DAS, EUROCONTROL.
The Survival Plan.
North Asia Regional Aviation
NAM/CAR/SAM Quality Assurance Workshop Gustavo De León
Language Proficiency: a safety issue
Briefing to ICAO TCB Seminar
Presentation transcript:

SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May 2011 2012 Flight Plan Implementation and Transition

2012 Flight Plan Implementation status Topics Impact of the ICAO Flight Plan changes Implementation and Transition Strategy Regional Progress Stakeholder position Issues and Concerns Next Steps 2012 Flight Plan Implementation status

2012 Flight Plan Implementation status ICAO Flight Plan Form 2012 Flight Plan Implementation status

Impact of the ICAO Flight Plan changes Will require global software and possibly hardware changes. There are implementation costs for States and Airlines. There will be changes to procedures. There will be a need for staff training. Likely to be aviation disruption if the harmonized changes are not completed by the applicability date. The implementation could be compared to that of the year 2000 changes. 2012 Flight Plan Implementation status

Implementation and Transition Strategy ICAO HQ is working with the ICAO Regional Offices (RO) to ensure a harmonized application of the changes. ICAO Regional offices providing facilitation for Task Force meetings. ICAO Regional offices providing Workshops and Seminars for their respective States. ICAO HQ has provided guidance material to States. A comprehensive Implementation and Transition Schedule has been made available. ICAO secretariat is demonstrating its full commitment to the role-out and implementation of proposed changes 2012 Flight Plan Implementation status

2012 Flight Plan Implementation status

ICAO Regional Progress All 7 ICAO regions have agreed with the proposed ICAO HQ timeline for Implementation and Transition. EUR/NAT has a different implementation approach however will meet the ICAO deadlines. We are asking all ANSPs to be ready to accept filing of both NEW and PRESENT flight plans from 1 July 2012. Most States have reviewed the impact of the changes on their systems and procedures and some are already testing with NEW flight plan data to verify the changes. There is a full schedule of regional meetings, workshops and seminars planned for 2011. 2012 Flight Plan Implementation status

2012 Flight Plan Implementation status Stakeholder Position ICAO HQ and the Regional Offices working closely with aviation representatives. IATA being regularly briefed and a good exchange of information between ICAO and IATA. IATA have issued a comprehensive information paper to their members and have significantly raised the profile of the FPL changes. ASECNA, ACAC, EUROCONTROL, CANSO and many others are facilitating meetings and encouraging their States to report their implementation status. Vendors, system providers and Airline operators are being encouraged to attend seminars and workshops. 2012 Flight Plan Implementation status

2012 Flight Plan Implementation status FPL 2012 phases 2012 Flight Plan Implementation status

2012 Flight Plan Implementation status Issues and Concerns Some ICAO States are behind the implementation schedule. Some States do not see the need for the change “what's in it for me” syndrome. Many States are not providing their implementation progress for entry into the FITS database. http://www2.icao.int/en/FITS/Pages/home.aspx Maintaining a harmonized implementation of the FPL change. Editorial clarification of Amendment 1 to be issued. IATA advising their members to go for a switchover to the NEW FPL around 15 November 2012, the days before this need to be well planned. 2012 Flight Plan Implementation status

2012 Flight Plan Implementation status Next Steps Continue the awareness campaign throughout the aviation industry especially among airspace operators. ANSPs and Aviation users must plan for the change considering especially safety, budgets, training, documentation and testing. ANSPs in the region need to work together to support each other and share their best practice. ANSPs should keep in constant contact with their regional ICAO offices to report progress and issues We need to focus energies to support those States and aviation operators who are behind the implementation schedule. 2012 Flight Plan Implementation status