Speaker Scott Whaley - EIT Protecting & Ice Melting Westmans Distribution Lines.

Slides:



Advertisements
Similar presentations
Modeling Cold Load Pickup Eric Jung. Agenda Traditional methods of analysis Un-diversified load allocation Emergency capacity determinations Voltage drop.
Advertisements

Utility Needs and Smart Grid for Major Storm Events July 11, 2013 Edward Gray, PE Director – Transmission and Distribution Engineering.
Electricity Merit Badge
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Earthing of MV and LV Distribution Systems: A multi-faceted problem.

The Electrical GuruTM Paul W. Abernathy,CME
Electrical Installation
1S25 Arc Fault Monitor. 1S25 Arc Fault Monitor 1S25 Arc Fault Monitor Electrical arc short circuits in metal clad switchgear may occur for many different.
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
Table of Contents Electric Charge and Static Electricity
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
© Southwest Electrical Distribution Exchange (SWEDE) May 2, 2008 Materials and Equipment John Macek Application Director, S&C Electric.
BSA Electricity Merit Badge Electricity Merit Badge AC Alternating Current.
EET Survey of Electronics Chap Circuit protection devices Chap Electric Power.
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
SECTION 4 ELECTRIC MOTORS UNIT 19 MOTOR CONTROLS.
Chapter 7 SYSTEM PROTECTION
SUBSTATION MODELING: PROTECTION AND AUTOMATION
Scottsdale, AZ September 26, 2012 Western Underground Fall Conference Scottsdale, AZ September 26, 2012 Existing Primary Cable Fault Locating and Testing.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
SWEDE - April 26 th, Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.
Distribution Automation: Fault Detection, Isolation, and Restoration
Electrical Power Systems
POWER SYSTEM PROTECTION. Power system Generators Transformers Transmission lines »Underground cables »Overhead lines Distribution systems.
POWER SYSTEM PROTECTION
Electrical Distribution Systems
Internal Fault Detection in Padmounted Distribution Transformers Western Underground Committee Fall Meeting – 9/26/12 Paul Henault – IFD Corporation.
Grounding, bonding, and ground fault currents
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Practical Electricity. Recap…  5 important formulae: Q = Charge (Coulomb) I = Current (Ampere) t = time (second) V = Voltage or potential.
© ABB PTMV - 1, ABB Overhead Distribution Systems.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
3200 Electrical Test Equipment Calibrator The Total Solution to Electrical Test Equipment Calibration.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Introduction to switchgears
SERVICE ENTRANCE EQUIPMENT
Suggestion on How to Use
CHAPTER 17 ELECTRICITY. ELECTRIC CHARGE Charges Exert Force Atoms are composed of particles with ­charges. The law of electric charges states that like.
Electricity Notes 5 Electric Power – the rate at which _______________________ the rate at which _____________________ is converted into another form of.
132KV GSS PIPAR CITY JODHPUR
ECE 498HZ: Power Distribution System Analysis
HOUSE WIRING NOTES. Electricity  Proton – positive charge  Electron – Negative charge  Electricity = flow of electrons Conductor= electricity passes.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
AUTOMATIC CIRCUIT RECLOSER
Protection of Power Systems
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Chapter 4 Electrical Systems and Protection Chapter 4 Electrical Systems and Protection.
Sub Station.
Circuit Protection Unit 9.
Advanced Fuse-Saving Techniques
35kV Assessment SWEDE 2007 May 10, 2007.
the CERN Electrical network protection system
Circuits Electrical Wiring.
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Chapter 7 System Protection
ELECTRICAL POWER-II Electrical engineering sixth semester
The Electric Circuit.
Calculations: Transformers and Service Conductor Calculations
Current Current Electricity - involves the flow of electrons in a conductor Such movement of these free electrons creates an electric current.
EET 323 – Electrical System Design Lecture 9: Grounding
EUS 260 Capstone Project.
Review of Distribution Network Protection
A. Touching both terminals with the hands can cause electrical shock
Electrical components and systems
Presentation transcript:

Speaker Scott Whaley - EIT Protecting & Ice Melting Westmans Distribution Lines

Western Distribution Region The western distributions head office is located in Brandon There is currently five engineers helping maintain and develop the western distribution area Distribution system consists of: 4 kV (kilo volts), 8kV, 12kV and 25kV power lines Sub-transmission system consists of: 33kV and 66kV power lines

Distribution Infrastructure Hydro has approximately 150 stations in Western Manitoba Standard metal and wood sub stations New DSC stations There are over 500 feeders in Western Manitoba to protect Length of feeders vary to being very short in urban areas and can be quite long (20 miles) in rural locations

Distribution Infrastructure Distribution protection starts at the high side fuse/breaker at the station transformer and includes all distribution power lines up to the customer service transformer Station Transformer Distribution Power Lines Customer Service

Protective Equipment Reclosers (ACR) Automatic circuit recloser Use electronic & hydraulic Sectionalizers Detect current pulses to trip Fuses Expulsion fuses and current limiting fuses Circuit Breakers Mechanical circuit breakers

Protective Equipment FAULTED CIRCUIT INDICATERS (FCI) are installed on distribution lines where standard protective device such as an ACR, fuse or sectionalizer can not be installed FCIs are installed to eliminate the need to repeatedly test and energize U/G cables when there is a fault. This prevents permanent damage to the cable Aid In troubleshooting

Equipment Coordination Protective equipment must be properly set to allow for feeder coordination Protective equipment provides safety and reliability to both the customer and employees and helps locate line faults We install protective devices to prevent equipment damage

Protecting Distribution Lines Down line Recloser FusesRegulatorStation Recloser

Protecting Distribution Lines EXAMPLE

Fault current of 400 amps 50 amps ACR – 2A+2B Time for fast trip = 0.05 secs. Time for slow trip = 0.32 secs. Fault current of 400 amps Station ACR – MT= 240 amps, 2N+2E Time for fast trip = 0.22 secs. Time for slow trip = 4.30 secs.

Protecting Distribution Lines If we issue protection coordination setting correctly we can prevent damage to equipment MB Hydro has implemented standards for installing, protecting and rating equipment. These standards prevent damage to our infrastructure and reduce customer outages

Standards Drawing of a 1Ø Transformer

Ice Melting Ice melting is done by purposely placing a fault on a feeder. The line fault creates tremendous heat which melts the bonded ice. Each ice melt done on a distribution line must be calculated differently because line impedance predetermines the fault current values Length, conductor size, temperature and time must all be taken into account when melting

Ice Rolling Manually using ice rollers to remove built up ice on the power lines. The process is slow and time consuming and takes at least ½ hour to do 1 mile.

Ice Prone Areas Ice melting is incorporated into Hydros standards

Ice Detection System The system is built using an infrared camera to capture images of the conductor. It calculates and notifies staff if there is ice build up on the line The ice vision system uses an embedded computer with custom designed software to perform the ice monitoring calculations A web based application displays information which includes: Ice build up (thickness) on the conductor Temperature Wind Speed

Ice Detection Camera Every second represents 30 minutes

Thank You QuestionsandComments For career opportunities visit: