HIGH VOLTAGE POWER SUPPLY SYSTEM FOR CMS FORWARD SUBDETECTOR Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute for Nuclear Research.

Slides:



Advertisements
Similar presentations
A Low Output Ripple DC to DC converter topology using voltage overlapping technique The Power Electronics Lab., Hong Kong University C. P. Liu N. K. Poon.
Advertisements

April 4 AP Physics. In: How much energy is dissipated as heat in 20 s by a 100 Ω resistor that carries a current of 0.5 A? a)50 j b)100 j c)250 j d)500.
Physics 2025 : Analog Circuits / Digital Circuits Purpose of This Minilab Gain some basic experience in reading and building electronic circuits. Test.
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Selection and performance of PMT candidates for TREND ground array Hou Yueyun 1, Feng Zhaoyang 1, Liu Cheng 1 , Liu Maoyuan 1 1, IHEP 2, Tibet University.
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
Detectors. Measuring Ions  A beam of charged particles will ionize gas. Particle energy E Chamber area A  An applied field will cause ions and electrons.
MICE - Detector Safety/Integration. MICE - Detector Safety/Integration – Detectors external to Magnetic Volume  Detectors external to magnetic volume.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
1 New dividers for LAV photomultipliers G.Corradi,D.Tagnani,C.Paglia, M. Raggi LAV working group CERN 3/2/2010.
HF UPGRADE PROJECT Y. Onel PM June 11, Recent Highlights and News-I The PMT deliveries are now completed. Testing is going well. We had a meeting.
1 Light Collection  Once light is produced in a scintillator it must collected, transported, and coupled to some device that can convert it into an electrical.
I. Angelov UN/ESA/NASA/JAXA Workshop on the International Heliophysical Year 2007 and Basic Space Science 2-6 June 2008, Sozopol, Bulgaria Muon Telescopes.
1 TOF Aging Discussion Background information Summary of results so far Examples of gain loss mechanisms Diagnostics Possible scenarios for 2006 Discussion.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006 All data sheets can be found at:
Proposal for Generic R&D on EIC Detectors Yasar Onel University of Iowa.
Evaluation of Silicon Photomultiplier Arrays for the GlueX Barrel Calorimeter Carl Zorn Radiation Detector & Medical Imaging Group Jefferson Laboratory,
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
LNA DC Bias Module Approach Block Diagram Schematic Program Plan
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
Reaction Plane Detector Safety Review Abigail Bickley, for the RxnP Group University of Colorado June 22, 2006.
Upgrade of the CMS hadron outer calorimeter with SiPM’s
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
P.F.Timmer Nikhef Amsterdam Electronics- Technology Very low power, High Voltage base for a Photo Multiplier Tube for the KM3NeT deep sea neutrino telescope.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
Which of the signals below is a digital signal?
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
PHOTOMULTIPLIER HIGH VOLTAGE POWER SUPPLY SYSTEM FOR THE CMS FORWARD HADRON CALORIMETER Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute.
I. Vankov, NEC’2003, September ‘03, Varna HV PS System NEC’2003, September 03, VARNA CMS HCAL High Voltage Power Supply System Dimitrov L.(*), Kunov B.(*),
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
Techniques for Nuclear and Particle Physics Experiments By W.R. Leo Chapter Eight:
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
Integration of Forward Detectors, ZDC, and CASTOR into CMS Experiments Kevin Reynolds Michael Murray, Mentor David d'Enterria, Co-mentor 2006 Michigan.
Design of High Voltage System Kyungju Ma & Reno Collaboratiors
Control program for distributed high-voltage power supply system G. M. Mitev L. P. Dimitrov I. D. Vankov Nuclear Electronics Lab., Institute for Nuclear.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
1 LAPPD Team meeting 6/10/2010 Ossy Siegmund, Experimental Astrophysics Group, Space Sciences Laboratory, U. California at Berkeley Integration of Front-End.
RPC R&D collaboration meeting, CERN, High Energy Laboratory at INRNE, Sofia and RPC R&D collaboration High energy Physics Laboratory Scientific.
CMS History Compact Muon Solinoid Compact Relative to ATLAS, which is ~1.5x the diameter of CMS and 2x as long (but ATLAS is half the weight of CMS!).
PMT Tests for HF Upgrade Ugur Akgun. HF PMT Proposed Tests On Every PMT: – Rise Time – Negative Pulse Width – Transit Time – Transit Time spread – Single.
Christopher Cowden Advisor: Mario Spezziga Project: CMS HF (Forward Calorimeter)
Gigabit Ethernet: An Affordable Solution Preliminary Design G4 Gaurav Asthana James Denaro.
Gas detectors in a ZDC (at LHC) Edwin Norbeck and Yasar Onel University of Iowa For7 th CMS Heavy-Ion meeting at Delphi June 2003.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
G. Kieft Nikhef Amsterdam Electronics- Technology PMT tubes PMT bases PMT asic’s Automatic tester for PMT bases Camac test set-up for PMT tubes LeCroy.
Iowa PMT Test Station Ugur Akgun 1. HF PMT Proposed Tests On Every PMT: – Rise Time – Negative Pulse Width – Transit Time – Transit Time spread – Single.
PandaX 实验中的电子学概述 郭国栋 Outline Introduction Original scheme Improved scheme PMT base design in PandaX I and PandaX II Decoupler design in.
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
CERN LHC RF Power Systems
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
The dynamic range extension system for the LHAASO-WCDA experiment
Calorimeter Mu2e Development electronics Front-end Review
Analog FE circuitry simulation
HCAL M&O-B Budget CMS Finance Board
The Compact Muon Solenoid Detector
HE Calorimeter Upgrade Studies
Instrumentation for Colliding Beam Physics 2017
The resistance of a thermistor changes from 30k to 12k when the temperature changes from 20C to 70 C Calculate the sensitivity if resistance is taken.
Presentation transcript:

HIGH VOLTAGE POWER SUPPLY SYSTEM FOR CMS FORWARD SUBDETECTOR Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute for Nuclear Research and Nuclear Energy, BAS I. Vankov ET 2004, Sozopol, Sept. 2004

HV PSS for HF I. Vankov ET 2004, Sozopol, Sept. 2004

HV PSS for HF LHC TUNNEL I. Vankov ET 2004, Sozopol, Sept. 2004

Compact Muon Solenoid (CMS) HV PSS for HF HEHB HF2HF1 I. Vankov ET 2004, Sozopol, Sept. 2004

HV PSS for HF I. Vankov ET 2004, Sozopol, Sept VERY FORWARD HADRON CALORIMETER (HF) Copper Block Cherenkov Detectors – Embedded Quartz Fibers 1728 Photomultiplyers (PMTs) Type Hamamatsu R7525 (8 stages: 7 dynodes + anode)

PROBLEMS CLASSIC SOLUTION: INDIVIDUAL RESISTOR DIVIDERS – GENERATE ALL PMT VOLTAGES, BUT: 1. NEED 1728 HIGH VOLTAGE CHANNELS and m long HV CABLES - VERY EXPENSIVE 2. LARGE SPACE FOR THE 1728 DIVIDERS 3. GREAT POWER LOSSES IN THE DIVIDERS – PRODUCE MUCH HEAT HV PSS for HF I. Vankov ET 2004, Sozopol, Sept. 2004

HV PSS for HF SYSTEM CONSTRUCTION 72 READ OUT BOXES (ROBOXES) – 36 for HF1 and 36 for HF2 36 roboxes – divided to 4 group of 9 corresponding to the four HF quadrants IN EACH ROBOX – 3 PRINTED CIRCUIT BOARDS (PCBs) AT EACH PCB – 8 PMTs (with similar parameters)

HV PSS for HF I. Vankov ET 2004, Sozopol, Sept PRINTED CIRCUIT BOARD DIAGRAM

HV PSS for HF I. Vankov ET 2004, Sozopol, Sept PRINTED BOARD CIRCUIT WITH 8 PMTs ONE RESISTOR DIVIDER FOR THE FIRST 6 DYNODES WITH TOTAL RESISTANCE ABOUT 20 Mohms – MAX. CURRENT < 50 uA THREE SUPPLY VOLTAGES: U K = 2000 V; U D7 = 800 V; U D8 = 400 V RESULTS: STABLE VOLTAGE TO D7 AND D8 VERY LOW POWER LOSSES

HV PSS for HF I. Vankov ET 2004, Sozopol, Sept ONE QUADRANT HV SYSTEM STRUCTURE PS3 PS2 PS1 ROBOX No 1 3 PCs x 8 PMTs Cable No 1 Cable No 2 Cable No 9 9 HV cables L 15 m 1 HV cable L 150 m ROBOX No 2 ROBOX No 9 HV MODULE No 1 U U D7,1 LG U D8,1 U K,1 U U D7,2 LG U D8,2 U K,2 U D7,2 LG U D8,2 U K,2 U D7,1 LG U D8,1 U K,1 U D7,3 LG U D8,3 U K,3 U U D7,3 LG U D8,3 U K,3 9 HV CHANNELS = 1 MODULE 1 CHANNEL SUPPLIES 9 PCBs 3 GROUPS OF 72 PMTs WITH SIMILAR PARAMETERS 1x12 WIRES 150 m HV CABLE 2x2 WIRES 15 m CABLES

HV PSS for HF I. Vankov ET 2004, Sozopol, Sept HV CHANNELS PARAMETERS PARAMETERCHANNELS 1, 4, 7 CHANNELS 2, 5, 8 CHANNELS 3, 6, 9 Max. output voltage, V Voltage resolution step, V 111 Output ripple, mV P-P 300 Floating outputYes yes Max output current, mA 0,5 Long tem stability, %<0,1

HV PSS for HF I. Vankov ET 2004, Sozopol, Sept CONCLUSIONS 1.HV SYSTEM NEW SOLUTION: PMTs united in groups with similar parameters; Only first 6 dynodes supplied by resistor divider, D7 and D8 – from individual HV channels; 9 PCBs (72 PMTs) connected to each HV channel. 2. ACHIEVED RESULTS: Drastically decreasing of numbers of the long HV cables – 8 instead of 144; Decreasing of the power losses and heating Drastically decreasing of the expenses