Manufacturing Operations

Slides:



Advertisements
Similar presentations
Capacity Planning For Products and Services
Advertisements

Capacity Planning For Products and Services
Unit 2 Manufacturing Operations Sections: 1.Manufacturing Industries and Products 2.Manufacturing Operations 3.Production Facilities 4.Product/Production.
Planning Production Activity Preview Planning Manufacturing Facilities Quantitative Tools in Production Planning Production Planning and Control Flexible.
MD707 Operations Management Professor Joy Field
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
CAPACITY LOAD OUTPUT.
Chapter 6 Product Design & Process Selection-Manufacturing
For Products and Services
Ch 3 Manufacturing Models and Metrics
(c) 2002 Contemporary Engineering Economics 1 Chapter 3 Cost Concepts and Behaviors General Cost Terms Classifying Costs for Financial Statements Cost.
Operations Management
Chapter 6 Cost of Production.
Topic on Production and Cost Functions and Their Estimation.
Process Selection and Capacity Planning
Cost Accounting. The Cost Object TimCo manufactures Chairs, each chair consists of Materials (Wood), Labor (A Carpenter) and Overhead (Rent, Utilities.
Chapter 5. What is Supply? The amount of a product that would be offered for sale at all possible prices that could prevail in the market. The producer.
Manufacturing Process Selection and Design
Chapter 5 Section 2.  Marginal Product of Labor ◦ The change in output from hiring one additional unit of labor  Increasing Marginal Returns ◦ Workers.
Chapter 6 Production Processes.
PRODUCTION AND ESTIMATION CHAPTER # 4. Introduction  Production is the name given to that transformation of factors into goods.  Production refers to.
Chapter 4 Process Design.
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
Chapter1Chapter1 ACCOUNTING FOR MANUFACTURING OPERATION.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
AP Microeconomics Costs in the Short Run. How would you label each of these curves? How are each of the three curves derived? TP: units of labor and the.
What is Production management? Production management is the process of effectively planning and regulating the operations of that part of an enterprise.
“Without the Cost of Waste …”
Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms: determining.
Contemporary Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010.
IE 469 Manufacturing Systems 469 صنع نظم التصنيع I- Performance Measure Tutorial.
EGR Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms:
Copyright 1998 Dekker, Ltd. 1. Copyright 1998 Dekker, Ltd. 2.
COMPUTER INTAGRATED MANUFACTURING. Production System A collection of people, equipment, and procedures organized to accomplish the manufacturing.
TOPIC 3 NOTES. AN INTRODUCTION TO DEMAND Demand depends on two variables: the price of a product and the quantity available at a given point in time.
Aim - Customer satisfaction at optimum cost. PRODUCTION MANAGMENT.
Production Planning and control – ME 1009 Unit 1 Introduction.
PRODUCTION MANAGEMENT
Tech 149: Unit 1  Introduction to CIM Technology.
SUPPLY.
Ch 3 Manufacturing Models and Metrics
What do you think supply is?
An Introduction to Supply
Analytical Tools for Process Analysis and Improvement
Chapter 5: Supply.
The University of Jordan Mechatronics Engineering Department
Week 13 COMPUTER INTEGRATED MANUFACTURING SYSTEM (CIMS)
Manufacturing Costs Computer Integrated Manufacturing
Cost Concepts and Design Economics
Introduction to Materials Management
Manufacturing Costs Computer Integrated Manufacturing
Standard Costs and Variances
The Theory of the Firm.
Cost Accounting-I Labor Costs.
IE 469 Manufacturing Systems
The Theory of the Firm.
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Manajemen Industri Instructor: Rama Oktavian
Facilities Planning and Design Course code:
Chapter 2 – Manufacturing Operations
Capacity Planning For Products and Services
Production and Operations Management
Principles of Cost Accounting 15th edition
Capacity Planning For Products and Services
The Theory of the Firm.
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Presentation transcript:

Manufacturing Operations Sections: Manufacturing Industries and Products Manufacturing Operations Production Facilities Product/Production Relationships Lean Production Manufacturing Metrics Manufacturing Lead Time Rate of Production Production Capacity Work in Progress Design Times Utilisation/Availability

Industrial Automation Architecture Enterprise Control Plant Control Cell Control Machine Controller Device Control (Sensors/Actuators) Level 4 Business Information (Business Office) Level 3 Level 2 Level 1 Industrial Automation (Shop Floor) Level 0

Manufacturing Lead Time Raw Materials Work in Progress Finished Goods Machine Group Transport Stores Inspect Operating Times Non-operating Times

Manufacturing Lead Time 30% Cutting 70% Positioning, Loading e.g. Set-up Time 5% On Machine 95% Moving and Waiting Time 1.5% of total time - adds value

Manufacturing Lead Time Operation Time Non-operation Time To = Operation Time per Machine Tno = Non-operation Time per Machine nm = Number of Machines MLT = nm ( To + Tno )

Manufacturing Lead Time Pallet of six parts Q = Number of parts MLT = nm ( QTo + Tno )

Manufacturing Lead Time Pallet of six parts Tsu = Set-up Time MLT = nm ( QTo + Tno + Tsu )

Manufacturing Lead Time Order #1 Order #2 Process Plan (Routing)

Manufacturing Lead Time In practice Q, Tsu, To, Tno and nm will vary considerably for different order quantities, process routing to find average or aggregate values before carrying out analysis. e.g.:

Operation Times Operation time has three elements: Tm = Actual Machining Time Th = Workpiece Handling Time Tth = Tool Handling Time To = Tm + Th + Tth

Rate of Production Total Batch Time per Machine Tsu + QTo Average Production Time per Part Tp = Tsu + QTo Q Rate of Production Rp = 1/Tp

Lead Times Job Shop (Q -> 1) Mass Production (Tsu + Tno -> 0)

Production Capacity Production Capacity, Pc Pc = WSwHRp W = number of work centres Sw = Number of shifts per week H = Hours per shift Rp = Rate of production (units per hour) If process plan requires Nm machines: Pc = WSwHRp / Nm

Demand Rate Weekly Demand Rate Dw = WSwHRp / Nm WSwH = DwNm/ Rp Three ways of adjusting capacity W (number of work centres) Sw (number of shifts per week) H (number of hours per shift i.e. overtime)

Work In Progress WIP : Amount of product currently located in the factory that is either being processed or is in between processing operations Generally: WIP = PC U (MLT) / Sw H

WIP Ratio WIP Ratio = WIP / Number of Machines Processing PC U (MLT) Sw H (MLT) WIP Ratio = QTo Tsu + QTo W U Ideal ratio: 1:1

Design Model Design Process generally involves six stages • Recognition of need • Definition of Problem • Synthesis • Analysis and Optimisation • Evaluation • Presentation

Design Model Many engineering hours spent in Design Let T1 = Time spent producing one unit of product T2 = Time spent planning and setting up production T3 = Time spent on design B = Aggregate number of batches produced Q = Aggregate batch size

Design Model TTLC = BQT1 + BT2 + T3 TLC = T1 + T2 /Q + T3/BQ Aggregate total time spent during life of product TTLC = BQT1 + BT2 + T3 Average time spent on each product TLC = T1 + T2 /Q + T3/BQ

Design Model In Mass Production and Batch Production T2 and T3 can be spread out among large number of units - dominant factor is T1 - automation is important In Job Shop Production all three times are important. T2 and T3 may become dominant terms - CAD/CAM is important

Worked Problem The average part produced in a certain batch manufacturing plant must be processed sequentially through six machines on average. Twenty (20) new batches of parts are launched each week. Average operation time = 6 min., average setup time = 5 hours, average batch size = 25 parts, and average non-operation time per batch = 10 hr/machine. There are 18 machines in the plant working in parallel. Each of the machines can be set up for any type of job processed in the plant. The plant operates an average of 70 production hours per week. Scrap rate is negligible. Determine (a) manufacturing lead time for an average part, (b) plant capacity, (c) plant utilization. (d) How would you expect the nonoperation time to be affected by the plant utilization?

Utilisation Utilisation, U = Output/Capacity Utilization: U = where Q = quantity actually produced PC = plant capacity

Availability Availability: A = where MTBF = mean time between failures, and MTTR = mean time to repair

Costs of Manufacturing Operations Fixed costs - remain constant for any output level Variable costs - vary in proportion to production output level Adding fixed and variable costs TC = FC + VC(Q) where TC = total costs FC = fixed costs (e.g., building, equipment, taxes) VC = variable costs (e.g., labor, materials, utilities) Q = output level

Breakeven Point Costs Quantity, Q Method 1: Manual Method 2: VC2 Automated FC2 VC1 Breakeven Point FC1 Quantity, Q

Manufacturing Costs Alternative classification of manufacturing costs: Direct labor - wages and benefits paid to workers Materials - costs of raw materials Overhead - all of the other expenses associated with running the manufacturing firm Factory overhead Corporate overhead

Overhead Rates Factory overhead rate: FOHR = Corporate overhead rate: COHR = where DLC = direct labor costs

Cost of Equipment Usage Hourly cost of worker-machine system: Co = CL(1 + FOHRL) + Cm(1 + FOHRm) where Co = hourly rate, €/hr CL = labor rate, €/hr FOHRL = labor factory overhead rate Cm = machine rate, €/hr FOHRm = machine factory overhead rate

Worked Problem The break-even point is to be determined for two production methods, one a manual method and the other automated. The manual method requires two workers at €9.00/hr each. Together, they produce at a rate of 36 units/hr. The automated method has an initial cost of €125,000, a 4-year service life, no salvage value, and annual maintenance costs = €3000. No labour (except for maintenance) is required to operate the machine, but the power required to run the machine is 50 kW (when running). Cost of electric power is €0.05/kWh. If the production rate for the automated machine is 100 units/hr, determine the break-even point for the two methods, using a rate of return = 25%. The solution requires familiarity with the Uniform Annual Cost (UAC) method of determining an annual amount payable (A) on a principle sum (P).