Review: S TANDARD P ROTOCOL FOR M EASUREMENT OF F AN AND C OOLING S AVINGS FROM C OMMERCIAL -S ECTOR P ACKAGED R OOFTOP HVAC U NITS Regional Technical.

Slides:



Advertisements
Similar presentations
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Advertisements

Evaluate when y = 3 a.) 8y = b.) 39 = y c.) y + (-6) = d.) 14 – 2y =
Money Creation Chapter 32 McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Weather Discussion Tropical Storm Aletta (3am on Tuesday)
Money Creation 15 McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
$100 $400 $300$200$400 $200$100$100$400 $200$200$500 $500$300 $200$500 $100$300$100$300 $500$300$400$400$500.
16.2 Concentration of Solutions
HIGHER GRADE CHEMISTRY CALCULATIONS Radioactivity and Half-Life Half-life is the time taken for half of a radioisotope to decay. This value is constant.
Welcome to Who Wants to be a Millionaire
Craft Fair Sales The students at the JH Williams School Craft Fair are selling necklaces, bracelets, and rings. Harry counted the necklaces and found that.
Category Category Category Category Category.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
The Real Cost When you save to make a big purchase, be sure to consider the sales tax you will have to pay. Have you ever paid sales tax?
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Example:                                         Calculate how many squares altogether (2 x 5 = 10)
Decimals 10ths and 100ths.
Your panelists Benefits, Technologies & Services: Mike Carter and Mark Farrell, Energy Engineers.
Over 50 Years of Regional Service and World-Class Quality United Air Conditioning is a client-focused, family-owned air conditioning company serving.
PNW Rooftop Unit Working Group - RTUG – Rooftop Unit Research Project Phase 4 August 12, 2010.
Teds Big Boy Restaurant 5000 People were surveyed to determine if there is enough demand for a new Teds Big Boy Restaurant in the west side of town.
15 Money Creation This chapter explains how the banking system creates money and increases the money supply. The balance sheets of the banks are used.
Surface Area of Irregular Shapes Volume of Irregular Shapes
Created by Mr. Lafferty Maths Dept.
Practical (case study) Forecasting Tropical cyclones 1.Son-tinh (1223) 2.Kai-tak (1213) Check your TC track forecast.
Practical (case study) Forecasting Tropical cyclones Regional Training Workshop on Severe Weather Forecasting and Warning Services (Macao, China, 8-13.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
Category Heading Category Heading Category Heading.
By: Alissa Rosado Ministerio Hispano Fe. Logo Green Option.
Ag Stock Watering Tank UES Measure Update Regional Technical Forum April 16, 2013.
SELECTBOARD BUDGET Budget Change: 2014 to 2015 = ($76,393) or -3.94% 2011 to 2015 = ($49,648) or -2.60%
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
CAREERS IN CONSTRUCTION ACS Industry areas –Housing –Commercial –Civil and engineering Qualification levels –Trade –Technical –Professional.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Pass out calculators. Warm Up Questions: 1.What is the solution to the system of equations shown below? Y = 2x – 2 8x + 2y = What value of n makes.
“To act as the worldwide network for knowledge exchange of joining technologies to improve the global quality of life.” TMB Salle du Conseil Friday 14.
Reporting and Interpreting Owners’ Equity
Unit 14 Assessment Objective Three. Unit 14 Assessment Objective Three.
F o r m u l a M a s s. F o r m u l a a n d M o l e c u l a r M a s s z E v e r y M o l e c u l a r m a s s i s a f o r m u l a m a s s. z N o t e v e.
Sunset Date Extension: Manufactured Homes HVAC Measures Regional Technical Forum November 18 th, 2014.
Will CO2 Change What We Do?
Northwest Power and Conservation Council Preliminary Cost-Effectiveness Energy Star Tier 2 Vending Regional Technical Forum 19 September 2006.
Commercial Tank Water Heaters Out-of-Compliance (OOC) UES Measure Recommendation Regional Technical Forum November 19, 2013.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
D RAFT S TANDARD P ROTOCOLS February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
Commercial Showerhead UES Measure Update Regional Technical Forum Staff Update June 18, 2013.
RTU Measure Preparation for Review as Standard Protocol Staff Request for Authorization of RFP Funding from the Regional Technical Forum 28 June 2011.
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
Northwest Power Planning Council The Fifth Plan’s Draft Conservation Resource Assessment Summary of Results To Date April 8, 2003.
September 30, 2003Conservation Resources Advisonry Committee 1 Commercial Sector Measure Quest Sources & Findings.
RTU Savings Research Project RTU Savings Research Project: Findings and Recommendations Regional Technical Forum February 3, 2009 Mark Cherniack Howard.
Of moderated conference calls on energy efficiency Utility Brown Bag Series BPA’s Rooftop Unit Service Pilot Jan 29, to 2 p.m. (PST) Facilitator:
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Northwest Power and Conservation Council 1 Distribution System Efficiency Potential & Conservation Voltage Reduction Power Committee April 2009.
Northwest Power and Conservation Council Small Office Savings Analysis Package w/ Lighting Measures Only RTF March 25, 2008.
RTUG Jan 2010 PNW RoofTop Unit Working Group - RTUG – Regional RTU Savings Research presentation to PNW Regional Technical Forum January 5, 2010 RTUG Jan.
S TANDARD P ROTOCOL FOR M EASUREMENT OF F AN AND C OOLING S AVINGS FROM C OMMERCIAL -S ECTOR P ACKAGED R OOFTOP HVAC U NITS Regional Technical Forum March.
Regional Technical Forum Future Funding Discussion March 19, 2014 RTF PAC Presentation.
PNW RoofTop Unit Working Group - RTUG – RTU Savings Research Project Phase 3 December 15, 2009.
A Reliable but Simplified Method for Measuring the Savings from Advanced RTU Control Retrofits February 13, 2013 Presentation to: RTF Commercial Rooftop.
G UIDELINE R EVISIONS – R ELEASE February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
LED Traffic Signals Review of Existing Deemed Measures Regional Technical Forum August 4 th, 2009.
Northwest Power and Conservation Council Small Office Savings Analysis RTF August 30, 2007.
What’s Next in Lighting? Overview of Seventh Power Plan Findings on Commercial Lighting Conservation Potential.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTUG January 19, 2010.
February 12 – 19, 2018.
מדינת ישראל הוועדה לאנרגיה אטומית
and Resource Management
Fractions Year 6+
Resource Adequacy Technical Committee Meeting April 22, 2010
Name __________________ Class ___________________
Presentation transcript:

Review: S TANDARD P ROTOCOL FOR M EASUREMENT OF F AN AND C OOLING S AVINGS FROM C OMMERCIAL -S ECTOR P ACKAGED R OOFTOP HVAC U NITS Regional Technical Forum February 14, 2012

RTU Savings/MWa – NPCC 6 th Power Plan

RTUs in 6 th Power Plan…

NW Commercial Building Stock Assessment(CBSA) RTU counts-6 th Power Plan AREABIN Average of Count Package RTU Units Average of Pack HVAC Tons Faction of PNW Floor Area Building Count Fraction with RTURTU Count 1. <5, % % 118, ,000-20, % % 151, ,000-50, % % 74, , , %581635% 33, , , %494630% 30, >500, %1755% Grand Total % , % floor area <50kSf Population 64% of buildings <6 tons 79% of buildings <10 tons

PNW RTUs an aging fleet… Age categoryUnder 5 tons5 to 10 tonsOver 10 tons 44%36%20% 0 to 417%30,00024,000 14,000 5 to1032%56,00046,000 26, to 1935%62,00050,000 28, years16%28,00023,000 13,000 51% = 204,000 of the units have been on the roof for over a decade!

RTU Protocol Issues Raised Measure exclusions: which measure are excluded even though not tested? Pre and Post upgrade scheduling: can we do Pre in August and Post in May? Multiple annual site review to better understand confidence interval Cost to implement the protocol needs closer review: cost estimate based on mature program and lessons learned Calculator is for a single unit; sampling protocol is for program evaluation purposes, not unit savings calculations All protocols and calculators will need ongoing RTF support (2013 work plan/budget)

RTU Protocol Confidence Limits Limited Sites Confidence limits are normalized relative to annual energy Confidence limits highest for metering periods starting in late June to mid-July Confidence limits of +- 5% are achieved with metering periods starting in late May and early August

Assessment of 90% Confidence Intervals (West)

Assessment of 90% Confidence Intervals (East)

Nominal 90% Confidence Intervals (East) (Actual coverage rate around 50%)

Nominal 90% Confidence Intervals (West) (Actual coverage rate around 50%)

RTU M&V Field Protocol Purpose Definition of Key Terms Required Knowledge and Skills of Practitioner Required Data Logger Commissioning o One Time Site Measurements and Descriptions o Data Logger Measurements o TMY3 Weather Data Savings Estimation Steps Estimate of Typical Measurement Cost Relationship to Other Protocols and Guidelines Sampling Procedure for Program Evaluation

Purpose Establishes a method by which annual electrical cooling and fan energy use and savings (kWh) can be estimated for a commercial packaged rooftop unit (RTU) optimized for performance including in-field data collection requirements/methods, annualized use/savings calculation method

Definition of Key Terms Baseline Pre Post Commissioning: –data logger/storage/comm equipment –RTU post-upgrade Upgrade Measures

Required Knowledge and Skills of Practitioner Appropriate electrical and related safety procedures Knowing the protocol and calculator Equipment inspection: control points, schedules, cooling stages Logging equipment selection and use Measurement equipment commissioning Ability to interpret results

Required Data Logger Commissioning Communications & data storage True power sampling with current 3-minute interval If site temperature measurement is used, verify temperatures with 2 nd instrument If supply air temperature is used, place away from supply air plenum walls Full data set should be tested immediately Onboard data storage up to 70 3-min interval

Key Measurement Considerations Outdoor air temperature on site or nearby NOAA weather station Supply air temperature optional: for diagnostics, not calculator Timing of measurement: 4 wks pre/4 wks post pre: 3 rd wk May-June; post: 1 st wk August-Sept Timing of retrofit: July

Savings Estimation Automated calculator with true power/temperature data only Sequence of Calculations: Compute the Normalized Annual Consumption (NAC) for pre/post data Energy Savings Calculation Sequence Electric Load Shape Calculation Sequence Demand Savings Calculation Sequence

Estimate of Costs Mature case with lessons learned Expedited approach using NOAA weather for 2 RTUs in same panel = $1250 or $635/RTU Comprehensive approach site weather, 3 RTUs single roof = $2,450 or $817/RTU

Annualized Energy Use / Savings Calculator

Next Steps February 16, 9am-12pm RTUG follow up meeting to Feb 14 RTF review RTF members invited to participate Planning to make final protocol recommendation at March RTF meeting