Natural water Retention Measures

Slides:



Advertisements
Similar presentations
Pilot Project - Atmospheric Precipitation - Protection and efficient use of Fresh Water: Integration of Natural Water Retention Measures in River basin.
Advertisements

1 Update on progress in SOE-drafting group. 2 Water Directors Steering of implementation process Chair: Presidency, Co-chair: Commission Strategic Co-ordination.
Twinning Project BG O7 IB EN 01 Strengthening the administrative capacity of Water Management authorities in Bulgaria for the implementation of Economic.
Blueprint to Safeguard Europe's Water Resources Dagmar BEHRENDT KALJARIKOVA Protection of Water Resources Unit Directorate General for Environment European.
Water scarcity drafting group Salzburg, June Dicembre 2004Brussels, 11 April 2006 Water Scarcity Drafting Group WD meeting Salzburg June 1st and.
EXPERIENCE IN PREPARING THE FLOOD RISK MANAGEMENT PLAN IN AUSTRIA CLEMENS NEUHOLD FEDERAL MINISTRY OF AGRICULTURE, FORESTRY, ENVIRONMENT AND WATER MANAGEMENT.
Brussels, 3 July 2012 Elisa Vargas, EVREN 2 nd Coordination Meeting Halting Desertification in the Júcar River Basin (HALT-JÚCAR-DES) 1/15 De la Marquesa.
Slide 1 WG F Brussels, April 2008 Water – the key to adapt to Climate Change Unit ‘Protection of Water & Marine Environment’ DG Environment, European.
MAES Working Group Meeting Brussels
Implementation of the 2009 work programme of the
Pilot River Basin Network: Environment Directorate
Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
New Work Programme and mandates 2005/2006
Marine Strategy Framework Directive (MSFD)
14th meeting of Working Group F on Floods
WG 2.B Integrated River Basin Management
WG 2.B Integrated River Basin Management
Assessment of 1st FRMPs and 2nd RBMPs
Report to SCG, 6th November 2008
Agenda item 6e) Update on progress elaboration of Article 4.7 Guidance
Proposed CIS Workshop on WFD Economic Issues
Water Directors meeting
CIS-Workshop on River Basin Management Plans
CIS work programme Ad-hoc activity on Economics
WG PoM and Natural water Retention Measures
SSG on WFD and agriculture
Towards WISE as a distributed system
Philippe QUEVAUVILLER
Marine Strategy Framework Directive (MSFD)
Pilot River Basin Activity
River Basin Management Plans
22nd WG D Meeting, 15/4/2012 Jacques Delsalle, European Commission
LIFE and the implementation of the Water Framework Directive
Information on projects
Cluster Knowledge Integration and Dissemination
WG C Groundwater Progress Report to SCG SCG-Meeting, 07/
Harmoni-CA initiative
Harmoni-CA initiative
Working group Ecological Flows
Ongoing work on CIS Guidance Article 4.7
DG Environment, Unit D.2 Marine Environment and Water Industry
Implementation EU White Paper Climate Change Adaptation Specific actions DG Environment Feedback from Expert Group Climate change and water Jacques Delsalle.
8-c) Expert Group & River Basin Network on WFD & Agriculture
Towards a Work Programme for the Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Water Directors Meeting 28 November.
Defining Natural Water Retention Measures WG PoM NWRM drafting group
Activity on WFD and Agriculture
ECOSTAT 2013 – 2015 Tasks and Deliverables
Commission's activities
Pierre Strosser – ACTeon On behalf of all NWRM study partners
Update WG Eflows activity and link with EcoStat
Assessment of 1st FRMPs and 2nd RBMPs
THE WATER FRAMEWORK DIRECTIVE (WFD)
Item 11. Overview of EG activities
European Commission activities
Water scarcity and drought
Progress report WG F Maria Brättemark, WFD Team, DG ENV.D.1, European Commission.
Water Science-Policy Interface (CIS-SPI) Progress report
DG Environment, Unit D.2 Marine Environment and Water Industry
Natural Water Retention Measures
The Blueprint and Council Conclusions:
Water Scarcity Drafting Group WD meeting Salzburg June 1st and 2nd of 2006 Leaders: Italy & France Pascal Berteaud France 1 Dicembre 2004 Brussels,
River Basin Management Plans
Commission activities
Scope and Outline of Policy Document
DG Environment, Unit D.2 Marine Environment and Water Industry
Brussels – 20 April 2007 European Commission - DG Environment
SCG May 2005 CIRCA review.
Water Director's Meeting December 2013, Vilnius DG Environment
Preparatory meeting for the establishment of the Project Coordination Group (PCG) for the implementation of the MSFD 13 November :00-13:30 European.
Assessment of Member States‘ 2nd River Basin Management Plans
Presentation transcript:

Natural water Retention Measures DG Environment Evdokia Achilleos CIS Working Group Floods October 17, Brussels 2013 (evdokia.achilleos@ec.europa.eu)

Working Group Deliverable PoM Guidance or other tool on NWRM Sharing Best Practices on Programmes of Measures Information exchange on funding measures outside CAP Agriculture Tools for delivery of NWRM and other WFD measures, in particular within the upcoming Rural Development Programmes ECOSTAT Intercalibration of ecological potential (including definition of measures) Ecological Flows Guidance on ecological parameters/ecological flows and hydrological parameters for assessing quantitative aspects (the volume and level or rate of flow) and link to GES (including implementation aspects) FLOODS - Resource document on the links between the WFD and FD to support the achievement of synergies and promote coordination and integration as appropriate. - Links with, and input to, other flood-related activities (including Developments in natural water retention measures (NWRM) ) Economics Review WATECO Guidance to clarify aspects linked to cost-recovery and cost/benefits analysis by 2014

Pilot Project: ''Atmospheric Precipitation - Protection and efficient use of Fresh Water: Integration of Natural Water Retention Measures in river basin management '' OBJECTIVES to build the knowledge base on NWRM to provide a detailed assessment of effectiveness, costs and benefits of NWRM to further develop and maintain a catalogue of measures and case studies and associated database integrated with WISE

Pilot Project: ''Atmospheric Precipitation - Protection and efficient use of Fresh Water: Integration of Natural Water Retention Measures in river basin management '' OBJECTIVES 4. to promote knowledge and best practice exchange: 5. To contribute to the WFD CIS and to identify or create operational tools that can be used at national, river basin, and/or local level to facilitate inclusion of NWRM in the 2nd or 3rd RBMPs and FRMPs.

NWRM Project Deliverables (1/5) 1. Detailed Database: electronic form including Catalogue of Measures and Case Studies formulated in a content management system, integrated with WISE and linked electronically to the practical guide. Typology of measures, assessment of impacts, costs and benefits, and implementation potential. Information includes biophysical impacts, benefits, costs and implementation issues with geographical references. Multilingual taxonomy for all elements of the metadata, covering all EU official languages for this database

NWRM Project Deliverables (2/5) 2. Practical Guide: electronic, linked electronically to the Database (WISE). Translated to all EU languages and address RB Managers. Methodology for measure selection and design on a catchment scale Factsheets on Individual Measures Methods that have/can been used assessing Costs, Benefits, and Cost Effectiveness of measure Related spatial planning information and tools

NWRM Project Deliverables (3/5) 2. Practical Guide (cnt): How to raise public awareness and use incentives to engage stakeholder agreements / support partnerships How to explore Funding potential and how to encourage private investments How to address related governance issues How to maintain network for sharing knowledge and experiences

NWRM Project Deliverables (4/5) 3. Set up networks of best practice exchange, organise meetings with practitioners and stakeholders: At least 4 sub-networks according to geographical location. Practitioners, people responsible for designing and implementing measures in response to EU Policy, as stakeholders, and technical experts. Purpose: capacity building, knowledge and experience sharing and contribution to the knowledge base and database and guide development. Continuity: expected that the structure and guidance and establishment of working practices can facilitate continuation of the networks after completion of this pilot project

NWRM Project Deliverables (5/5) 4. Publication material in all EU languages presentations electronic, and leaflets providing illustrative descriptions on the measures and information on the decision making process 5. Participation in the CIS / DG ENV group meetings: participate in relevant CIS working group meetings to present the output of the project and consult on the outcomes. Participation in relevant DG ENV workshops or other WFD /FD related meetings e.g River Basin Network meetings

Timing

Way Forward – Involvement of WG FLOODS Recommendations for potential case studies and practitioners for the project networks projects (that could be included in FRMPs/RBMPs) that take a multifunctional approach – examples of Natural Flood Risk Management Connect with WG PoM reps / participate in respective meetings Act as a consultation forum for the Pilot Project. Provide input for: Which aspects of the project are important for flood related issues (including specific requests for database structure and fields, and practical guide topics) How could this project contribute to facilitate and increase uptake of these measures for flood protection

Thank you for your attention