Design-Build Procurement Overview

Slides:



Advertisements
Similar presentations
1
Advertisements

© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
UNITED NATIONS Shipment Details Report – January 2006.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
CALENDAR.
District 4 Sign Assessment and Replacement Design- Build Project Request for Qualifications Information Meeting April 17 th, 2007.
Board of Early Education and Care Retreat June 30,
Mean, Median, Mode & Range
1 Solicitations/Advertisements Solicitations/Advertisements
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Results of the survey to parents / respondents on the quality of the services offered during the school year Presented on October 20,
The 5S numbers game..
Solve Multi-step Equations
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2013, 2009, 2006 Pearson Education, Inc.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
City Council Meeting Agenda Items October 28, 2013.
When you see… Find the zeros You think….
Training Monday, February 04, Saturday, October 11, Welcome to the Accounts Payable Invoice Processing Course.
Before Between After.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
Signs, Signals, and Pavement Markings
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
1 Phase III: Planning Action Developing Improvement Plans.
Intracellular Compartments and Transport
PSSA Preparation.
& dding ubtracting ractions.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Energy Generation in Mitochondria and Chlorplasts
Alternative Project Delivery
Presentation transcript:

Design-Build Procurement Overview August 2, 2011 Jeff Roby, P.E. – Design-Build Program Manager VDOT Alternate Project Delivery Office

Design-Build Success Battlefield Parkway – Leesburg Virginia

Project Overview 0.7 Miles 4 lanes 2 bridges, over 1200 ft long each

Battlefield Parkway – Leesburg Virginia

Battlefield Parkway – Leesburg Virginia

Battlefield Parkway – Leesburg Virginia

Battlefield Parkway – Leesburg Virginia Design-Builder – Shirley Design/Build, LLC (Lorton, VA) Project Cost - $35M RFQ – August 2006 Shortlist – October 2006 RFP – January 2007 Technical/Price Proposals Submitted – April 2007 Project Award – June 2007 (highest tech score/lowest price) Groundbreaking – January 2008 Open to Traffic – September 2009

25 -Current Design-Build Projects Awarded for Construction Bristol District 460 Connector Phase 1 - $90.0M ARRA Multiple Bridge Rehab – $4.7M ARRA Multiple Culvert Rehab – $2.9M Fredericksburg District ARRA Multiple Bridge Rehab – $6.6M Multiple Culvert Rehab – $3.1M Hampton Roads District Malbone Wetland Mitigation Site - $1.3M Middle Ground Boulevard - $32.6M Lynchburg District Rte 29 Bridge Replacement - $6.7 M ARRA Multiple Bridge Rehab – $9.5M Multiple Culvert Rehab – $3.0M

Current Design-Build Projects Awarded for Construction (cont.) Nova District I-66 Pavement Rehabilitation - $37.9M Pacific Boulevard Widening – $1.9M Rte 50 Widening – $67.8M Route 27/244 Interchange - $31.5M Pacific Boulevard Extension - $5.4M Richmond District Capital Trail (Sherwood Forest) – $8.8M Rte 36 BRAC – $7.3M I-295/Meadowville Interchange – 6.3M Salem District 1-81 Truck Climbing Lanes – $75.4M Rte 61 Bridge Replacement – $15.6M ARRA Multiple Culvert Rehab – 0.9M Staunton District 1-81 Truck Climbing Lanes - $74.2M ARRA Multiple Bridge Rehab – $9.0M Clifton Forge Bridge Replacement – 3.5M

Candidate Design-Build Projects Nova District I-66 Active Traffic Management - $32.3M 2 Bridge Replacements - $3M Salem District Valley View Interchange – $70.9M Staunton District I-64 Exit 91 Interchange - $43.3M Culpeper District I-64 Zion Crossroads Interchange - $7.9M

Design-Build Procurement

AASHTO Guide for Design-Build Procurement Proposal Evaluation Plan should be: Fair Equitable Transparent

AASHTO Guide for Design-Build Procurement Guidelines for Evaluation Planning Be as explicit and as objective as possible with all evaluation criteria Clearly state the evaluation criteria and weight given for each item Ensure that the evaluation team is highly qualified and understands how to apply the criteria Clearly state the requirements of the RFP including what will be considered a non-responsive proposal

VDOT Evaluation Basics Goal of evaluation is to select the best value proposal in terms of price and quality Offerors have expectations that they will be treated fairly and in accordance with the “rules” laid out in the procurement documents Offerors are given opportunity to ask questions related to the procurement documents Evaluation team has the right to seek a clarifications to fully understand information contained in a proposal As a public agency, procurement must be ready to respond to public scrutiny

Evaluation Objectives RFQ versus RFP RFQ Stage - Conceptual For qualifying/short listing Capabilities Demonstrated experience Key personnel Project understanding Relatively low cost for proposal preparation

Evaluation Objectives RFQ versus RFP RFP Stage - Detailed Detailed technical proposal with lump sum price Design concept Approach to construct project QA/QC program implementation Binding High cost for proposal preparation

RFP Evaluation Process Technical Proposal – Weighting 30% Price Proposal – Weighting of 70% Scoring Range Application Evaluation Criteria included for each submittal requirement Guidelines for Evaluation of Design-Build Proposals (on VDOT website)

Price Proposal Lump Sum Amount Proposal Guaranty Lowest Bid Receives Maximum Points Other Bids Pro-rated from Maximum Points Opened and Read Publicly Combined with Technical Score to Determine Overall Proposal Score

Combining Technical Score with Price Many Procurements – Highest Technical Score also has Lowest Price

Design-Build Procurement Challenges Scope issues during the RFP phase Adequate resources dedicated to evaluate proposals Defined process for evaluating proposals Bid protests

Bid Protest Case Study 460 Connector – Bristol, Virginia Twin high-level bridge structures approximately 1600 feet in length Mainline four-lane divided highway totaling approximately 4800 feet in length A two-lane connector road to Route 80, including a second multi-span bridge over Rte 768 and Hunts Creek Contract Value was estimated at $100M

Case Highlights $100M project derailed by a lawsuit VDOT prevailed at the temporary Injunction hearing Plaintiff pursued and case went to trial At trial plaintiff narrowed its protest to one ground, demonstrating years of experience on the resume form

The RFP stated: “The Right of Way Manager shall have at least ten (10) years of experience in managing complex right of way projects. Evidence of this experience will be of sufficient detail on the resume to satisfy the requirements.”

The RFP stated: “The Right of Way Manager shall have at least ten (10) years of experience in managing complex right of way projects. Evidence of this experience will be of sufficient detail on the resume to satisfy the requirements.”

Plaintiffs argument was two-fold: The years of experience listed in section (d) of the resume form did not constitute sufficient evidence to satisfy the requirements of the RFP. The experience and qualifications presented on the resume were not that of a Right of Way Manager.

460 Connector – Resume Form

Judges Decision was in favor of the Plaintiff: Providing a mere number of years of experience is not “sufficient detail” as anticipated by the RFP. Moreover, the Right of Way Manager failed to buttress his assertion with corresponding detail. The Court has determined that the resume was deficient in that it failed to provide evidence of sufficient detail to support the contention that the Right of Way Manager had more than the ten-year minimum experience required by the Department.

Victory from the jaws of defeat: Set in motion a change in process Realization VDOT had to make improvements to our procurement process Documented Procedures and Guidelines – “Guidelines for Evaluation of Design-Build Proposals” (On VDOT’S DB Website) Training for Evaluators Provide more time and resources for Technical Proposal Evaluations

Recommendations for moving ahead: Continued training of evaluation team members and design-build staff Define limited number of pertinent “differentiators” for each project Exploring 2-phase/lowest price for appropriate projects Exploring 1-phase/lowest price for appropriate projects

QUESTIONS ?