ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011.

Slides:



Advertisements
Similar presentations
Mid West Regional Authority Greenhills hotel, Limerick Energy Solutions for Sustainable Development Renewables for Sports Facilities.
Advertisements

September Contracting Models Louise Simmonds TV Energy Contracting Models.
Sponsored by: Key Stakeholders Workshop 9-10 March Matthew Woodcock Forestry Commission England Key Stakeholders Workshop.
September Wood to Warmth – Heat Networks Michael Beech TV Energy.
September Wood to Warmth – Bioenergy Appliances Michael Beech TV Energy.
How woodheat can be cost effective – good practices Key stakeholders Workshop New Forest, England, 9-10 March, 2011 Jyrki Raitila VTT Technical Research.
Sponsored by: September Applying CEN Standards Prepared by Louise Simmonds TV Energy.
Wood to Warmth – Biomass Fuels and Heat Energy Calculations
WOOD FUEL – KEEPING THE CUSTOMER WARM 6 TH March 2010.
Planning and regulations relating to biomass installations 18 th September 2009.
Sponsored by: Biomass Implementation Workshop 29 March Matthew Woodcock Forestry Commission England Renewable Heat Incentive.
Wood to Warmth – Case Studies Alison Wilshaw, TV Energy 16 February,
September Wood to Warmth – Fuel Delivery and Storage Michael Beech TV Energy.
Successful small and medium scale wood heating Key stakeholders Workshop New Forest, England, 9-10 March, 2011 Jyrki Raitila VTT Technical Research Centre.
Sponsored by: September Manufacturing Wood Fuel Prepared by Louise Simmonds TV Energy.
Dr. Nike Krajnc Slovenian forestry institute
Woodfuel supply chains in Austria. Woodfuel supply chains 1. Developments in Styria 2. Woodfuel supply chains 3. Biomass Trade Centres.
& sponsored by: Led by the 22 March 2011 Support available.
Case Studies - March Englefield House
Woodburner at Richard Harnett. Decisions, Decisions….. What are the choices? Waste management CHP Wood burning plus other biomass materials.
Introduction to Alternative Heating Systems South West Chicken Association, April 2013.
Legal Framework for Bioenergy in Germany Sebastian Kilburg THE FUTURE OF BIOFUELS IN LITHUANIA: ISSUES AND OPPORTUNITIES Vilnius, November 8 th 2007.
©FEC Services Ltd 2007 Low Carbon Technologies for Greenhouse Horticulture What are the options for Growers in the UK? Chris Plackett FEC Services Ltd.
Biomass Heating Network
Climate Change Finance Facility (CCFF) Call for proposals: "Use of Renewable Energy Resources in the Household Sector (1st round) ( from 28 January - 24.
NEF Renewables5 th June 03HEF Conference The Log Pile Project NEF Renewables A Department of The National Energy Foundation Sandra Hayes Senior Project.
Biomass. Biomass Opportunities Significant growth opportunity Industrial wood waste Industrial mill residues Forest residues.
Ground Source Heat Pumps (Geothermal). Why use the ground? Ground Temperatures below ~10m near constant throughout the year.
Renewable Heat & Power Specialists GET - RENEWABLES Zero Carbon Home Damien Phillips – Manager, Green Energy Technology.
Workshop: Opportunities for Wood Heat from Forest Residues in Alaskan Communities Alaska Wood Energy Conference November 16 Fairbanks, Alaska Tom Miles.
Renewable Firewood Stoves; a community approach to widespread installation and fuelling suitable for future inclusion in the RHI Jeremy Thorp Cwm Harry.
Presented By : Joan Chamberlain Executive Director.
Biomass for heat and power production - opportunities for land owners and buildings managers Ian Tubby Biomass Energy Centre RRSP, October 2009.
Forestry Commission woodfuel objectives and activities in south east England Matthew Woodcock Programmes Manager.
Managing Trees for Energy Andrew Clark (Fuel Quality & Compliance Manager) Energy Made Better.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Economics and Social Benefits Eric Dodd HICEC Manager.
Brites – Fuel for the Future. Balcas the Business Established 1960’s - £90m turn over Leading timber products supplier Pioneered biomass renewable energy.
ANGUS BIOFUELS & SCOTTISH WOODFUEL SUPPLIES LTD UNIT 1 – ECO PARK UNIT 1 – ECO PARK CARSEVIEW ROAD CARSEVIEW ROAD FORFAR DD8 3BS FORFAR DD8 3BS OTHER BUSINESS.
Anglia Woodfuels - a case study Euroforenet Conference Sustainable Forest Management and Wood Energy: Developing Local Co-operation between Private and.
Page 1 AVC Group Delivering Heating Solutions for Social Housing AVC ALTERNATIVE ENERGY Saving energy Cutting Utility Costs Reducing Carbon Emissions.
VT Department of Forests, Parks & Recreation Wood Energy in Vermont January 2005 VT Department of Forests, Parks & Recreation.
WOODFUEL FOR THE CONSTUCTION INDUSTRY Architects Point of View + Building Regulations.
Moor Heating Stephen Larkin The experience of having the first pellet boiler.
Canada APEC 2007 Building and Renewable Energy for Rural Areas Programs Mark Stumborg, P. Eng. Agriculture and Agri-Food Canada.
PRODUCTION OF WOOD CHIPS
1 CASE STUDY OF FUEL SWITCH IN THE LUDZA BOILER HOUSE Edgars Vīgants director of Ludzas Bio-Enerģija Latvia Bioenergy Association Latvian District Heating.
Green Partnerships Local Partnerships for Greener Cities and Regions BIOMASS Expert working group on biomass Prepared by Veronika Valentar.
SEGI-AT Sp. z o. o.Energy from the biomass2 Production of energy from the biomass - an option for the sustainable development of industrial land.
Proprietary work product, not for reproduction 1 BIOMASS GASIFIER 20 MW POWERPLANT Energy & Environmental Integrators Note! This system can be scaled from.
Starting a Community Woodfuel Initiative - Biomass Funding 28th November 2009 Ian Cowe Biomass Development Officer Forestry Commission Scotland Aberdeenshire.
UK Woodfuel Suppliers Group “Immediate priorities for the UK wood fuel supply chain” At EBEC Wednesday 5 th October 2011 Presentation by Robert Bland Chair.
WOOD STOVE ?????. Biomass Heat Generation Alternative & Economical Fuel SWCS SNEC 2010 Winter Meeting Bruce Payton, RIDEM Forest Environment.
Harvest residue utilization in small- and large-scale bioenergy Systems: 1 Julian Cleary, Post-Doctoral Fellow Faculty of Forestry University of Toronto.
Planning a Domestic Wood Fuel Installation Support and Advice Use Green Heat
Biomass Heating and the Renewable Heat Incentive.
Green Energy Engineering Ltd Call Now: www.geeltd.org 198a Lurgan Road, Dromore, Co.Down BT25 1HL COMMERCIAL RHI Heat your.
Wood Fuel Supply Chain Robin Almond RTS. Who are RTS? Timber Harvesting & Marketing Quarter of a million tonnes of timber per year Woodland Management.
Matt Smith, PhD Student in Natural Resources and Dr. John Aber Financial support from Hatch NH00605 and.
Crown capital eco management environmental news Source:
Wood Pellet Jung, Se Yong. Contents Ⅰ. COMPANY PROFILE Ⅱ. WHAT IS WOOD PELLET ? Ⅲ. KORINDO WOOD PELLET MILL.
Best Practice Chip Delivery, Storage & Handling And The Importance of Fuel Quality Nick Gough RTS Ltd Woodfuel Manager.
Energy from Biomass Quality Woodfuel Supply Ted Talbot & Jason Gallagher 26 th May 2010 Silvapower Ltd – Quality fuel supply for South Yorkshire.
Woodfuel supply chains present and future Ian Tubby PPG Woodfuel Officer Forestry Commission England.
Bioenergy in Energy Planning in Bosnia and Herzegovina
Biomass Energy Co- operative secures first contract SOLAMON ENERGY.
Energy in Agriculture 2016 On Farm Heat From Biomass Gurteen Agricultural College August 23 rd 2016
Biomass Understand the fundamental principles and
Bioenergy Hubs. Otago & Southland
R.Hermansson, J.Dahl, J.Lundgren, M.Lundqvist, G.Eriksson, B.Lundqvist
Presentation transcript:

ANGUS BIOFUELS PRESENTATION FORESTRY ENGINEERING GROUP 8 TH SEPTEMBER 2011

ANGUS BIOFUELS UNIT 1 – ECO PARK CARSEVIEW ROAD FORFAR DD8 3BS FUEL SUPPLIERS BILL WATSON TEL: FAX:

ANGUS BIOFUELS MAIN BUSINESS ACTIVITIES FORESTRY OWNER WOODCHIP PRODUCER BOILER INSTALLATION HEAT SUPPLY CONTRACTS

BIOMASS PLANT SITUATED AT DRAGONHALL FARM, PADANARAM, BY FORFAR OPENED BY JOHN SWINNEY PROJECT COSTS: £1.2 MILLION

ISSUES IN SETTING UP PLANT LOCATION TO TIMBER SUPPLY LOCATION TO BOILERS CAPITAL COST GRANT ASSISTED BY SSBS QUALITY OF CHIP MOISTURE CONTENT OF CHIP SIZE OF CHIP HANDLING OF WOOD FROM FOREST TO BOILER

BIOMASS PRODUCTS WOOD CHIPS – WET - ABOVE 30% M.C. WOOD CHIPS – DRY – BELOW 25% M.C. WOODCHIPS DRIED BY – NATURAL DRYING ARTIFICIAL DRYING

CHIPPERS HEIZOHACK 400 SCREEN CHIPPER JUNKKARI 500 DRUM CHIPPER JENZ 561 CHIPPER

STORAGE OF TIMBER/CHIP AIR DRYING = 5000 TONNES AT ROADSIDE = 3000 TONNES DRY CHIP = 2000 TONNES

WOODCHIP OUTPUT MAXIMUM OUTPUT = 100 TONNES OF DRY CHIP PER DAY I.E. 400,000 kWhrs OF HEAT TYPICAL HOUSE WILL USE APPROX 100 kWhrs TYPICAL PRIMARY SCHOOL WILL USE APPROX 5000 kWhrs

DELIVERY OF WOODCHIP ARTICULATED LORRY HI-LIFT TRAILER BULK TRAILER BLOWER TRAILER BULK BAGS

BOILER INSTALLATIONS CHOICE BETWEEN – WOODCHIP OR WOOD PELLET DRY WOODCHIP – LESS THAN 25% MC GENERALLY LARGER INSTALLATIONS LARGER FUEL STORAGE FACILITIES LOWER FUEL COSTS THAN PELLETS AT PRESENT. AROUND 3.5p/kWhr LONG SHELF LIFE

WET WOODCHIP- ABOVE 30% M.C. VERY LARGE BOILERS & POWER STATIONS MORE DELIVERIES PER ANNUM MORE CONTAMINATION SHORT SHELF LIFE DUE TO COMPOSTING & MOULDING PRICE SIMILAR TO DRY WOODCHIP

WOOD PELLETS IDEAL FOR SMALLER BOILER INSTALLATIONS LESS BULKY MORE EXPENSIVE – AROUND 4.5p/kWhr CAN BREAK DOWN IF GET DAMP OR WET LIMITED SHELF LIFE

BOILERS INSTALLED – 10KW TO 600KW BINDER FROELING VETO CALIMAX JANFIRE SONNYS GILLIES – Under consideration

CHOOSING A BOILER WHAT SIZE DO I NEED AND WHEN DO I NEED HEAT? HOW SOPHISTICATED DO I NEED? FUEL STORAGE AND DELIVERY? BACK-UP SERVICE? GO AND LOOK AT INSTALLED EXAMPLES ASK QUESTIONS DOES IT COMPLY WITH THE LOCAL ENVIRONMENTAL CRITERIA?

HEAT SUPPLY CONTRACTS FACTORS TO CONSIDER COST OF BOILER AND INFRASTRUCTURE PRICE FOR FUEL COST OF DELIVERY COST OF MAINTENANCE COST OF CLEANING/DE-ASHING SINKING FUND PROFIT

THANK YOU. DO YOU HAVE ANY QUESTIONS?