Power Plant Losses - Examples from Pakistan Mansoor Ali Khan General Manager Hamid Mukhtar & Company (Pvt) Ltd. Karachi Insurance Institute December 4th.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Human Performance Improvement Process
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
Richmond House, Liverpool (1) 26 th January 2004.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
Power Plant Construction and QA/QC Section 2.3– Steam Generators
COMBUSTION CONTROL IN BOILERS 1 Dept. of Electronics & Instrumentation, Narayana Engineering College, Nellore.
PRODUCTIVITY MANAGEMENT IN ASELSAN Tuncay İBİŞ ASELSAN A.Ş. Energy Manager Facilities and Support Services Director.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
Green Eggs and Ham.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Name Convolutional codes Tomashevich Victor. Name- 2 - Introduction Convolutional codes map information to code bits sequentially by convolving a sequence.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
1 ENERGY Gr. 5 Science: Conservation of Energy & Resources BY Full Name Science Unit PowerPoint Outline by Miss Berndl 2009.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Presenteren wij ………………….
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
VPN AND REMOTE ACCESS Mohammad S. Hasan 1 VPN and Remote Access.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Energy Generation in Mitochondria and Chlorplasts
By Rasmussen College. 1. What majors or programs do you offer? 2. What is the average length of your programs? 3. What percentage of your students graduate?
CpSc 3220 Designing a Database
Fire Risk In Power Facilities. Introduction Fires in Power Plants or Distribution Facilities have occurred World Wide Many have resulted in Plant Shutdowns.
Presentation transcript:

Power Plant Losses - Examples from Pakistan Mansoor Ali Khan General Manager Hamid Mukhtar & Company (Pvt) Ltd. Karachi Insurance Institute December 4th

Outline 1. Introduction to Power Plants 2. Common Types of Failures 3. Examples of PP Losses Concluding remarks 2

A good presentation should be like a mini skirt. Short enough to arouse interest and long enough to cover the subject TED

Accidents dont happen – They are caused Thats why loss adjusters have jobs! 4

Power Plant Prime Movers Steam Turbines Gas Turbines Hydro Turbines Wind Turbines Internal combustion engines Solar Photovoltaic cells Nuclear Reactors 5

Common Causes of Failure Gas, Steam & Hydro Turbines Ruptures, High Cycle Fatigue, Blade failures, Design failures Wind turbines Lightning, Electrical Fires, Gearbox failures, Remote locations IC Engines Overheating, Lubrication failure, High speed equipment (Turbochargers), Fire Generators Ruptures, Short circuits, Explosions, Fire Transformers Explosion, Fire,Insulation failures Boilers Explosion, Fire 6

Business Consequences Reduces capacity available to Grid Delays in construction Loss of revenue Delayed startup Business Interruption Losses to Insurers / Reinsurers Impact on Renewal Premiums 7

Power plant Losses in Pakistan IPP Gas Turbine Compressor Blade & Shaft damage – MBD/ BI Faulty design of air intake filter system. Blade fouling and damage to 9 stages Property damage & BI Claim US$ 10.5 m IPP HFO Diesel Generator – Alternator Damages – EAR/ DSU Design fault in Alternator Base foot design COD delayed 6 months Loss paid under Warranty by OEM 8

50 Mw Wind Power plant under construction Turbine Rotor blade damaged due to sudden wind/ rainstorm. Turbine Rotor assembly damaged during lifting operation for mating with Nacelle on Mast 730 Mw Steam Turbine Plant Plant site submerged due to overflow from breached irrigation canal during heavy rains Property damage and BI Claim US$ 50 m 9 Power plant Losses in Pakistan

130 Mw Hydel Power Project - Flood Loss 2 Project sites – Weir Site and Power house Connected by 9 tunnels Loss occurred due to unprecedented rainfall and flooding in July 2010 Claimed loss Rs 2.3 billion (US$ m) Still not restored eg. Tunnels blocked with debris Many Local and Chinese Workers buried under debris 10

Weir Site Power House Site 11

12 Weir Site - before flood Camp Site

13 Weir Site, Stilling Basin and Campsite washed away

Powerhouse building Covered with debris 14

Stilling basin Filled with debris 15

Power House Campsite Buried Under Debris 16

Tunnel exit Exit blocked by Debris 17

IPP CC Gas Turbine Rotor damage – EAR / DSU Rotor blades, Stator Vanes, Rotor shaft damage COD delayed 120 days Property damage Claim US$ 17.5 m DSU Claim US$ 3.1 m Human Error during commissioning 18

GT-1 Control Cabin GT-2 Control Cabin 19

Thrust collarRotor Blades 20

Damaged Rotor blade tips 21

Damaged Stator Vanes 22

IPP Steam Turbine Rotor damage – MBD/ BI Metal chipped off Bearing thrust collar journal Property damage – Within deductible Business Interruption Claim US$ 400 k Out of service 95 days 23

Chipped of metal from Steam turbine rotor bearing thrust collar 24

Hydro Power Flood Loss Run of the river Hydro Power project 96 MW being constructed on the Indus River. Overtopping of Coffer Dam Turbines, Generators, LV and HV switchgear, Panels etc. were submerged in Water for many days. Property Damage claim is approx. USD 55 million No DSU cover 25

Unopened equipment submerged 26

CC Gas Turbine IPP 175 Mw IPP Mw Gas Turbine & 64.2 Mw steam turbine Recurring combustion nozzle damages during commissioning Cause was unsuitable specifications of Fuel gas LEG 3/96 cover was available – Design faults covered COD delayed by 13 months 27

Burnt nozzle assemblyNozzle cover damaged Damaged flow sleeve 28

Lessons to be Learnt Return period basis needs to be reviewed Safe Storage of equipment and materials during erection Periodic risk surveys during Construction & Operations Awareness of LEG coverage Awareness and understanding of DSU/BI basis for assessment Use of specialists to assist with complex losses Creating shared inventory pool of critical equipment Owners investing in HR training and development 29

THANK YOU 30