Grid Tied PV Systems – C&I scale Siting and Mechanical Considerations Session 15 Grid Tied PV Systems – C&I scale Three-Phase Systems Siting and Mechanical Considerations October 24, 2018
Session 15 content Grid-Connected PV Systems Design Considerations for Large Scale Systems Mechanical Issues
Learning Outcomes An examination of the impact of size (scale) on photovoltaic system design
Grid-Tied PV – Larger Scale Systems At most power plants, AC electricity is generated in 3-phase format Many industrial customers expect 3-phase AC electricity Three voltage waveforms are produced (transmitted) with the same amplitude and frequency, but 1200 phase differences:
Grid-Tied PV – Larger Scale Systems Design of 21kW 3-phase system -> 21/3 = 7kW per phase Three 7kW inverters VOC(max) = 600V 250V < Vmp < 480V (MPPT range) Modules VOC = 64V ISC = 6A Vm = 55V Im = 5.5A Pm = 305W Temperature range: -30oC < Tamb < +62oC
Grid-Tied PV – Larger Scale Systems Range in module number to meet voltage and temperature conditions: 4 source circuits * 6 modules/circuit * 305W = 7320W 3 source circuits * 8 modules/circuit * 305W = 7320W The second option is preferred Higher voltage, lower current -> higher gauge wire System then has 3 inverters, each with 3 source circuits -> 9 source circuits, each with 8 modules -> 72 modules!
Grid-Tied PV Systems – Larger Scale Systems Schematic of three-phase PV system
Grid-Tied PV Systems – Space Considerations Evaluation of space availability and solar availability Consideration of shadowing on flat roof arrays
Grid-Tied PV Systems – Space Considerations Evaluation of space availability and solar availability Shading profile added to sun motion diagram
Grid-Tied PV Systems – Space Considerations Evaluation of space availability and solar availability Consideration of shadowing on flat roof arrays
Grid-Tied PV Systems – Space Considerations
Grid-Tied PV Systems – Space Considerations Evaluation of space availability and solar availability Four common roof types
Grid-Tied PV Systems – Space Considerations Evaluation of space availability and solar availability Hip roof wind zones
Grid-Tied PV Systems – Space Considerations Evaluation of space availability and solar availability Layout for low wind region
Grid-Tied PV Systems – Space Considerations Evaluation of space availability and solar availability Layout for high wind region
Mechanical Considerations Mechanical issues – another set of disciplines needed to carry out proper PV system design Determination of mechanical forces on system Selection of components, their sizing and configuration, to support (or resist) the forces with safety margins Selection and construction of components that will not deteriorate or degrade unacceptably over life of system Location, orientation, and mounting of PV arrays to be exposed adequately to solar radiation Design of array support structures that are aesthetically appropriate, installable, and maintainable
Mechanical Considerations Mechanical system design Selection, sizing, configuring Design requirements Functional requirements Operational requirements Constraints Trade-offs
Mechanical Considerations Functional Requirements System is capable of handling mechanical forces, pressures, loads Specification of safety factors and margins Specification of maximum allowable stresses Limits on performance Estimation of durability (lifetimes, coatings or protective measures) For tracking systems, determination of motion/hysteresis, operation of drive mechanisms, etc.
Mechanical Considerations Operational Requirements Determination of installation procedures, times, etc. Specification of location of BOS components Specifications for accessibility Development of security measures, protection against theft, vandalism, etc. Specifications for maintenance
Mechanical Considerations Forces & Loads Dead Loads – Weight of materials transmitted to roof or other supporting structure Live Loads – Workers, First Responders, gear Soil, Water, Flood Loads Wind Loads Snow Loads Rain Loads Ice Loads Earthquake Loads
Mechanical Considerations Steps in Wind Load Design Establish the basic wind speed Determine the velocity pressure Determine gust effects Determine pressures Determine wind loads Determine forces on critical members and attachment points Establish safety factors Select appropriate components
Mechanical Considerations Standards and Codes Standards – Specifications for parts, materials, processes; Limitation of number of items, reduction in custom parts Codes – Specifications for analysis, design, manufacturing, installation; Specs for safety, efficiency, performance Professional Societies ASCE ASME ASTM Trade Organizations AISC ASM
Grid-Tied PV Systems – Wind Considerations Flow over airfoils
Grid-Tied PV Systems – Wind Considerations Flow around plates
Grid-Tied PV Systems – Wind Considerations Array pressure and force (back wind)
Grid-Tied PV Systems – Wind Considerations Array pressure and force (front wind)
Grid-Tied PV Systems – Wind Considerations Maximum uplift – slanted roof mounted array