WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

Variation in home dialysis in the UK Dr Clare Castledine Registrar UKRR UK Renal Registry 2011 Annual Audit Meeting.
Utility Needs and Smart Grid for Major Storm Events July 11, 2013 Edward Gray, PE Director – Transmission and Distribution Engineering.
ALGEBRA Number Walls
UNITED NATIONS Shipment Details Report – January 2006.
NAPM, LLC November 2001 Report Pamela Connell (AT&T) Michael OConnor (Verizon)
CEAL Treasurers Report Toshie Marra UCLA March 21, 2007.
Single Window Government: Benefits and Limitations of Single Window Government Jackie Coolidge Lead Investment Policy Officer, IFC January 26, 2005.
Figure 1. Problems with Medical Bills or Accrued Medical Debt Increased, 2005–2007 Note: Income refers to annual income. In 2005 and 2007, low income is.
Investing in Energy Efficiency in Housing in Lithuania
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Gadsden City High School Construction Progress. Gadsden City High School March 30, 2005.
Year 6 mental test 5 second questions
National Pupil Database: Current content & structure Anna Barker Data Services Group DfES.
1 Understanding Multiyear Estimates from the American Community Survey.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
County-level Estimates of Leisure Time Physical Inactivity among Adults aged 20 years old Trends
3rd Middle East Metal Conference, May 2007, Fairmont Hotel, Dubai, UAE © 2007 MEsteel.com - All Rights Reserved. Mr Hadi Hami 1 IRAN STEEL MARKET.
ABC Technology Project
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
AEGEAN INTERCONNECTION PROJECT Athens, 24 th May, 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
INNOVATIVE STEPS BY MGVCL
1 Overview and Outlook for PPP Projects in Vilnius Mrs. Ruta Vainiene Adviser to the Mayor of the City of Vilnius November 22 nd, 2006 Vilnius.
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
National Geographic News September 2, Christian Science Monitor News Paper.
VOORBLAD.
15th EFI Conference – Granada 2001.
Promoting Regulatory Excellence Self Assessment & Physiotherapy: the Ontario Model Jan Robinson, Registrar & CEO, College of Physiotherapists of Ontario.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Jodhpur Discom PRESENTATION Sr. OFFICERS MEETIN DATED
1 Jodhpur Discom. 2 AG,DL & BPL CONNECTIONS Status of AG. DN deposited & connections Released ( ) 3.
Jodhpur Discom Presentation before Sh. Sudhansh Pant I.A.S. Chairman Discoms & Managing Director,J.V.V.N.L.,Jaipur
COMPUTER B Y : L K. WINDOWS INFORMATION B Y : L K.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Career Salary Your pension value at 6 April 2011 Further Information Understand how Career Salary benefits grow This presentation has been prepared to.
Name ____________________ Date ___________ Period ____.
Name ____________________ Date ___________ Period ____.
Recursive & Explicit Formulas
BY-LAWS COMMITTEE PRESENTATION MARCH 2007 PRESIDENTS CONFERENCE.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
©2004 Brooks/Cole FIGURES FOR CHAPTER 11 LATCHES AND FLIP-FLOPS Click the mouse to move to the next page. Use the ESC key to exit this chapter. This chapter.
Weekly Attendance by Class w/e 6 th September 2013.
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
1 RESTRUCTURED APDRP-II IN XI PLAN Scope of Part - B :  Strengthening of Distribution System. Fund Allocation of Part - B:  Proposed fund allocation.
Reactive Power Management - Case study -- Nandan Pathak (AE)
Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
We create possibilities of a better tomorrow Power Finance Corporation Ltd. 23 rd December 2011 Noida, UP Restructured APDRP By - V K Shah Executive Director,
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Sepam case studie EN 2007_01.ppt1 Installation single-line diagram G M Transformer 63KV / 6.3KV 10MVA Generator 2MVA 30A / 5s 6A continuous 1 CSH 30A /
1 POWER FOR ALL. 2 POWER TO ALL WBSEDCL - Overview Consumers151 Lakhs Peak Demand 5, 586 MW Energy Handled 38, 110 MU Total Revenue Rs.19,583Cr Number.
Transmission Substation 2004 Storm Season. Transmission & Substation 2 HURRICANE CHARLEY August 13, 2004 Transmission Sections Locked Out ………………………… 44.
Welcome.
'. \s\s I. '.. '... · \ \ \,, I.
A 6 mm cable with a length of 15 m has been installed
' '· \ ·' ,,,,
Tunnel hardware installation
Presentation transcript:

WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007

7 Towns Scheme Sanctioned on 20 th Nov 2002

Construction of LT Lines, 11 kV Lines, 11 kV-UG Cable & 33 kV Lines

Reconductoring of LT Lines, 11 kV Lines & 66 kV Lines

Installation of DTs, AB Switches & 9 KVAR LT Capacitors

New 66 kV, 33 kV Substations

Installation of DT, Feeder & Border Meters

Renovation & Modernization of DTs & Substations

Computerised billing of sections & Computerised data logging at SS

Meter Calibration & Consumer Indexing

Funds Position Funds Position

26 Towns Sanctioned on 20 th September 2004

Construction of 11 kV Lines, 11 kV-UG Cable & Reconductoring of 11 kV Lines

Installation of DTs, AB Switches & 9 kVAR LT Capacitors

Renovation & Modernization of DTs & Substations

Installation of DT, Feeder & Border Meters

Computerised billing of sections, Computerised data logging at S/S & Call Centre

Consumer Indexing

Funds Position

13 Towns Sanctioned on 23rd March 2005

Construction of 11kV Lines, 11kV-UG Cable & Reconductoring of 11kV Lines

Installation of DTs, AB Switches & 9kVAR LT Capacitors

Renovation & Modernization of DTs & Substations

Installation of DT, Feeder & Border Meters

Computerised billing of sections, Computerised data logging at SS & Call Centre

Consumer Indexing

Funds Position

THANK YOU THANK YOU