Pre-Deploying Your SPYDERCRANE's Outriggers​

Slides:



Advertisements
Similar presentations
35 FOOT LADDER 3 PERSON.
Advertisements

CRIMPING Introduction
inFire HTC speed Furnace Webinar
University of Wisconsin Eau Claire By: Chaizong Lor
How to Hold the Shot Balance between fingers and palm of hand Balance between fingers and palm of hand Relaxed hand, don’t grip too tight Relaxed hand,
BWST Lecture KIN 436B Spring Transfer Place chair at angle to table Secure Chair Transfer Client Provide assistance as necessary.
1 2 STANDING Steps in Building the Position:
Click on this image to open the full PDF document.
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
Exercise Machines KIN 436B Spring Easy Stand – Height Adjustment Depress buttons to adjust Adjust machine to accommodate client Slide bar so pin.
Strut Jack Operation The TeleCrib® Strut Jack is a removable 8,000 lb jack which fits over the strut body and gives the rescuer a controlled means for.
Motorized Tongue Jack Owners Manual Model SAFETY WARNINGS * Read, understand and follow all instructions before installing and/or using product.
Fitness Circuit Mrs. Arland. Circuit Instructions Take your resting heart rate. A healthy range is between beats per minute. Jog anywhere from.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
STOKES BASKET SOG /08 PIERCE TRACTOR DRAWN AERIALS
Lesson 12.1: Improving Muscular Endurance
This is a sequence shot of a home run by Albert Pujols off Roy Oswalt of Houston in the 2005 NLCS, both side and front views. You can start it by pressing.
Ladders Skill Drills.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
Conservation of Energy r1.04. The Snapshot button is used to capture the screen. The Journal is where snapshots are stored and viewed. The Share.
Fitness Circuit Mrs. Harmer
2- BODY WEIGHT SQUATS: Feet shoulder width apart, hands behind head with fingers locked. Lower body until top of thighs are parallel to the floor. Maintain.
Strength Training- Easy Routines To Do Anywhere, Any Time Jennifer Butcher Fitness Instructor Washington State School for the Blind.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Increase your vertical leap with knowledgeable jump training.
Team Highlander Week 7 Presentation Ideation Initial CAD.
12 Ladders Skill Drills. 2 Objectives Perform one-, two-, three- and four-FF carries. Perform one-, two-, three- and four-FF raises. Tie the halyard.
Garaventa Evacuation Chair Guidelines Presented by Risk Management Mt. SAC Garaventa Evac-Trac CD7.
Set Up for Live Streaming Video This presentation will walk you through the set up and delivery for streaming video of a live event over the internet.
310 Series Basic Leveling Procedure
How to Properly Use a Microscope. Parts of Microscope eye piece tube revolving nosepiece low power objective medium power objective high power objective.
XYZ 1330 Basic Operation Manual
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
EMG Calibration TASK TRAINING Foot/Ground Reaction Forces During Space Flight Peter Cavanagh, PhDNovember 16, 2001 Johnson Space Center, Houston, Texas.
Parson’s Engineering Insert Image Here. Manual handling is the handling of objects in a physical capacity, and the correct techniques to do so. The best.
SHOOTING FUNDAMENTALS.  Eyes – what to look at – front of rim  Feet – Balance – point at rim or angle  Shooting foot – Forward and at middle of rim.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Nevada Department of Corrections Introduction to Restraints
M300, M300N, M300Z (2½ ”–10”) M300A (2½ ”- 4”). Modification Overview  Production began in 2000 under the Hunter name. In 2002 it was produced as the.
Pole Vault Technique & Phase Objectives Pole Vault Technique & Phase Objectives l By: Mark Hannay B.S., M.S. l Regional Chairman: USA Track & Field’s National.
Safe Winch Launching. Before Launch The conditions are safe to fly in. The canopy is not misting I have the correct weak link I know the max winch speed,
SBN Far Detector Installation & Integration
Two Person Low Shoulder Raise and Carry
Foot Strength 3 sets of 10 Towel pull
Motorized Miter Saw.
Excel Basic Operation Manual
Meeting In A Box Set Up Guide
Installing the SIM CARD and Battery
Taper Turning on the Centre Lathe
On-Board Safety Systems
M500, M500N, M500Z 21/2”-10”.
The Crane Control Group
Lifting With Your SPYDERCRANE KBT 5.4
The Turnover Prevention Device
Using the Boom Angle Indicator
Characteristics and Capabilities of the 095-/200-Series SPYDERCRANE
Deploying Your SPYDERCRANE's Outriggers​
Warning and Informational Decals
Information Lesson KBT 2.1
Dust Extractor The dust extractor should always be turned on before cutting any piece of wood. It can be turned on using the green button on the switchboard.
Using the Rated Load Chart
Understanding Variable-Geometry Outriggers
310 Series Basic Leveling Procedure
Understanding the BSOC Flow​
1A. STRETCHES SCORPION STRETCH STRAIGHT LEG DEADLIFT
M200, M200N, M200Z (2½”– 10”) M200A (2½”- 4”).
C400, C400N, C400Z 21/2”-10”.
M400, M400N, M400Z 21/2”-10”.
3Y6P GASOLINE CHAIN SAWS Quick start 2018.
757, 757N, 757Z (2½ ” – 10”) 757A (2½ ”- 6”).
Presentation transcript:

Pre-Deploying Your SPYDERCRANE's Outriggers​ Deployment Lesson KBT 4.2 Welcom to Lesson Topic 4.2. This topic covers how to pre-deploy the outriggers of your 094-, 095-, or 200-Series SPYDERCRANE Micro-Crawler.

Topic Overview and Contents This Lesson Topic (Pre-Deploying the Outriggers) is designed to provide you with an overview of your SPYDERCRANE’s OUTRIGGERS and how they can be DEPLOYED to adjust the DEPLOYMENT FOOTPRINT You will learn about: PRE-DEPLOYMENT and DEPLOYMENT How to PRE-DEPLOY your SPYDERCRANE’s Outriggers It is YOUR RESPONSIBILITY to read and understand the user manuals included with your SPYDERCRANE and the warning decals posted on it This Lesson Topic covers the 094-, 095- and 200-Series SPYDERCRANE This segment topic covers the procedures for pre-deploying the outriggers of your 094-, 95-, or 200-Series SPYDERCRANE.

Learning Objective(s) The desired learning objective for this Lesson Topic is for each student to… DLO 4.2.1: Define OUTRIGGER PRE-DEPLOYMENT. DLO 4.2.2: Identify the procedural steps for PRE-DEPLOYING the SPYDERCRANE's outriggers. There are only two learning objectives for this lesson topic.

Pre-Deployment Before the Outriggers can be deployed into their working positions, they must be PRE-DEPLOYED PRE-DEPLOYMENT is a manual process that can be accomplished by the operator, alone, in less two minutes The DEPLOYMENT PATTERN and DEPLOYMENT STATE are set at the Pre-Deployment The SPYDERCRANE can be switched off, or left running, for the Pre- Deployment You can begin Pre-Deploying the Outriggers in any order you want     Deploying your SPYDERCRANE is a necessary step before you can use your SPYDERCRANE's crane functions.  Deployment means using the SPYDERCRANE's hydraulic system to extend its outriggers into their working positions: lifting the SPYDERCRANE's crawler tracks off of the ground, leveling the body of the SPYDERCRANE, and creating a stable base for the SPYDERCRANE by maximizing its Deployment Footprint.  Before you can hydraulically DEPLOY your SPYDERCRANE's outriggers, you must manually PRE-DEPLOY them into their working configurations.      In the previous topic, you learned about the various DEPLOYMENT STATES and DEPLOYMENT PATTERNS that you can configure your SPYDERCRANE's outriggers to. In this topic, you will be shown the step-by-step procedure for configuring those outriggers for deployment, or how to pre-deploy them.      This topic focuses on the 095- and 200-Series SPYDERCRANE, but, there are only slight differences in pre-deploying the outriggers of the 094-Series. The pre-deployment procedure can typically be accomplished by a single operator in under 2 MINUTES. Once you have parked your SPYDERCRANE at the lifting site where you want to deploy it, you can begin pre-deploying its outriggers.      You can turn off the SPYDERCRANE's engine for this procedure. 

Pre-Deployment Steps: Set the Outrigger Deployment Angle The Deployment Pivot of a URW295, once the two Optimum Angle Indicators are facing each other, re-insert the Pivot Pin to lock the Outrigger to its Optimum Deployment Angle Go to one of the stowed Outriggers, find the Deployment Pivot, and pull the PIVOT PIN With the pin removed, slew the Outrigger until the OPTIMUM ANGLE INDICATOR on the Deployment Pivot is facing the one on the Outrigger Once the Angle Indicators are lined up, re-insert the Pivot Pin into one of the two holes on the Outrigger to lock the Outrigger to the Optimum Deployment Angle A URW095S with Outrigger #3 locked to the Optimum Deployment Angle     This procedure assumes you will be deploying the SPYDERCRANE using the OPTIMUM DEPLOYMENT PATTERN and MAX-EXT DEPLOYMENT STATE. Go to one of the stowed outriggers (it doesn't matter which one), find the DEPLOYMENT PIVOT, and pull the PIVOT PIN. With the Pivot Pin removed, you can pull the outrigger and slew it on its Deployment Pivot. Continue to slew the outrigger until you line up the OPTIMUM ANGLE INDICATOR (the yellow arrow decal) on the Deployment Pivot lines up the Optimum Angle Indicator on the outrigger.  Insert the Pivot Pin to lock-in the Deployment Angle.  The UPPER OUTRIGGER BASE has two holes to pass the Pivot Pin; once you have lined up the indicators, if the pin what go through one hole, try the other one. 

Pre-Deployment Steps: Set the Knee Go to the Outrigger Knee and unclip and pull the OUTRIGGER KNEE PIN to release the Knee With the pin removed, rotate the Lower Outrigger at the Knee until the pin-hole at the top of the Lower Outrigger lines up with the MAX-EXT hole at the end of the Upper Outrigger The GAS PISTON will support the weight of the Lower Outrigger and push the it to its rotation limit; you might need to push down on the Lower Outrigger to get it to line up Re-insert the Outrigger Knee Pin and safety-clip it; it does not matter if the safety clip lanyard wraps over the top of the Outrigger, or under A URW095S with the Knee of Outrigger #3 set to MAX-EXT The Outrigger Knee has THREE positions: STOW, NOT-MAX-EXT, and MAX-EXT     Once you have locked in the Deployment Angle, you can extend and set the Outrigger Knee.  Un-clip and pull the OUTRIGGER KNEE PIN out of the STOWED HOLE to release the Outrigger Knee. Pull the LOWER OUTRIGGER by its handle to rotate the Outrigger Knee until the hole in the Lower Outrigger lines up with the MAX-EXT HOLE on the Upper Outrigger.  Insert and safety-clip the Outrigger Knee Pin through the MAX-EXT Hole to lock the Outrigger Knee into its MAX-EXT position. The GAS PISTON connecting the Upper and Lower Outriggers is there to help support the weight of the Lower Outrigger when you rotate it into place. 

Pre-Deployment Steps: Set the Ankle Extension Go to the Outrigger Ankle and unclip and pull the ANKLE EXTENSION PIN to release the Ankle Extension Grasp the OUTRIGGER FOOT from the bottom and pull the entire Ankle Extension out until it stops; this is the MAX-EXT setting Re-insert and safety-clip the Ankle Extension Pin to lock the Outrigger Ankle Extension to MAX-EXT Once all of the pins have been re-inserted and safety-clipped, Outrigger #3 will be set at the Optimum Deployment Angle and the MAX-EXT Deployment State     Once you have locked in the Outrigger Knee, you can extend and set the Outrigger Ankle Extension. Un-clip and pull the ANKLE EXTENSION PIN out of the MINIMUM EXTENSION HOLE of the LOWER OUTRIGGER. Grasp and the OUTRIGGER FOOT from the bottom and pull the ANKLE EXTENSION out of the OUTER BOX of the Lower Outrigger until it hits the stops. Insert and safety-clip the Ankle Extension Pin through the MAX-EXT Hole to lock the Outrigger Ankle Extension into its MAX-EXT position. The Ankle Extension has multiple setting, but, it is MAX-EXT when fully extended

Pre-Deployment Steps: Set the Ankle Extension Repeat Steps 1-9 to set the SPYDERCRANE’s Deployment Pattern to Optimum and Deployment State to MAX- EXT Repeat steps 1-9 on the remaining outriggers to finish the pre-deployment Repeating Steps 1-9 for the remaining three Outriggers will set the SPYDERCRANE to the Optimum Deployment Pattern and MAX-EXT Deployment State