SEWER DEPARTMENT BUDGET WORKSHOP

Slides:



Advertisements
Similar presentations
Proposed Water & Sewer Rates FY2014 Department of Utilities & General Services April 1,
Advertisements

Sanitary Sewer System Rate Study September 2012 Keystone Municipal Services.
SEWER DEPARTMENT FY 2008/09 BUDGET WORKSHOP April 9, 2008.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
1 CITY OF MONROE WASTEWATER DEPARTMENT BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities March 27, 2010.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Maintaining Sustainable Water and Waste Disposal Services Copyright 2011 Community Resource Group, Inc. No part of this presentation may be copied or.
Fairview Township, York County May 28, 2015
MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 FISCAL YEAR BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
WATER DEPARTMENT BUDGET WORKSHOP FY16 RECOMMENDED BUDGET March 12, 2015.
TOWN OF MONTREAT FISCAL YEAR Annual Budget Public Hearing and Presentation to the Board of Commissioners June 13, 2013.
2016 BUDGET OVERVIEW SANGER, TEXAS. BUDGET PHYLOSOPHY Conservative revenue estimates based on history. Expenditures based on history and anticipated cost.
2014 Budget Department Presentations Infrastructure Funding Options.
City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City of Palo Alto Finance Committee May 19, 2009 Public Works Department- Enterprise Funds.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Page: Water and Wastewater Rate Study and Financial Forecast Council Presentation City of Cottonwood July 2009.
City of North Miami Beach Quarterly Financial Analysis Second Quarter – FY 2015 Data as of March 31, 2015.
Town of Broadway Fiscal Year 2014 Budget May 7, 2013.
JAMES CITY SERVICE AUTHORITY FY BUDGET OVERVIEW.
2008 Total Tax Collections $125,663, Budget Headlines State Aid allocation has significantly decreased again in the amount of $315,928. Total.
Town of Broadway Fiscal Year 2016 Budget May 19, 2015.
1 Public Hearing User Rate Adjustments April 8, 2008.
FEBRUARY 22, 2016 FY 2017 County Administrator’s Recommended Budget.
SUMMARY OF FY2016 PROPOSED BUDGET July 21,
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
WATER & SEWER ENTERPRISE FUNDS. Criteria for Rates  Overall Goal – to set rates to recover costs & avoid significant fluctuations Criteria: o Project.
FY 2010 Budget Slide 1 Public Works March 18, 2009 Wastewater User Fees Wastewater Collection Proposed RCO Fee Surcharge Recommendation: Regional Consent.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
What are they and how are they calculated? May 2015.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2015 / 16 First Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
AUGUST 8, 2016 PROPOSED BUDGET WORKSHOP Proposed Budget.
Budget City of Palm Coast, Florida City Council Work Session August 12, 2008.
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
Long Range Financial Forecast Preview
Portugal Cove - St. Philip’s
City of Petersburg Water and Wastewater Rates
Revised Budget Proposed budget
Water and Wastewater Rates
CITY OF NEW SMYRNA BEACH
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Town of Broadway Fiscal Year 2018 Budget May 2, 2017.
City of Sisters, OR 2017 Water & Sewer Rate Study
City of Petersburg Water and Sewer Rates April 26, 2011
Wastewater Surcharge Reduction for Manufacturing Processes
Fiscal Year 2018/19 Budget.
Financial Audit Presentation Year Ended June 30, 2018
Water and Sewer Rate Study
MEOA Annual General Meeting & Trade Show
City of Lebanon, Missouri Electric Department
McDuffie County Board of Education M & O Millage Calculations for FY 2018 Budget 98% Collection Rate Tax Digest 569,906, % Tax Commissioner*
Idyllwild Water District
City of Rehoboth Beach Water and Wastewater Financial and Rates Review
FY 2018/19 Recommended Budget Town of Manchester, Connecticut
Town of Broadway Fiscal Year 2019 Budget May 1, 2018.
FY 14 Budget Presentation 20 May 2013
WATER DEPARTMENT BUDGET WORKSHOP
FY 2019/20 Recommended Budget Town of Manchester, Connecticut
FY 2019/20 Recommended Budget General Government & Fixed/Miscellaneous Town of Manchester, Connecticut March 7, 2019.
FY 2019/20 Recommended Budget Town of Manchester, Connecticut
Commission Workshop 3 Budget Presentation
Town of Broadway Fiscal Year 2020 Budget May 7, 2019.
Town’s Operating Budget
Presentation transcript:

SEWER DEPARTMENT BUDGET WORKSHOP FY2019/20 RECOMMENDED BUDGET March 14, 2019

SEWER DEPARTMENT FY2019/20 Recommended Budget Plant Effluent Comparison Performance Before and After the Comprehensive WWTP Upgrade Flow (MGD) TSS (mg/l) BOD5 (mg/l) T-Nitrogen (lbs/day) T-Phosphorus (lbs/day) Purchase\Sell Nitrogen Credits 2010 Monthly Average 6.1 5 2.8 860 86 $160,000.00 2015 Monthly Average 5.3 2.5 293 51 $9,900.00 2016 Monthly Average 4.9 1.25 1.5 176 2.9 $67,209.00 2017 Monthly Average 5.03 1.4 1.7 151 7.7 $25,524.00 2018 Monthly Average 6.08 1.9 267 8.83 $8,079.60 Permit Limit 16 30 312 13.21

SEWER DEPARTMENT FY2019/20 Recommended Budget Sewer Fund Summary Total Recommended Expenditures - $9,674,482 The net decrease expenditures totals $8,654 (-0.1%) below FY2018/19 Budget Operating expenditures increased by $163,120, or 3.3%, Non-operating expenses decreased by $171,774 or -3.6%, which is almost entirely due to reclassifying short-term note paydowns as a non-budgetary accounting transaction

SEWER DEPARTMENT FY2019/20 Recommended Budget Expenditure Summary Major Expense Overview Personal Services and Employee Benefits increased $96,048 (3.1%) Purchased Services and Supplies increased $67,072 (3.7%) Utilities increased $76,944 Chemicals decreased $35,100 Sewer Line and Manhole Maintenance increased $8,738 Sewer Flow to Other Towns increased $5,520 Inter-fund Transfers increased $116,896 (9.6%) Due to an increase in capital budget spending $70,000 and transfer to MISP $32,355 Debt Service decreased - $358,670 (-10.3%)

Recommended transfer to Sewer Reserve $475,000 SEWER DEPARTMENT FY2019/20 Recommended Budget Transfer to Reserve Summary Recommended transfer to Sewer Reserve $475,000 Capital List Cost Meters – Annual purchase $ 50,000 Annual purchase for replacement meters and MXU’s (sewer portion) Jet Vac Truck Replacement $230,000 Replacement of a 2008 Jet Vac in FY20 second of two installments Aeration Blower Service Plan $ 75,000 Preventative maintenance program for four HIS turbo blowers Laboratory Cabinetry $ 25,000 Spilt with Water Fund Vehicle Replacement – Engineering $ 10,000 Video Truck Replacement $ 65,000 First of two installments Oversized Pipe $ 20,000

Sanitary Sewer Improvement Program (SSIP) Total Cost SEWER DEPARTMENT FY2019/20 Recommended Budget Note-Funded Capital Projects Sanitary Sewer Improvement Program (SSIP) Total Cost Infrastructure Improvements $600,000 For sewer pipe rehabilitation and/or replacement In general, replacement projects target areas that contribute large amounts of Inflow and Infiltration (I/I) to the sanitary collection system or areas where problems have been known to exist Work accomplished through previous SSIP appropriations have resulted in significant improvements to the sanitary collection system

SEWER DEPARTMENT FY2019/20 Recommended Budget Note-Funded Capital Projects Infrastructure Improvements Total Cost Infrastructure Improvements $600,000 For sewer pipe rehabilitation and/or replacement in conjunction with Public Works Projects In general, replacement projects targets areas not necessarily a priority based on the SSES however old enough to warrant the improvements These improvement projects continue our efforts to coordinate with Public Works in order to provide a comprehensive approach to roadway reconstruction

SEWER DEPARTMENT FY2019/20 Recommended Budget Revenue Summary Total Recommended Revenue - $9,384,592 Revenue from regular sewer service charges are estimated to be $7,077,332 (This reflects a 2.0% rate adjustment) Revenues derived from Eighth Utilities District based on a formula in the agreement and estimated to be $1,594,181 ≈ $4.18/HCF Revenues derived from Bolton Lakes Regional Sewer are estimated to be $59,939 Water Department use fee $438,500 Nitrogen Credits of $15,000 Miscellaneous revenue $299,640 The use of Retained Earning in the amount of $289,890 is necessary to meet our Recommended Expenditures The FY20 Budget maintains a level of working capital equal to 180 days of operating expense The reason for the decrease is based on the formula for calculating the sewer rate. The updated amount of sewer mains based on GIS data and the mix of capital projects drive the decrease in rates. Basically the more capital spent on the Town’s collection system can cause a reduction in the rate since it is not being used by the District.

SEWER DEPARTMENT FY2019/20 Recommended Budget Sewer Rate Increase Assumed in Model:

SEWER DEPARTMENT FY2019/20 Recommended Budget Sewer Rate Increase Assumed in Model:

SEWER DEPARTMENT FY2019/20 Recommended Budget Value Comparison Sewer use cost is based on average use of 2,200 cubic feet/per quarter Current usage rate is $5.11/HCF (Hundred Cubic Feet) Manchester’s average sewer use bill is currently $37.47 per month ($112.42 per quarter) or $449.56 per year Proposed sewer usage rate is $5.21HCF A 2.0% rate adjustment would increase the average sewer bill by $0.75 per month ($2.25/quarter) or $8.99 per year That equals ≈ 0.709¢ for every gallon of wastewater a customer discharges (equivalent to about 1.12¢ per flush)

SEWER DEPARTMENT FY2019/20 Recommended Budget *In addition to the ad valorem tax to the member town Bolton Lakes’ cost does not include their assessment for installation of the sewer system Vernon’s costs do not include capital costs as they are obtained from the general fund

SEWER DEPARTMENT FY2019/20 Recommended Budget Rate Comparison Location Equalized rate Based on unit cost, surcharges and other applicable fees Quarterly cost per household for usage of 2,200 cubic feet/quarter based equalized rate calculation Manchester – current $5.11/HCF $112.42/Q (FY19) = $450/yr Manchester - recommended (2.0%) $5.21/HCF $114.67/Q (Rec’d FY20) = $459/yr State average Based on 2016 survey* $472/yr for typical homeowner Norwich $7.433/HCF (+$8.69/mo. min chg) Plus $0.643/HCF Upgrade chg $186.36/Q (2018 rate) = $745/yr Stonington $5.37/HCF (variable min chg) $118.14/Q (2017 rate) = $473/yr Bridgeport $5.945/HCF $130.79/Q (2018 rate) = $523/yr Darien $5.54/HCF $121.88/Q (2017 rate) = $488/yr Portland $6.31/HCF (+$30.00 QTR min chg) $168.82/Q (2018 rate) = $675/yr *Rate study has not been updated

SEWER DEPARTMENT FY2019/20 Recommended Budget Thank You