A Quick Look at a simple Shunt Cable Comp for the CMD OUT Line implemented on the (TRT) Barrel PP for the Final Input and Output Cables Mitch Newcomer.

Slides:



Advertisements
Similar presentations
CSED101 INTRODUCTION TO COMPUTING GREEDY APPROACH, DIVIDE AND CONQUER Hwanjo Yu.
Advertisements

FF - TB May 10th, L1 L0 FANOUT LOGIC ALICE general Trigger layout FEE LTU CTP L0 BUSY FEE L1 TTC vi VME BUS L2a, L2r L0 TTC ex CH A CH B L2a, L2r.
Designing Audio for AV Applications. Professional Audio Consultants UK Distribution & Wholesale.
1-1 Patterns and Inductive Reasoning
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
RL-RC Circuits & Applications SVES Circuits Theory
UKDC2 Stavelet with Tandem Converters Peter W Phillips.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
AR1FS Debugging Guide Critical Components Mitch Newcomer August
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Active Roof Repair Aids1 AR1FS Debugging Guide Critical Components Mitch Newcomer Feb 2005 **Note that this is a work in progress and will be updated from.
Signal Quality Study with Triple Jumper Board and EC board to PP Cable December 2, 2004 Mitch Newcomer.
Effects of Duty Cycle Variation of ‘BX’ at PP end of 100m cable March 1, 2005 Mitch Newcomer.
The Technion Israeli Institute of Technology Intel Inc. A cooperation of:
B wheel Board Gain Differences Mitch Newcomer May 5, 2005.
MB4 New compared with MB3: Digital drivers / transformer drivers options 14 OPAMPS instead of 4 Thinner coaxial cables Shorter umbilical Heater coil integrated.
Active Boards Grounding and Shielding at Penn Near Term Plan for Barrel Boards –In parallel to board layout verification Study /optimize / map noise with.
Requirements Model Inputs (Test Sequences) Expected outputs Implementation Verdict Author Generate Feedback.
XANTECH CORPORATION ● TELFAIR AVENUE ● SYLMAR, CA ● Product Spotlight ISM4 – Intelligent System Manager.
Power Distribution Studies at Fermilab Aida Todri, FNAL ATLAS/CMS Power WG Meeting March 31 st, 2010.
Electrical Circuits. Drawing Circuits 1) A cell, a bulb and a switch “in series” 2) A battery of cells, a switch and two bulbs in series.
Control Building Fiber Preliminary Design Review December 5, 2001.
Modelling of TPM noise problems Greg, following discussions and measurements with David and Senerath.
6 Feb (update) A.P.Kashchuk (LNF/INFN, on leave from PNPI) 1 Triple GEM is the best candidate for station M1 regions R1/R2 Triple GEM has better.
NOTES ON JITTER CLEANER BOX - G. Visser 1/23/2015 “barrel” to bypass this box keeping same cables and timing (within ~1 ns) POWER INPUT CABLE ON REAR red+,
8 Channel Fiber Optically Linked Data Acquisition System for Booster Modulators Tsatsu Nyamadi Norfolk State University Supervisor Rene Padilla Fermilab.
Paralleling capacitors to reduce high frequency output voltage ripple
Yan Carlo Rodriguez ECE 3551 Final Project.  To make a program that will change the person voice when using the microphone.  Make the LEDs turn on when.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
ECG Monitor Objective o Provide users an economical ECG monitoring device o Raise awareness to the importance of a healthy heart and living o Allow doctors.
Decision Making Theories in Neuroscience Alexander Vostroknutov October 2008.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
1 VFE/MGPA considerations for EE/VPT EB/EE electrical spec. differences: full-scale signal noise input capacitance dominated by: APD capacitance (x2) for.
Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal.
PMT HV Base Prototypes Evaluation Instrumentation Workshop LBNL July 23-24, 2003 Nobuyoshi Kitamura University of Wisconsin-Madison SSEC.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
A Waveform Consistency Test for Binary Inspirals using LIGO data LSC Inspiral Analysis Working Group LIGO-G Z LSC Meeting Andres C. Rodriguez.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Copyright © 2011 by Denny Lin1 Simple Synthesizer Part 3 Based on Floss Manuals (Pure Data) “Building a Simple Synthesizer” By Derek Holzer Slides by Denny.
Status of integrated preamplifiers for GERDA GERDA meeting – MPI Heidelberg, Feb 20-22, 2006 F. Zocca, A. Pullia, S.Riboldi, C. Cattadori.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
ASIC Activities for the PANDA GSI Peter Wieczorek.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
PLC Front Panel.
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
TIMING DETECTOR ELECTRONICS FRONT END ELECTRONICS - NINO JOSE DA SILVA –CT-PPS TIMING ENGINEERING REVIEW /
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
ECAL Front-end development
Project of Network Analysis
DC/DC Converter Flexibility Enables Adding Noise Reduction Circuitry
PLC Front Panel.
HPD with external readout
Mini-drawers, FE-ASIC , Integrator
تقویت کننده های عملیاتی
PLC Front Panel.
Preliminary CSC Trigger Results from September Testbeam
Lecture No 8.
PLC Front Panel.
Homing sequence: to identify the final state.
FEEDBACK AMPLIFIERS.
PLC Front Panel.
PLC Front Panel.
10/07/ /07/2019.
Impedance of the 2x50 to 100 ohm transformers.
Presentation transcript:

A Quick Look at a simple Shunt Cable Comp for the CMD OUT Line implemented on the (TRT) Barrel PP for the Final Input and Output Cables Mitch Newcomer March 8, 2005

Tests on TTC PP at Penn CMD OUT RCVR/Drive chain Tests Summarized here are using 15m mini twin-ax as PP input connected to an AR2BS and Newly chosen 100m cable to the TTC02. Threshold R / W comparison sequence works with 100% success rate for all values of threshold. No extra triggers are observed on CMD Out comparator output either in time with control signals or out of time when a 50 ohm series and 10pF shunt filter are used at the comparator input. DAC Read/Write Sequences are used for Scope Studies.

Patch Panel CMD OUT Readout Chain as (finally)Tested This leg was not used, but is here to suggest a possible stuffing option. Comparator input Filter

CMD Out In time noise CMD IN CMD Out Comparator in time Trigger. Before adding 50ohm/10pF Filter

Noise on CMD Out eliminated CMD IN CMD Out Comparator Output. After adding 50ohm/10pF Filter

CMD OUT at Input to PP 3 component Cable Comp

CMD OUT at Input to TTC02 Before Implementing Precomp on PP

CMD OUT at Input to TTC02 AFTER Implementing 3 component Precomp Preliminary Optimization (fourth attempt at component choice)