LHC External Collimation Review

Slides:



Advertisements
Similar presentations
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
Advertisements

European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Round table magnet discussion and conclusions CARE-HHH IR’07 animated by W. Scandale and F. Zimmermann.
F. Gianotti, AFP kick-off meeting, 20/9/2012 Recommendations for the next steps Reports from the:  Technical Review A.Henriques  Physics Review R.Hawkings.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
LHC Collimation Review 2013 Review Committee: Giorgio Apollinari (FNAL), Wolfram Fischer (BNL), Marzio Nessi (ATLAS), Carsten Omet (GSI), Rudiger Schmidt.
March 4, 2011Outlook and Guidance - Zisman1 MAP Outlook and Guidance Michael S. Zisman* Center for Beam Physics Accelerator & Fusion Research Division.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Tertiary Collimators in IP1/IP5 LARP Collaboration Meeting Pheasant Run, St. Charles, IL October 5-6, 2005 Fermilab LARP Collaboration Nikolai Mokhov,
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
Work required to have a proposal in June (for discussion) RA, CPM, 15/4/03.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
CERN Phase II Collimation Conceptual Review Summary 09 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
RWA, 4/11/2005 Review Movement & Motorization November 4 th, 2005 Program Introduction & Charge – R. Assmann Mechanical design & SPS results – O. Aberle.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
R. Assmann, June 2009 Operational Experience with the LHC Collimation System R. Assmann, CERN 8/6/2009 for the Collimation Project Team Visit TU Munich.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON CSN1 LNF 17 September 2007 Walter Scandale CERN.
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
Closing Session Report
CRYSTALS AS LONG-TERM IMPROVEMENT FOR LHC COLLIMATION
News and Introduction from CERN June 15th, 2005
CBP Biennial Strategy Review System
e-lens Readiness Review Introduction
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Lucio Rossi Project Leader
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
Steering Meeting of EuCARD
Steering Meeting of EuCARD
Upgrade Strategy for the Experimental Vacuum Systems
CLIC-ILC BDS & MDI work.
Capital Asset Projects executed by the
East Hall under construction
LCLS Linac Technical Design Review Charge
Intensity Evolution Estimate for LHC
CBP Biennial Strategy Review System
LHC Collimation Requirements
HiRadMat Test Facility
Andrei Seryi Materials for discussion TILC-08
The LHC Collimation Project Implementation of a Phased Approach
LARP Rotatable Collimators for LHC Phase II Collimation
TSF Upgrade Project Overview Resources Plans and Timetable
Wednesday June 30,  40-S2-A01 (open session)
Introduction and Requirements
LINX LINear collider IR X-ing facility at SLAC Snowmass 2001 July 11 Andrei Seryi, SLAC for NLC collaboration.
East Hall under construction
Presentation transcript:

LHC External Collimation Review Steve Myers

Timeline of Collimation Project September 2001 Start of Beam Cleaning Study Group / Collimation WG January 2002 CERN meeting on LHC collimators January 2003 AB Project on LHC Collimation + ATB group July 2003 Phased approach approved September 2003 Mechanical engineering started with TS department January 2004 Start of prototype production June 2004 New collimation layout in IR3 and IR7 August 2004 Installation of prototype collimators into SPS/TT40 Call for tender for series production December 2004 Contract for series production (FC)  Extremely tight schedule: Many CERN staff working very hard (fast)...  Before series production: External review of design decisions. Your report will be important input!

The Review Committee A. Drees BNL RHIC collimation design and operation G. Federici ITER Experience with carbon-based materials in fusion research J. Frisch SLAC Advanced collimators for Linear Colliders T. Markiewicz SLAC Linear Collider collimation, background to experiments N. Mokhov FNAL Collimation design and simulation (TEVATRON, SSC, ...) T. Raubenheimer SLAC Accelerator design, NLC project M. Seidel (chair) DESY HERA collimation design and operation, TESLA collimators, vacuum design V. Shiltsev FNAL TEVATRON operational experience and performance upgrades N. Simos BNL SNS collimators and targets  Committee members represent experience from various frontier accelerator projects (existing, under construction, planned). Material expertise from fusion research!

Charge to the Committee The committee should look into all aspects of the LHC collimation system and consider the following questions: Are the baseline assumptions for the collimation design reasonable? (minimal allowed beam lifetime, peak and average loss rates, impact models, betatron and momentum-induced losses, ...) Have the LHC collimation requirements been specified thoroughly and completely? Does the phased approach of the LHC collimation system address the requirements? Are the basic hardware choices correct and what problems should be expected (e.g. radiation damage to graphite)? Is the detailed engineering solution adequate or can any problems be identified? Are the preliminary thoughts on collimation set-up and operation reasonable? Where should additional focus be put for future work? A final report will be prepared and delivered to S. Myers and R. Assmann.

Collimation Review June/July 2004 Within timeline of the collimation project:  Last opportunity to review all aspects of the adapted solution in the cleaning insertions IR3 and IR7!  Focus is two-stage cleaning in IR3 and IR7 (assumptions, mechanical design, performance).  Please use this chance to look at the design decisions in technical detail and advise us on the basis of your experience and expertise.  About half of the time in open sessions will be for discussions. On behalf of the A&B department and the LHC project I would like to sincerely thank you for giving us the benefit of your valuable time and expertise. With your help the collimation project will be a big success