Chapter 4 Joint Problem Solving Brown Paper Company.

Slides:



Advertisements
Similar presentations
© 3M All Rights Reserved. Innovations in Permitting and Flexible Air Permitting as Well as Methods to Improve the Permitting Process Mark Manninen,
Advertisements

1 Report on Proposed Ozone Standards Report on Proposed Ozone Standards March 25, 2010.
New Source Review NSR Reforms Oklahoma Department of Environmental Quality Air Quality Council Presented by Matt Paque, Attorney, ODEQ - AQD April 20,
New Source Review (NSR) Program Basics
Air Pollution Control Program: Proposed Changes Presented to the Air Pollution Control Board April 2009.
Clean Air Act New Source Review (NSR) and Prevention of Significant Deterioration (PSD) Construction Permits Clean Air Program Manager USAG Environmental.
Energy and the Environment: Likely Winners & Losers in the Second Obama Administration ACG Breakfast - December 14, 2012 Copyright © by N.W. Bernstein.
Amerities West Public Information Meeting Thursday, February 27
Richard (Rick) Goertz, P. E
Copyright © 2009 Pearson Addison-Wesley. All rights reserved. Chapter 16 Stationary-Source Local Air Pollution.
National Ambient Air Quality Standards for Particulate Matter; Proposed Rule & 40 CFR Parts 53 and 58 Revisions to Ambient Air Monitoring Regulations;
Jan. EPA Final GHG Reporting Guidance (actually Dec ) Mar. 31stAnnual GHG Reporting AprilProposed HAPs or Mercury MACT July 1st Annual Toxic Release.
Southern Environmental Law Center Georgia Air Summit May 4, 2006.
Emissions Reductions Beyond the Clean Smokestacks Act (CSA) Emissions Reductions Beyond the Clean Smokestacks Act (CSA) Environmental Management Commission.
Update: National Ambient Air Quality Standards Association of California Airports September 15, 2010 Phil DeVita.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
GENERAL IDEAS IN AIR POLLUTION CONTROL
LAQM.PG(S)(09) – new biomass guidance. PG(S)(09) published in February Reflects changes since PG(S)(03) 2003: - biomass burning not a significant issue.
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
ADEQ Uses of ICF Modeling Analysis Tony Davis, Branch Manager – Air Planning Arkansas Department of Environmental Quality Criteria Pollutant Modeling Analysis.
Improving Air Quality: Controlling Stationary Sources Chapter 13 © 2007 Thomson Learning/South-WesternThomas and Callan, Environmental Economics.
Air Quality Beyond Ozone and PM2.5 Sheila Holman North Carolina Division of Air Quality 6 th Annual Unifour Air Quality Conference June 15, 2012.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
A&WMA Georgia Regulatory Update Conference Current State of the Air in GA Jac Capp, GA EPD, Branch Chief, Air Protection Branch April 16, 2013.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
SIP Steering Committee Meeting March 29,  In October 2011, EPA issued draft SIP and modeling guidance related to the 1-hour SO2 standard issued.
Kimberton, PA | Kennesaw, GA | Strategic Air Planning: Is the Time for a PAL Here? Mark Wenclawiak, CCM|
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
1. Carbon dioxide (CO 2 ) – Naturally occurring and man- made. 5,505.2 mmts emitted in 2009, GWP = 1 Methane (CH 4 ) - Naturally occurring and man-made.
Clean Air Act and New Source Review Permits EPA Office of Air Quality Planning and Standards Research Triangle Park NC March
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
Regulatory Requirements For Modeling. Air Quality Model Estimates Developing Air Pollution Control Plans Assessment of Environmental Impacts Projecting.
Improving Air Quality: Controlling Stationary Sources Chapter 12.
Clean Air Initiatives in the 109th Congress: Clear Skies, or Not-So-Clear Skies Clean Air Initiatives in the 109th Congress: Clear Skies, or Not-So-Clear.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
1 Mississippi Air Quality Update Mississippi Dept. of Environmental Quality Air Division August 5, 2011.
PSD/Nonattainment Review You can do this! Marc Sturdivant Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2015.
Wingra Engineering, S.C.1 Evaluation of Gas Turbine Air Quality Impacts from a Community Perspective Steven Klafka, PE Wingra Engineering, S.C Electric.
1 Status of SO 2 Implementation and Modeling Issues Michael Ling Associate Director, Air Quality Policy Division U.S. EPA, Office of Air Quality Planning.
Permitting and National Ambient Air Quality Standards Changes Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced.
National and Regional Programs to Reduce Ozone Transport Metropolitan Washington Air Quality Committee April 27, 2005.
ARE 309Ted Feitshans022-1 Unit 22 Clean Air Act of 1970.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
PSD Permitting Process Nancy Mayer EPA OAQPS. 2 Topics Find technical resources for permit review Describe how permits are constructed Describe what to.
Rules and Exceptions - The Costs of “Cheap” Coal.
NSR—Minor New Source Review Darrel Harmon U.S. EPA Office of Air and Radiation.
Resource Management Planning Air Quality Brock LeBaron Department of Environmental Quality Division of Air Quality
Clean Air Act The law that defines EPA's responsibilities for protecting and improving the nation's air quality and the stratospheric ozone layer. Draft.
National Ambient Air Quality Standards for Particulate Matter; Proposed Rule January 17, 2006.
SO 2 NAAQS Modeling MassCAIR Stakeholder Meeting December 13, 2011.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
2.14.  In 1970 the Environmental Protection Agency (EPA) was established  Required to set and enforce air quality standards  Air quality standard –
NAAQS Status in GA & PSD Inventory Update James W. Boylan Georgia EPD – Air Protection Branch Manager, Planning & Support Program AWMA Regulatory Update.
Regulatory background How these standards could impact the permitting process How is compliance with the standards assessed.
MPCA Citizens’ Board Meeting: United States Steel Corporation-Keetac Air Emissions Permit Owen Seltz Industrial Division September 13, 2011.
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
New Source As defined in the CAA, construction of a new source, or modification of an existing source, that will produce a significant increase in emissions.
First in Service First in Value
New Source Review (NSR) Program Basics
Clean Air Act Glossary.
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
16.4 Control of Air Pollution
Nonattainment NSR Permitting Process
Boiler Sheltered Initiative
Enforcing the NAAQS Case Study Sean Taylor
AIR Quality Control Concepts
National Ambient Air Quality Standards (NAAQS) Part 5: NAAQS and NSR
NEW JERSEY 1-HR SULFUR DIOXIDE (SO2) ATTAINMENT DEMONSTRATION
Particulate Matter Formation and Regulation
Presentation transcript:

Chapter 4 Joint Problem Solving Brown Paper Company

Competitive Bargaining Joint Problem Solving Mutually Beneficial Outcomes

Background

Brown Company Located in Berlin, NH Second largest employer in NH Four steam-generating boilers (numbers 6, 7, 9, 12) Boilers 6 and 7 dated from 1934 Boilers burn high sulfur fuel oil containing 2.2% sulfur Boilers emit 9,700 tons of sulfur per annum

State of New Hampshire New state implementation plan (SIP) requires burning 1% sulfur fuel oil This change would require Brown to acquire new equipment to handle the 1% sulfur oil

EPA Approves NHs SIP in 1972 Because of Arab oil embargo, state submits revision to SIP to allow use of 2.2% sulfur fuel oil EPA indicated that it would agree to the revision

EPA In 1976, EPA ordered Brown to address problems with its boilers that EPA claimed were causing a reduction in air quality due to particulates and sulfur dioxide (SO 2 ) Rescinded oral agreement with Brown regarding 2.2% sulfur fuel oil Labels Berlin a nonattainment area for particulates and SO 2 (stricter LAER v. cheaper BACT) In 1978, initiates formal action against Brown Brown files lawsuit against EPA

The First Formal Negotiation Session

Modeling Data EPA used the valley model, which assumed that plumes of smoke rose to a height at which their temperature matched the atmospheric temperature and then leveled off. Since stacks at Berlin were lower than surrounding peaks, the model predicted pollution on the peaks. Environmental Research Technology Group (ERT) Independent firm employed by Brown Focused on solutions other than 1% sulfur fuel oil Later introduced a new model

Boilers Possibility of raising smoke stacks Boilers 6 and 7 needed to be replaced soon Brown received a permit to allow it to convert boiler 9 to burn waste tree bark mixed with oil [+] Would reduce SO 2 to 50% current levels and reduce fuel costs [-] No guarantees; nonattainment designation still required 1% sulfer fuel oil Brown representative almost walks out of negotiations over modeling data

Negotiation of the Number 14 Boiler Control Strategy

New Boiler Proposal New number 14 boiler would burn without any oil infusion Cheaper than converting number 9 Reduce SO 2 emissions even more significantly Also allowed scrapping oldest boiler (number 6) and using number 7 only for emergency standby. Had to get new prevention of significant deterioration (PSD) permit from EPA EPA negotiator was more neutral about modeling data Brown used number 9 permit as leverage

New Boiler Proposal Issues Concerns over LAER requirements Could use BACT if could show that area would be an attainment area after project completion ERTs rough terrain dispersal model (RTD) Time required to get approval of new plan EPA would not let number 14 be covered by number 9 permit Decision that construction of number 9 had commenced

Modeling Discussion

NAAQS Study Used RTD model Assumptions: Stacks on 9 and 12 raised Boilers 6 and 7 shut down Filters installed Construction of boiler hour primary NAAQS violation for particulates 3 options 1.Taller stack or vent emissions for lime kilns and slackers Depended on ERTs assumptions about background particulates Reached a compromise; split the difference 2. Taller stacks of recovery boilers 8 and Decrease plant production

Options Implemented Taller stacks of recovery boilers 8 and 11 Needed to be replaced in 10 years New lime kilns and slackers Cost $1M, but saved money because of new boiler

Final Settlement