Harcourt Sands Enquiry by Design Findings 2 August 2012.

Slides:



Advertisements
Similar presentations
The Southeasts Eco-Friendly Beach Get-away. Site Description 18 miles from Savannah, Georgia 4 hours from Atlanta Population of 4, square miles.
Advertisements

A Presentation by Alec McHarg on Regional and Urban Sustainable Issues… As part of a sustainable and Socially Cohesive Society… Deep in our culture is.
The Liberty District Workshop Sacred Cowshands off! Significant historic structures Mildred Terry Library The Liberty Theater Places of Worship Ma Rainey.
Office of Planning, Coastal Zone Management Program, Rural Policy & Best Practices Project May workshops: what’s important about rural? balance & contrast.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Sustainable Design Guide SPD Rebecca Wren Spatial Planning Officer.
Cardenden Eco Town Andy Liddell Technical Manager Banks Developments.
Urban Design PrinCIPLes UrbAn DeSigN Done By : Majed Al-madhoun 2010.
Environmental life cycle assessment. Why Sustainable Construction?  Social progress, which recognises the needs of everyone  Effective protection of.
GEOG 442 Day 19: Commercial and Retail Analysis, and Community Facilities.
AT CHURCH STRETTON SCHOOL Shropshire Council Reference : CSTR 014 & CSTR 018.
Once upon a time …. Pyrmont as new urbanism “The new urbanist approach can be applied at many scales, from individual subdivisions to entire regions.
ENVIRONMENTAL OBJECTIVES Eco-Village Development By: Nachinji Mumba ( ); Lucie Truquin ( ); Richard Manning ( ); Peter Kilpatrick ( )
Mumbai and Salford – what are the potential impacts of future change? Objective: To be able to explain the potential impacts of future change in Salford.
Building for Life Bonnie Kwok & Tracy Mann 10 October 2014 Information extracted from Green Cluster Workshop Document August 2013 and NW Cambridge Design.
STARTER ACTIVITY In pairs, discuss why you think we need more homes in the UK. Try to think of at least four reasons. Where do you think these new homes.
Tiddington 4 Village Plan Survey Results – Roads Two thirds of respondents wanted a controlled crossing of the A418 in Tiddington, with the very large.
Nottingham’s Cycling Action Plan to 2015 Keith Morgan Transport Strategy Nottingham City Council.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Ioannis Ch. Saridakis Chemical Engineer ELOT, Hellenic Organization for Standardization Initial meeting, Athens, 11 May 2010 AgriTourNet /ELOT May 2010.
Official Plan Review - Phase II CITIZEN REFERENCE PANEL.
VICKY MARTIN PORTONOVO Heartlands The creation of a landmark World Heritage Site attraction and visionary social tourism enterprise Vicky.
Forgebank – Environmental cohousing project Jan Maskell Director of Process Lancaster Cohousing.
Urban Design Goals: Produce a high quality living environment for all residents. Clarify and enhance the relationship between new housing development and.
Springfield Zoning Ordinance Revision Project Naismith Basketball Hall of Fame April 25, 2006 Planning and Economic Development Office Sponsored by a grant.
GROUP MEMBERS: Ramos Ivett # Lugo Valmore #
Phase 1 Consultation Results 23 rd September 2014.
Prepared by: ROBA KANDEEl بسم الله الرحمن الرحيم.
AYU FARHANA CHUAR YEJUAN FARAH HANIN MOHD NAIN NAJIHAH AZMI SITI NADIAH ABDUL RAHMAN SURAYA HANI MOHD YUSOF.
1. Hybrid Planning Application Detailed Application = Stadium and related infrastructure Outline Application = Enabling development sites 2.
F O R W A R D L A P O R T E What are the city’s top 3 economic development priorities? n=300.
Tourism on Zanzibar East Africa The island’s economy has suffered from a decline in the spice trade, no industrial development and a growing population.
Sustainable Cities. If our cities in the future are to be pleasant and safe place to live we need to solve problems like … Traffic Pollution Use of derelict.
Green Infrastructure & Movement Networks Dick Longdin: Randall Thorp CAMBOURNE Lessons to be learnt.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
EDDIE CONROY County Architect MODEL / CITY – HORIZON 2020 (TALLAGHT SMART CLUSTER)
Urban Sprawl.
Shenstone Neighbourhood Plan Working Groups launch event 18 th June 2013.
Woodford Neighbourhood Forum Questionnaire Preliminary Analysis of Results.
Name ________________ Unit 6/P7 – Environmental Implications (what do developers need to take into account when building) Noise Nearby Residents Hours.
Councillor John Beesley Leader of Bournemouth Borough Council.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
STOUR AREA COMMUNITY COMMITTEE 17 July PURPOSE AND CONTENT OF PRESENTATION To provide an Area based analysis to underpin the State of The District.
‘Delivering the vision for Morden town centre’ consultation 30 Sep – 11 Nov 2015.
11,000 new council homes by 2043, 1,500 by 2018 Build the right kind of homes to meet a range of needs Build high quality and well integrated homes Meaningful.
City of Redmond: Northwest Redmond & U.S. Highway 97 Plan - October 11, 2006 What Makes a Great Neighborhood.
Urban Design and Livability Bruce Monighan AIA Urban Design Manager, City of Sacramento City of Sacramento Planning Academy March 16, 2016.
Green College Initiative Jem Morris. Green College Initiative The College has created a ‘Green College’ group that meets at least every 8 weeks The group.
COMMUNITY WORKSHOP OUTCOMES Nov – Dec Three workshops : 206 participants 27 Nov 2014, Monash Country Club 29 Nov 2014, Monash Country Club 3 Dec.
Landscape Design Stakeholder Meeting Palo Alto Regional Water Quality Control Plant 1.
Planning Healthy Neighbourhoods Presenter: Stephanie Knox.
C ENTRAL E STUARY P LAN A V ISION F OR O AKLAND’S W ATERFRONT Central Estuary Plan A VISION FOR OAKLAND’S WATERFRONT Specific Plan and Environmental Assessment.
HAVE YOUR SAY! Six week consultation period 15th February - 28th March 2016 DRAFT UTTOXETER NEIGHBOURHOOD PLAN.
THE DEBATE “The 2012 Olympics in London is a waste of taxpayer’s money and will only benefit those who live in London”
Page 1 Environmental Mainstreaming in Development Projects Cairo, March
2015 CLARENDON TOWN PLAN Barbara Noyes Pulling Rutland Regional Planning Commission.
1 Neighbourhood Plan Questionnaire Results May 2016.
Earswick Neighbourhood Plan Residents Survey No 2
Residents’ questionnaire survey June 2017
Photo credit: Wu Wenbin
What are sustainable communities?
Future Village development key requirements
Darlington Eastern Growth Zone.
What are sustainable communities?
Better mobility for older people
Sandon Neighbourhood Development Plan and Questionnaire Results
New Southwark Plan: Area Visions and Site Allocations Consultation
Cupar North Sustainable Cupar
Residents’ questionnaire survey November 2016
ELLINGHAM PARISH COUNCIL NEIGHBOURHOOD PLAN
Presentation transcript:

Harcourt Sands Enquiry by Design Findings 2 August 2012

Presentation Format Introduction- Kim Slowe Economy & Tourism - Christopher Scott Ecology & Landscape- Liz Simes Sustainability- Robert Letts Design & Architecture- Sue Atkinson Other Issues/ZeroC Commitments -Kim Slowe

Economy & Tourism Ideas Tourism protected and the facility replaced in total Realisation that housing was the enabler Public access to the site Investigate the possibility of hotel provision on site Invest in second leisure tourism offer, i.e. Tennis Academy or Isle of Wight Museum No affordable housing on site accepted Protection of existing landscaping Third offer or small area for niche accommodation such as yurts, tree houses etc.

Economy & Tourism Conclusions Tourism protected and the facility replaced in total Realisation that housing was the enabler Public access to the site Investigate the possibility of hotel provision on site Invest in second leisure tourism offer, i.e. Tennis Academy or Isle of Wight Museum No affordable housing on site accepted Protection of existing landscaping Third offer or small area for niche accommodation such as yurts, tree houses etc.

Landscape, Trees and Ecology The Site The site forms part of the green backdrop to the beach jewel of this part of the Island Protection of existing trees (using individual trees as features) hedgerows and shrubberies Retention of the existing green buffer zone to the beach frontage Concerns raised about the removal of trees along the frontage Retain the character of the existing open spaces and meadows around the chalets in the new layout as a park space to be enjoyed by all Ensure that the key views out across the Solent can be enjoyed throughout the public realm Provision of a vibrant public realm and a vibrant community with variety Provision of a new homeowners pack explaining the local ecology of the site, the beach and Appley Park (especially seasonality) and issues surrounding domestic cats etc To celebrate the existing wildlife of the site, through: integration of the existing wildlife within the new development Education / interpretation trails Provision of areas for outdoor classrooms / field study centre and bird watching Visitor centre with a ranger function who can explain the local ecology and the heritage of the forts

Landscape, Trees and Ecology Provision of allotments to address existing waiting list. Experience at PAN suggests that the standard plots could be reduced and could include provision of raised beds. Potential to provide a water feature within the site Creation of a destination by linking the site with Appley and Puckpool Parks and provision of obvious pedestrian routes from Appley through the site to Puckpool Inclusion of chalet signs into the development Site to be accessible by foot To consider the removal of the existing fence line barrier between the site and Puckpool Park

Other site issues raised Replacement Swimming Pool accessible as a local resouce Consideration of a bandstand Concern about parking in general Concern about drainage and maintenance of Puckpool Hill Discussion on building heights. Predominantly 2 storey, but discussed taller buildings set down in the lower, more secluded parts of the site Provision of a convenience store which could be run as a co-operative Utilise the existing Lodge on the esplanade as a marker into the site Potential to provide look out building as an attraction Mix of housing types Landscape, Trees and Ecology

Puckpool Park: Potential to remove vehicular and pedestrian conflicts within the Park through the provision of a new car park within the site. This would also address existing visibility concerns. Provide a gateway to the park Park to be made an island feature Concern that the existing buildings in Puckpool Park are in decline Consideration of an outdoor performance space connecting with the site Landscape, Trees and Ecology

Sustainability – Wider Issues Island energy independence Diversity of design for all types of resident Full time residents Local labour use Need for exemplar low energy/carbon design Quality of life Reduced environmental impacts on the site Protect existing species (red squirrels)

Sustainability- General Issues A permeable layout not gated community High quality long lasting designs wanted Affordability of homes wanted Flexibility as people get older important Excellent public space Better travel connections (bus /cycle routes) Discussed a community space (running issues) Live website for good community connection

Sustainability – Design Issues Low energy / low carbon design preferred Lower running costs essential Passive design features (good insulation) Sustainable construction / local labour A range of renewable technologies (not wind) PV, Heat pumps, Solar Thermal, Biomass stoves with back boilers all suitable Rainwater recycling liked

Use General Acceptance around the design table that Tourism was an unlikely eventuality given failure of British Tourism since credit crunch. However Hotel proposal was warmly welcomed. Suggest adding spa facilities to make up for loss of pool. There was also mention of Warners at Bembridge and questions as to why they made such a success of it? Given a largely residential use for the site, the design table wished to see a wide range of housing, large to small and lifetime where possible. Down sizing was seen to be a big issue locally with lack of small housing a problem It was generally recognised that the site should provide high quality housing and affordable to be provided off site. All felt that the homes should be offered to Islanders first to try and avoid second homes lying empty All would like some kind of local or convenience store There was some dismay that we could not currently find an interested Care Village operator – Lifetime homes were felt to be a good compromise. Architecture & Design

Amount Design table agreed that higher densities would be acceptable around the back of Puckpool Park. It was felt that terraces around squares, such as those seen in Harrogate and London would be appropriate Lower densities and higher value areas were seen as the higher parts of the site – this was welcomed as it meant less impact on neighbours views Numbers were mentioned – and on past experience rpa reported 200 – 250 would be more likely than the 100 mentioned. Architecture & Design

Layout Generally felt that the development needed a heart The idea of a village square was welcomed – but one that should be landscaped with mature trees providing the focal interest, rather than concrete and cars. There was a definite feeling that cars parked on streets should be avoided. Cyclists and pedestrians should be paramount and safe. A link between Puckpool Hill and the beach would be welcomed – this was seen as part of a site wide foot path network, providing a circular route back through Appley Park A green space for growing food was suggested There was a general nod towards providing an alternative route for dog-walkers along the beach frontage through to Puckpool, but also to provide alternative circular routes. Architecture & Design

Scale and Appearance Feelings were split between modern and traditional but erred in favour of traditional Cutting edge modern was felt to be a step too far for most islanders, but modern with traditional materials may be be an acceptable compromise It was finally agreed that traditional Ryde was too urban for this site, as it is semi rural in nature and perhaps more applicable to the outskirts of Seaview. It is a large site and it was felt that more than one style can be accommodated, depending upon its location within the site and the appropriate density Architecture & Design

Other Issues Avoiding 2 nd Home Ownership Affordable Housing On/Offsite Sustainability Credentials Providing housing accessible for the less mobile/elderly

ZeroC Commitments Put in place a project website in the next month to share documents/information and to assist public interaction Address the issue of limited public transport & work towards improving links Commit to using, wherever possible, local labour and materials Commit to strict covenants to protect the quality of the development

ZeroC Commitments Put in place an interactive residents website and install high speed broadband/tablet computer in every home Put in place an electric car/bike club to discourage second car use Make provision for some subsidized commercial space in later phases for a community shop

ZeroC will continue to engage with the public and we will continue to modify/update our proposals in response to considered and viable public input