Entry Capacity Substitution

Slides:



Advertisements
Similar presentations
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Advertisements

RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Entry Capacity Substitution Transmission Workstream – 6 th August 2009.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Consultation on disposal of part of NTS for CCS 11 May 2009 Bogdan Kowalewicz.
Entry and Exit Investment Process Outline Transmission Planning Code Workshop 3 5 th June.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
Transfers and Trades Transmission Workstream
Classification: Statoil Internal Status: Draft Mod 156/156a Questions regarding the proposals…
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Review Group 221: Option 3 – security provided after allocation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Entry Capacity Substitution Workshop 6 – 7 th January 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Review Group -140 Thoughts on additional information requirements.
Trades and Transfers Workshop, 6 th November 2007.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
Transfers and Trades Special Transmission Workstream
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Interactions with the implementation of RIIO-T1
Presentation to the BSC Panel
Presentation to the BSC Panel
Transmission Planning Code – Draft Document
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Planning Code
Transmission Workgroup 4th October 2012
Transmission Workstream 4th July 2007
Transmission Planning Code
Transmission Workstream, 6 August
Entry Capacity - update
Capacity Methodology Statements: Impact of Mod 452
Capacity Methodology Statements
Annual Review - Methodology Statements
Exit Capacity Substitution and Revision
Update on Exit Capacity Substitution and Revision
Development of Entry Capacity Substitution
Transmission Planning Code Review
The Treatment of “Spare / Sterilised” Capacity
Entry Capacity Transfer and Trade
Baseline Re-consultation
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Ofgem presentation to Gas Transmission Workstream
Optimisation of Entry Capacity Modification Proposal
Transmission Workstream 1st February 2007
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Commercial Arrangements For Gas Quality Service – Introduction
Incremental Entry Capacity Release Methodology Statement
Modification 0043 – Limitation on offering for sale unsold capacity
Entry Capacity Transfers - Constrained Period
Presentation transcript:

Entry Capacity Substitution Paul O’Donovan Gas Transmission Policy 7 June 2007

Outline What is capacity substitution? Policy objectives Current status Points to note

What is capacity substitution? Mechanism which allows unsold capacity to be exchanged for capacity at entry point(s) which is/are signalling a requirement for incremental capacity investment Represents a permanent shift of capacity from the donor(s) to the recipient(s), with donor ASEP capacity adjusted appropriately

Policy objectives Maximise use of existing Transmission network assets for the benefit of consumers Intention is to avoid both capacity sterilisation and unnecessary infrastructure investment while accommodating changing flow patterns NGG to make informed judgement on how unsold capacity can be put to use in other areas of the network that are signalling investment requirements Will be enforced through a new licence condition

Current status Methodology statement being consulted on – finishes 15 June Ofgem has two months within which to veto Would be longer if an Impact Assessment was deemed to be necessary Approval by mid-July would allow for implementation after September 07 QSEC

Points to note Targeted at avoiding unnecessary investment Potential impact on LTSEC strategies Trade & transfer