TONBRIDGE POWER GREEN LINE

Slides:



Advertisements
Similar presentations
Questions about AVR & PSS
Advertisements

Industry Brainstorm on increasing Export Capacity From Alberta to B.C. January, 2006.
Goshen Area Bus Reconfiguration
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
1 If I were to give grades today… > 80A A B B B C C C D D D-1
1 Blackout 2003 See:
1 Voltage Stability and Reactive Power Planning Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 Entergy Transmission Planning Summit.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
Stability analysis on WECC Systems with Wind Penetration and Composite Load Model Hyungdon Joo and Melissa Yuan Mentor Yidan Lu Professor Kevin Tomsovic.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
Electric Transmission Planning Local Area Planning Update Presentation to TRANSAC January 24, 2013.
Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
1 Local Area Planning Update to TRANSAC – Sept 16, 2015 Mitigation Update, Uncertainty Scenarios, VAR Margin Study.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Announcements Please read Chapter 6
Barrilla Junction Area Transmission Improvements Project
Local Area Planning Update to TRANSAC – September 15, 2016
WECC Load Modeling and Validation Group Meeting
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Team Members: Kyle Jones Mark Magee Jason Rippee
Ensuring Security of Supply in Estonian Transmission Grid
Grid Integration of Intermittent Resources
Western Electricity Coordinating Council
Presented by: LADWP November 14, 2017
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Malati Chaudhary (PNM Transmission Planning)
Project WECC-0100 Update Load Modeling Task Force
Determine Facility Ratings, SOLs and Transfer Capabilities
DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
Reliability Assessment Committee Reliability Workshop Priorities
Local Area Planning Update – TRANSAC
DEC System Voltage Planning - June 2018
Distributed Generation (DG) Modeling Criteria
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
Local Area Planning Update to TRANSAC – September 26, 2018
ECE 476 POWER SYSTEM ANALYSIS
MODELING DG IN BASE CASES
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Reliability Assessment Committee Reliability Workshop Priorities
MODELING DG IN BASE CASES
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
WECC Load Modeling and Validation Group Meeting
Malati Chaudhary (PNM Transmission Planning)
User Experience with New Solar PV Models California ISO
TPL Voltage Guideline Presented to TSS Baj Agrawal Arizona Public Service Co. 8/21/2017.
Palo Verde-COI RAS Retirement
Project WECC-0100 Update Load Modeling Task Force
Palo Verde-COI RAS Retirement
Planning Meeting November 4, 2010 Marv Landauer.
Presentation transcript:

TONBRIDGE POWER GREEN LINE parsons 110899 TONBRIDGE POWER GREEN LINE PLAN OF SERVICE PE&C1099.ppt

TONBRIDGE POWER GREEN LINE WECC VOLTAGE CRITERIA SYSTEM INTACT CONDITIONS: MAXIMUM 1.05 PER UNIT MINIMUM 0.95 PER UNIT N-1 CONTINGENCY CONDITIONS: MAXIMUM 1.10 PER UNIT MINIMUM 0.90 PER UNIT POST CONTINGENCY CONDITIONS: ALL VOLTAGE CHANGES < 0.02 PER UNIT OF PRE-CONTINGENCY LEVEL FOR: 230 KV BUSES BELOW 0.90 PER UNIT 500 KV BUSES BELOW 1.00 PER UNIT 10-30-2009

TONBRIDGE POWER GREEN LINE WECC TRANSMISSION INTERCONNECTION CRITERIA N-1 CONTINGENCY CONDITIONS: POWER SYSTEM SHALL BE OPERATED AT ALL TIMES SO THAT GENERAL SYSTEM INSTABILITY, UNCONTROLLED SEPARATION, CASCADING OUTAGES AND/OR VOLTAGE COLLAPSE WILL NOT OCCUR AS THE RESULT OF THE LOSS OF A SINGLE SYSTEM ELEMENT 10-30-2009

TONBRIDGE POWER GREEN LINE 10-30-2009

TONBRIDGE POWER GREEN LINE 10-30-2009

TONBRIDGE POWER GREEN LINE PLAN 3 – TONBRIDGE SS to GARRISON 230KV System Performance – Voltage Impacts System Intact: – No Significant Voltage problems N-1 Contingencies: Outage of Garrison-Taft 1 & 2, 500 kV Lines with Colstrip ATR With 950 MW WTG on-line – No significant Voltage Impacts Outage of Townsend-Garrison 1 & 2, 500 kV Lines with Colstrip ATR 10-30-2009

TONBRIDGE POWER GREEN LINE PLAN 3 – TONBRIDGE SS to GARRISON 230KV System Performance – Impacts on Area Transmission Facilities System Intact: – No Significant Line Loading problems N-1 Contingencies: Outage of Garrison-Taft 1 & 2, 500 kV Lines with Colstrip ATR With 950 MW WTG on-line – Overloaded Hot Springs 500/230 kV transformer 117 % Trip 300 MW WTG at Hay Lake – Hot Springs 500/230 kV transformer still overloaded 104 % Trip 650 MW WTG from Renewable Collector System (RCS) WTG – No significant increases on overloaded area facilities 10-30-2009

TONBRIDGE POWER GREEN LINE PLAN 3 – TONBRIDGE SS to GARRISON 230KV System Performance – Impacts on Area Transmission Facilities System Intact: – No Significant Line Loading problems N-1 Contingencies: Outage of Townsend-Garrison 1 & 2, 500 kV Lines with Colstrip ATR With 950 MW WTG on-line – No significant increases on overloaded area facilities Trip 300 MW WTG at Hay Lake – No significant increases on overloaded area facilities Trip 650 MW WTG from Renewable Collector System (RCS) WTG – No significant increases on overloaded area facilities 10-30-2009

TONBRIDGE POWER GREEN LINE PLAN 3 10-30-2009

TONBRIDGE POWER GREEN LINE 10-30-2009

TONBRIDGE POWER GREEN LINE PLAN 3A – TONBRIDGE SS to GARRISON 230KV System Performance – Voltage Impacts System Intact: – No Significant Voltage problems N-1 Contingencies: Outage of Garrison-Taft 1 & 2, 500 kV Lines with Colstrip ATR With 300 MW WTG on-line and 300 MW Transfer from Alberta – No significant Voltage Impacts Outage of Townsend-Garrison 1 & 2, 500 kV Lines with Colstrip ATR With 950 MW WTG on-line and 300 MW Transfer from Alberta – No significant Voltage Impacts 10-30-2009

TONBRIDGE POWER GREEN LINE PLAN 3A – TONBRIDGE SS to GARRISON 230KV System Performance – Impacts on Area Transmission Facilities System Intact: – No Significant Line Loading problems N-1 Contingencies: Outage of Garrison-Taft 1 & 2, 500 kV Lines with Colstrip ATR With 300 MW WTG on-line and 300 MW Transfer from Alberta – No significant increases on overloaded area facilities 10-30-2009

TONBRIDGE POWER GREEN LINE PLAN 3A – TONBRIDGE SS to GARRISON 230KV System Performance – Impacts on Area Transmission Facilities System Intact: – No Significant Line Loading problems N-1 Contingencies: Outage of Townsend-Garrison 1 & 2, 500 kV Lines with Colstrip ATR With 300 MW WTG on-line and 300 MW Transfer from Alberta – No significant increases on overloaded area facilities 10-30-2009

TONBRIDGE POWER GREEN LINE parsons 110899 TONBRIDGE POWER GREEN LINE PLAN 3A PE&C1099.ppt 14

Tonbridge Switching Station parsons 110899 TONBRIDGE POWER GREEN LINE Tonbridge Switching Station PE&C1099.ppt 15